AL
Alabama DOT · Bid Tabulation
Contract 20260327004
GUARDRAIL AND GUARDRAIL END ANCHOR INSTALLATIONS ON CR-16 OVER LITTLE MULBERRY CREEK (SITES 1 AND 2) AND OVER SWIFT CREEK (SITES 3 AND 4)
- County
- CHILTON
- District
- 0504
- Letting
- March 27, 2026
- Bidders
- 2
Apparent low bid
ALABAMA GUARDRAIL, INC.
$129,306.00
Other bidders
C & H CONSTRUCTION SERVICES, LLC
$136,869.50
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | ALABAMA GUARDRAIL, INC. $129,306.00 | C & H CONSTRUCTION SERVICES, LLC $136,869.50 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| 206E008 | Removing Guardrail End Anchor (All Type) | 4 | EACH | $300.0000 | $1,200.00 | $500.0000 | $2,000.00 |
| 600A000 | Mobilization | 1 | LS | $4,000.0000 | $4,000.00 | $12,000.0000 | $12,000.00 |
| 630A001 | Steel Beam Guardrail, Class A, Type | 213 | LF | $25.0000 | $5,325.00 | $34.5000 | $7,348.50 |
| 630C079 | Guardrail End Anchor, Type 13 (MASH) | 4 | EACH | $3,500.0000 | $14,000.00 | $4,400.0000 | $17,600.00 |
| 630C080 | Guardrail End Anchor, Type 20 Series (MASH) | 16 | EACH | $3,000.0000 | $48,000.00 | $3,350.0000 | $53,600.00 |
| 630G003 | Steel Beam Guardrail for Culvert, Class A, Type 2, Case 3 | 219 | LF | $225.0000 | $49,275.00 | $195.0000 | $42,705.00 |
| 698A000 | Construction Fuel (Maximum Bid Limited to $ 4,000.00) | 1 | LS | $2,500.0000 | $2,500.00 | $1.0000 | $1.00 |
| 740B000 | Construction Signs | 313 | SQFT | $12.0000 | $3,756.00 | $5.0000 | $1,565.00 |
| 740E000 | Cones (36 Inches High) | 50 | EACH | $25.0000 | $1,250.00 | $1.0000 | $50.00 |
Source: public Alabama DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.