FL Florida DOT · Bid Tabulation

Contract T2A66

SR 500 (US ALT 27) AND SR 49 (US 129) AT CR 335A AND AT NW..

County
LEVY
Letting
May 20, 2026
Bidders
4
Apparent low bid WHITEHURST, V. E. & SONS, INC. $2,146,953.35
Other bidders WATSON CONSTRUCTION COMPANY, LLC $2,267,339.52 ANDERSON COLUMBIA CO., INC. $2,274,792.70 PREFERRED MATERIALS INC. $3,216,042.20

Bid Items - unit price and extension by bidder

Item Description Qty UOM WHITEHURST, V. E. & SONS, INC. $2,146,953.35 WATSON CONSTRUCTION COMPANY, LLC $2,267,339.52 ANDERSON COLUMBIA CO., INC. $2,274,792.70 PREFERRED MATERIALS INC. $3,216,042.20
Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
0101 1 MOBILIZATION 1 LS $298,630.0000 $298,630.00 $85,000.0000 $85,000.00 $321,136.7500 $321,136.75 $310,165.4100 $310,165.41
0102 1 MAINTENANCE OF TRAFFIC 180 DA (LS) $286,935.0000 $286,935.00 $150,000.0000 $150,000.00 $141,199.2500 $141,199.25 $416,920.2500 $416,920.25
0102 2200 SPECIAL DETOUR- TEMPORARY PAVEMENT 7,596 SY (LS) $91,155.0000 $91,155.00 $200,000.0000 $200,000.00 $87,891.6900 $87,891.69 $105,143.1200 $105,143.12
0102 2300 SPECIAL DETOUR- TEMPORARY EARTHWORK/BASE 409 CY (LS) $10,225.0000 $10,225.00 $110,000.0000 $110,000.00 $177,836.5900 $177,836.59 $155,269.8000 $155,269.80
0102 60 WORK ZONE SIGN 8,145 ED $0.3200 $2,606.40 $0.3000 $2,443.50 $0.2400 $1,954.80 $0.3000 $2,443.50
0102 71 16 TEMPORARY BARRIER, F&I, FREE STANDING 2,317 LF $26.8800 $62,280.96 $42.0000 $97,314.00 $23.2100 $53,777.57 $25.0000 $57,925.00
0102 71 26 TEMPORARY BARRIER, RELOCATE, FREE STANDING 2,066 LF $12.4000 $25,618.40 $42.0000 $86,772.00 $12.1100 $25,019.26 $11.5000 $23,759.00
0102 74 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD 10,680 ED $0.1100 $1,174.80 $0.1500 $1,602.00 $0.1300 $1,388.40 $0.1000 $1,068.00
0102 76 ARROW BOARD / ADVANCE WARNING ARROW PANEL 54 ED $5.4000 $291.60 $10.0000 $540.00 $57.1900 $3,088.26 $5.0000 $270.00
0102 78 1 TEMPORARY RAISED/RETROREFLECTIVE PAVEMENT MARKER, TYPE D 1,488 EA $5.6500 $8,407.20 $6.5000 $9,672.00 $5.5600 $8,273.28 $4.0000 $5,952.00
0102 89 1 TEMPORARY CRASH CUSHION, REDIRECTIVE OPTION 6 LO $1,075.0000 $6,450.00 $4,000.0000 $24,000.00 $1,819.3800 $10,916.28 $1,000.0000 $6,000.00
0102 99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY 870 ED $11.8500 $10,309.50 $15.0000 $13,050.00 $12.7100 $11,057.70 $11.0000 $9,570.00
0102115 TYPE III BARRICADE 861 ED $0.3200 $275.52 $0.3500 $301.35 $0.3200 $275.52 $0.3000 $258.30
0102150 1 PORTABLE REGULATORY, SIGN 108 ED $5.4000 $583.20 $6.0000 $648.00 $5.3000 $572.40 $5.0000 $540.00
0102150 2 RADAR SPEED DISPLAY UNIT 108 ED $5.4000 $583.20 $6.0000 $648.00 $5.3000 $572.40 $5.0000 $540.00
0102909 TEMPORARY RAISED RUMBLE STRIPS- PER DAY, INCLUDES ALL SETS AND RELOCATIONS 210 DA $32.2500 $6,772.50 $90.0000 $18,900.00 $79.4300 $16,680.30 $30.0000 $6,300.00
0104 10 3 SEDIMENT BARRIER 5,068 LF $2.0000 $10,136.00 $2.0000 $10,136.00 $3.8400 $19,461.12 $2.7700 $14,038.36
0107 1 LITTER REMOVAL 31.75 AC $430.0000 $13,652.50 $200.0000 $6,350.00 $291.2600 $9,247.51 $400.0000 $12,700.00
0107 2 MOWING 27.68 AC $430.0000 $11,902.40 $350.0000 $9,688.00 $423.6500 $11,726.63 $400.0000 $11,072.00
0110 1 1 CLEARING & GRUBBING 4.34 AC (LS) $36,380.0000 $36,380.00 $55,000.0000 $55,000.00 $51,319.0900 $51,319.09 $164,225.0800 $164,225.08
0120 1 REGULAR EXCAVATION 1,959.2 CY $15.0000 $29,388.00 $25.0000 $48,980.00 $18.0800 $35,422.34 $20.7400 $40,633.81
0120 6 EMBANKMENT 3,979.1 CY $20.0000 $79,582.00 $25.0000 $99,477.50 $29.9900 $119,333.21 $56.0900 $223,187.72
0160 4 TYPE B STABILIZATION 10,795 SY $10.0000 $107,950.00 $8.5000 $91,757.50 $7.1200 $76,860.40 $10.6300 $114,750.85
0285701 OPTIONAL BASE, BASE GROUP 01 2,878 SY $23.3000 $67,057.40 $18.5000 $53,243.00 $15.6900 $45,155.82 $12.9300 $37,212.54
0285704 OPTIONAL BASE, BASE GROUP 04 1,907 SY $20.7500 $39,570.25 $22.0000 $41,954.00 $18.2300 $34,764.61 $14.8500 $28,318.95
0285709 OPTIONAL BASE, BASE GROUP 09 3,146 SY $58.3000 $183,411.80 $54.0000 $169,884.00 $49.3600 $155,286.56 $89.6400 $282,007.44
0286 1 TURNOUT CONSTRUCTION/DRIVEWAY BASE- OPTIONAL MATERIALS 120 SY $25.0000 $3,000.00 $50.0000 $6,000.00 $93.9300 $11,271.60 $44.7300 $5,367.60
0327 70 11 MILLING EXISTING ASPHALT PAVEMENT, 2 1/4" AVG DEPTH 1,225 SY $5.0000 $6,125.00 $4.5000 $5,512.50 $7.6900 $9,420.25 $11.9600 $14,651.00
0327 70 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH 5,230 SY $5.5700 $29,131.10 $6.0000 $31,380.00 $4.2800 $22,384.40 $7.5100 $39,277.30
0327 70 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 3,233 SY $4.4200 $14,289.86 $2.5000 $8,082.50 $3.2000 $10,345.60 $9.0600 $29,290.98
0334 1 12 SUPERPAVE ASPHALTIC CONC, TRAFFIC B 9.9 TN $225.0000 $2,227.50 $250.0000 $2,475.00 $425.8100 $4,215.52 $1,023.1000 $10,128.69
0334 1 13 SUPERPAVE ASPHALTIC CONC, TRAFFIC C 141.8 TN $161.5000 $22,900.70 $250.0000 $35,450.00 $288.8500 $40,958.93 $263.3400 $37,341.61
0334 1 52 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 907.6 TN $161.5000 $146,577.40 $195.0000 $176,982.00 $176.1100 $159,837.44 $296.3000 $268,921.88
0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 279.6 TN $161.5000 $45,155.40 $195.0000 $54,522.00 $166.2600 $46,486.30 $359.0500 $100,390.38
0337 7 25 ASPHALT CONCRETE FRICTION COURSE, INC BIT, FC-5, PG 76-22 59 TN $280.0000 $16,520.00 $600.0000 $35,400.00 $268.3100 $15,830.29 $669.1000 $39,476.90
0337 7 81 ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 1,139.5 TN $161.5000 $184,029.25 $190.0000 $216,505.00 $154.9300 $176,542.74 $243.0300 $276,932.69
0350 30 13 CONCRETE PAVEMENT FOR ROUNDABOUT APRON, 12" DEPTH 100 SY $189.2500 $18,925.00 $250.0000 $25,000.00 $276.9600 $27,696.00 $176.0500 $17,605.00
0520 2 8 CONCRETE CURB, TYPE RA 122 LF $90.6500 $11,059.30 $70.0000 $8,540.00 $37.0700 $4,522.54 $84.3000 $10,284.60
0546 72 3 GROUND-IN RUMBLE STRIPS, 8" SINUSOIDAL 1.602 GM $20,700.0000 $33,161.40 $9,520.0000 $15,251.04 $5,295.6700 $8,483.66 $10,609.8400 $16,996.96
0570 1 2 PERFORMANCE TURF, SOD 12,762 SY $2.6500 $33,819.30 $3.6000 $45,943.20 $5.6500 $72,105.30 $8.3600 $106,690.32
0630 2 11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH 113 LF $22.3000 $2,519.90 $24.1500 $2,728.95 $24.4600 $2,763.98 $15.8200 $1,787.66
0630 2 12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE 175 LF $46.4000 $8,120.00 $50.0000 $8,750.00 $33.3400 $5,834.50 $48.2300 $8,440.25
0635 2 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE 2 EA $1,963.0000 $3,926.00 $2,099.9000 $4,199.80 $1,479.4500 $2,958.90 $1,464.8300 $2,929.66
0639 2 1 ELECTRICAL SERVICE WIRE, FURNISH & INSTALL 198 LF $9.0000 $1,782.00 $10.3500 $2,049.30 $12.4400 $2,463.12 $13.7400 $2,720.52
0660 2106 LOOP ASSEMBLY, F&I, TYPE F 4 AS $1,752.0000 $7,008.00 $1,875.0000 $7,500.00 $2,180.1100 $8,720.44 $2,014.9000 $8,059.60
0700 1111 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF 15 EA $484.0000 $7,260.00 $450.0000 $6,750.00 $651.8400 $9,777.60 $450.0000 $6,750.00
0700 1112 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, 12.0- 20.0 SF 2 EA $2,040.0000 $4,080.00 $750.0000 $1,500.00 $1,064.1900 $2,128.38 $1,895.0000 $3,790.00
0700 13 15 RETROREFLECTIVE SIGN STRIP- FURNISH AND INSTALL, 5' 8 EA $80.6500 $645.20 $225.0000 $1,800.00 $92.6800 $741.44 $75.0000 $600.00
0700 1500 SINGLE COLUMN GROUND SIGN ASSEMBLY, RELOCATE 15 EA $107.5000 $1,612.50 $150.0000 $2,250.00 $378.5000 $5,677.50 $100.0000 $1,500.00
0700 1600 SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE 5 EA $26.9000 $134.50 $75.0000 $375.00 $78.2300 $391.15 $25.0000 $125.00
0700141122 ENHANCED HIGHWAY SIGN ASSEMBLY, AC POWERED, F&I GROUND MOUNT, W/2 BEACONS, 12-20 SF OF STATIC SIGN PANELS 6 EA $3,332.0000 $19,992.00 $3,600.0000 $21,600.00 $10,610.9800 $63,665.88 $8,790.1100 $52,740.66
0700141801 ENHANCED HIGHWAY SIGN ASSEMBLY, AC POWERED, RELOCATE BEACON(S), SIGN TO REMAIN 2 EA $237.0000 $474.00 $600.0000 $1,200.00 $1,053.0400 $2,106.08 $2,698.2200 $5,396.44
0700141902 ENHANCED HIGHWAY SIGN ASSEMBLY, AC POWERED, REMOVE - GROUND MOUNT 6 EA $336.0000 $2,016.00 $375.0000 $2,250.00 $1,514.0000 $9,084.00 $818.4300 $4,910.58
0705 10 1 OBJECT MARKER, TYPE 1 3 EA $290.7000 $872.10 $300.0000 $900.00 $365.8800 $1,097.64 $270.4000 $811.20
0706 1 3 RAISED PAVEMENT MARKER, TYPE B 341 EA $5.6500 $1,926.65 $6.5000 $2,216.50 $5.5600 $1,895.96 $4.0000 $1,364.00
0710 11101 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" 4.381 GM $1,882.0000 $8,245.04 $2,640.0000 $11,565.84 $1,853.4800 $8,120.10 $1,354.6900 $5,934.90
0710 11125 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" 21 LF $4.3000 $90.30 $15.0000 $315.00 $4.2400 $89.04 $2.0000 $42.00
0710 11201 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 6" 6.342 GM $1,882.0000 $11,935.64 $2,640.0000 $16,742.88 $1,853.4800 $11,754.77 $1,354.5700 $8,590.68
0710 90 PAINTED PAVEMENT MARKINGS, FINAL SURFACE 1 LS $16,125.0000 $16,125.00 $25,400.0000 $25,400.00 $15,887.0100 $15,887.01 $12,400.0000 $12,400.00
0711 11124 THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS AND CHEVRONS 319 LF $11.7000 $3,732.30 $8.0000 $2,552.00 $11.4900 $3,665.31 $10.0000 $3,190.00
0711 11125 THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK 140 LF $17.5000 $2,450.00 $10.0000 $1,400.00 $17.2400 $2,413.60 $8.5000 $1,190.00
0711 11141 THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" 0.069 GM $5,832.0000 $402.41 $20,000.0000 $1,380.00 $5,745.8000 $396.46 $4,173.9100 $288.00
0711 11160 THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL 4 EA $175.0000 $700.00 $650.0000 $2,600.00 $172.3700 $689.48 $300.0000 $1,200.00
0711 11170 THERMOPLASTIC, STANDARD, WHITE, ARROW 13 EA $117.0000 $1,521.00 $250.0000 $3,250.00 $114.9200 $1,493.96 $150.0000 $1,950.00
0711 11224 THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON 383 LF $11.7000 $4,481.10 $8.0000 $3,064.00 $11.4900 $4,400.67 $10.0000 $3,830.00
0711 11241 THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDE LINE /6-10 DOTTED EXTENSION LINE, 6" 0.027 GM $5,832.0000 $157.46 $20,000.0000 $540.00 $5,745.8000 $155.14 $3,555.5600 $96.00
0711 15101 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES WHITE, SOLID, 6" 0.056 GM $10,380.0000 $581.28 $20,000.0000 $1,120.00 $10,227.5300 $572.74 $6,071.4300 $340.00
0711 15131 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP 0.078 GM $2,333.0000 $181.97 $20,000.0000 $1,560.00 $2,298.3200 $179.27 $1,974.3600 $154.00
0711 15201 THERMOPLASTIC, STANDARD-OPEN GRADED ASPHALT SURFACES, YELLOW, SOLID, 6" 0.042 GM $10,380.7500 $435.99 $20,000.0000 $840.00 $10,227.5300 $429.56 $6,476.1900 $272.00
0711 16101 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" 1.284 GM $8,165.0000 $10,483.86 $7,920.0000 $10,169.28 $8,044.1300 $10,328.66 $6,778.8200 $8,704.00
0711 16201 THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" 1.814 GM $8,165.0000 $14,811.31 $7,920.0000 $14,366.88 $8,044.1300 $14,592.05 $6,785.0100 $12,308.01
0999 25 INITIAL CONTINGENCY AMOUNT, DO NOT BID 1 LS $50,000.0000 $50,000.00 $50,000.0000 $50,000.00 $50,000.0000 $50,000.00 $50,000.0000 $50,000.00

Source: public Florida DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.