FL Florida DOT · Bid Tabulation

Contract T3991

SR 30 (US 98) FROM W OF ST JOE INLET BRIDGE TO ICWW BRIDGE

County
GULF
Letting
May 20, 2026
Bidders
6
Apparent low bid C.W. ROBERTS CONTRACTING, INC. $2,120,387.55
Other bidders AMERICAN SAND & X-CAVATION, INC. DBA $2,394,196.62 ROBERTS AND ROBERTS, INC. $2,747,820.58 ANDERSON COLUMBIA CO., INC. $2,793,821.07 PIGOTT ASPHALT AND SITEWORK LLC $2,972,814.70 GULF COAST UTILITY CONTRACTORS, LLC $3,510,440.21

Bid Items - unit price and extension by bidder

Item Description Qty UOM C.W. ROBERTS CONTRACTING, INC. $2,120,387.55 AMERICAN SAND & X-CAVATION, INC. DBA $2,394,196.62 ROBERTS AND ROBERTS, INC. $2,747,820.58 ANDERSON COLUMBIA CO., INC. $2,793,821.07 PIGOTT ASPHALT AND SITEWORK LLC $2,972,814.70 GULF COAST UTILITY CONTRACTORS, LLC $3,510,440.21
Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
0101 1 MOBILIZATION 3 LS $30,533.3333 $91,600.00 $50,000.0000 $150,000.00 $61,000.0000 $183,000.00 $92,855.3333 $278,566.00 $133,333.3333 $400,000.00 $55,219.3333 $165,658.00
0102 1 MAINTENANCE OF TRAFFIC 705 DA (LS) $28,266.6667 $84,800.00 $25,000.0000 $75,000.00 $25,166.6667 $75,500.00 $51,793.3333 $155,380.00 $58,666.6667 $176,000.00 $47,928.4700 $143,785.41
0102 14 TRAFFIC CONTROL OFFICER 152 HR $81.0000 $12,312.00 $65.0000 $9,880.00 $75.0000 $11,400.00 $106.9500 $16,256.40 $100.0000 $15,200.00 $94.6000 $14,379.20
0102 60 WORK ZONE SIGN 16,808 ED $0.3000 $5,042.40 $0.3410 $5,731.53 $0.4000 $6,723.20 $0.3000 $5,042.40 $0.2500 $4,202.00 $0.8055 $13,538.84
0102 61 BUSINESS SIGN 6 EA $105.2100 $631.26 $121.0000 $726.00 $126.5000 $759.00 $12.8700 $77.22 $150.0000 $900.00 $268.4000 $1,610.40
0102 71 13 TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE 468 LF $52.6000 $24,616.80 $60.5000 $28,314.00 $63.3000 $29,624.40 $62.4500 $29,226.60 $1.0000 $468.00 $92.0200 $43,065.36
0102 74 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD 29,345 ED $0.1000 $2,934.50 $0.1100 $3,227.95 $0.2000 $5,869.00 $0.1800 $5,282.10 $0.0100 $293.45 $1.6700 $49,006.15
0102 74 8 CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE) 834 FD $0.2400 $200.16 $0.2750 $229.35 $0.3000 $250.20 $0.5900 $492.06 $0.1000 $83.40 $2.8700 $2,393.58
0102 99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY 797 ED $14.3500 $11,436.95 $16.5000 $13,150.50 $17.3000 $13,788.10 $35.6500 $28,413.05 $7.0000 $5,579.00 $94.3400 $75,188.98
0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 470 ED $13.5500 $6,368.50 $14.3000 $6,721.00 $16.1000 $7,567.00 $15.4500 $7,261.50 $5.0000 $2,350.00 $15.5400 $7,303.80
0102107 1 TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION 470 ED $14.5200 $6,824.40 $14.3000 $6,721.00 $17.3000 $8,131.00 $15.4500 $7,261.50 $5.0000 $2,350.00 $15.5400 $7,303.80
0102115 TYPE III BARRICADE 992 ED $0.9600 $952.32 $1.1000 $1,091.20 $1.2000 $1,190.40 $0.8900 $882.88 $1.0000 $992.00 $2.9000 $2,876.80
0104 10 3 SEDIMENT BARRIER 758 LF $3.3200 $2,516.56 $4.5000 $3,411.00 $5.0000 $3,790.00 $6.9500 $5,268.10 $4.0000 $3,032.00 $3.7800 $2,865.24
0104 18 INLET PROTECTION SYSTEM 52 EA $184.1700 $9,576.84 $200.0000 $10,400.00 $350.0000 $18,200.00 $178.2600 $9,269.52 $100.0000 $5,200.00 $592.6400 $30,817.28
0107 1 LITTER REMOVAL 138.22 AC $143.4700 $19,830.42 $75.0000 $10,366.50 $172.5000 $23,842.95 $59.4200 $8,213.03 $10.0000 $1,382.20 $166.4400 $23,005.34
0107 2 MOWING 74.14 AC $143.4700 $10,636.87 $75.0000 $5,560.50 $172.5000 $12,789.15 $59.4200 $4,405.40 $50.0000 $3,707.00 $170.6700 $12,653.47
0110 1 1 CLEARING & GRUBBING 0.44 AC (LS) $19,850.1100 $39,700.22 $25,000.0000 $50,000.00 $15,000.0000 $30,000.00 $13,864.1750 $27,728.35 $55,750.0000 $111,500.00 $5,095.7550 $10,191.51
0110 4 10 REMOVAL OF EXISTING CONCRETE 42 SY $26.2400 $1,102.08 $45.0000 $1,890.00 $150.0000 $6,300.00 $231.5000 $9,723.00 $100.0000 $4,200.00 $11.5000 $483.00
0120 1 REGULAR EXCAVATION 142 CY $32.0000 $4,544.00 $30.0000 $4,260.00 $32.5000 $4,615.00 $103.7100 $14,726.82 $60.0000 $8,520.00 $11.5000 $1,633.00
0120 2 2 BORROW EXCAVATION, TRUCK MEASURE 118.2 CY $31.4900 $3,722.12 $36.0000 $4,255.20 $30.0000 $3,546.00 $162.1400 $19,164.95 $100.0000 $11,820.00 $30.0000 $3,546.00
0160 4 TYPE B STABILIZATION 368 SY $17.1300 $6,303.84 $20.0000 $7,360.00 $25.0000 $9,200.00 $35.8500 $13,192.80 $12.0000 $4,416.00 $25.5800 $9,413.44
0285701 OPTIONAL BASE, BASE GROUP 01 322 SY $24.9300 $8,027.46 $24.0000 $7,728.00 $28.5000 $9,177.00 $82.2300 $26,478.06 $30.0000 $9,660.00 $14.5000 $4,669.00
0286 1 TURNOUT CONSTRUCTION/DRIVEWAY BASE- OPTIONAL MATERIALS 565 SY $21.6500 $12,232.25 $49.0000 $27,685.00 $35.0000 $19,775.00 $46.7700 $26,425.05 $30.0000 $16,950.00 $13.7700 $7,780.05
0327 70 19 MILLING EXISTING ASPHALT PAVEMENT, 3/4" AVG DEPTH 158 SY $13.0000 $2,054.00 $10.0000 $1,580.00 $4.0000 $632.00 $4.4500 $703.10 $5.0000 $790.00 $9.2000 $1,453.60
0327 70 4 MILLING EXISTING ASPHALT PAVEMENT, 3" AVG DEPTH 1,455 SY $4.2000 $6,111.00 $6.0000 $8,730.00 $5.0000 $7,275.00 $2.0400 $2,968.20 $4.0000 $5,820.00 $11.5000 $16,732.50
0327 70 6 MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH 56,531 SY $2.0200 $114,192.62 $1.7000 $96,102.70 $4.0000 $226,124.00 $1.6200 $91,580.22 $2.5000 $141,327.50 $9.2000 $520,085.20
0334 1 53 SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC C, PG76-22 120 TN $138.3500 $16,602.00 $170.0000 $20,400.00 $200.0000 $24,000.00 $165.3800 $19,845.60 $200.0000 $24,000.00 $230.9500 $27,714.00
0337 7 83 ASPHALT CONCRETE FRICTION COURSE,TRAFFIC C, FC-12.5, PG 76-22 4,846.3 TN $134.1500 $650,131.15 $142.0000 $688,174.60 $155.0000 $751,176.50 $146.4400 $709,692.17 $185.0000 $896,565.50 $242.0000 $1,172,804.60
0339 1 MISCELLANEOUS ASPHALT PAVEMENT 6.5 TN $554.8200 $3,606.33 $385.0000 $2,502.50 $1,000.0000 $6,500.00 $282.9100 $1,838.92 $400.0000 $2,600.00 $288.5000 $1,875.25
0425 1345 INLETS, CURB, TYPE P-4, PARTIAL 1 EA $12,672.4000 $12,672.40 $8,900.0000 $8,900.00 $31,000.0000 $31,000.00 $22,942.5900 $22,942.59 $12,000.0000 $12,000.00 $9,142.1900 $9,142.19
0425 5 MANHOLE, ADJUST 8 EA $1,732.5700 $13,860.56 $1,500.0000 $12,000.00 $1,750.0000 $14,000.00 $1,599.2300 $12,793.84 $1,800.0000 $14,400.00 $2,335.5700 $18,684.56
0430175112 PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 12"S/CD 32 LF $600.0500 $19,201.60 $60.0000 $1,920.00 $509.5000 $16,304.00 $447.8600 $14,331.52 $450.0000 $14,400.00 $228.7500 $7,320.00
0430175115 PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 15"S/CD 16 LF $740.3100 $11,844.96 $88.0000 $1,408.00 $519.5000 $8,312.00 $871.6200 $13,945.92 $500.0000 $8,000.00 $228.7500 $3,660.00
0430175118 PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 18"S/CD 24 LF $668.3900 $16,041.36 $100.0000 $2,400.00 $872.7000 $20,944.80 $579.3700 $13,904.88 $750.0000 $18,000.00 $240.0000 $5,760.00
0430175124 PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 24"S/CD 24 LF $676.4100 $16,233.84 $130.0000 $3,120.00 $866.5000 $20,796.00 $600.8200 $14,419.68 $850.0000 $20,400.00 $270.0000 $6,480.00
0430175130 PIPE CULVERT, OPT MATERIAL, ROUND, 30"S/CD 32 LF $660.2000 $21,126.40 $250.0000 $8,000.00 $377.3000 $12,073.60 $308.8600 $9,883.52 $350.0000 $11,200.00 $306.0000 $9,792.00
0520 1 10 CONCRETE CURB & GUTTER, TYPE F 178 LF $63.2800 $11,263.84 $70.0000 $12,460.00 $89.2000 $15,877.60 $75.0100 $13,351.78 $56.0000 $9,968.00 $40.9600 $7,290.88
0520 2100 CONCRETE CURB, RIBBON CURB 378 LF $84.8600 $32,077.08 $58.0000 $21,924.00 $164.9000 $62,332.20 $189.4000 $71,593.20 $85.0000 $32,130.00 $35.2100 $13,309.38
0520 6 SHOULDER GUTTER- CONCRETE 102 LF $70.1000 $7,150.20 $70.0000 $7,140.00 $135.6000 $13,831.20 $114.9300 $11,722.86 $80.0000 $8,160.00 $70.7700 $7,218.54
0522 2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK 182 SY $126.3000 $22,986.60 $118.0000 $21,476.00 $196.7000 $35,799.40 $156.8400 $28,544.88 $150.0000 $27,300.00 $149.2500 $27,163.50
0523 3 PATTERNED PAVEMENT 155 SY $239.1100 $37,062.05 $650.0000 $100,750.00 $212.8000 $32,984.00 $356.5200 $55,260.60 $56.0000 $8,680.00 $287.5700 $44,573.35
0527 2 DETECTABLE WARNINGS 267 SF $30.6100 $8,172.87 $35.0000 $9,345.00 $45.0000 $12,015.00 $38.0300 $10,154.01 $40.0000 $10,680.00 $36.9400 $9,862.98
0530 3 3 RIPRAP- RUBBLE, BANK AND SHORE 573.7 TN $102.7500 $58,947.68 $200.0000 $114,740.00 $225.0000 $129,082.50 $145.7600 $83,622.51 $175.0000 $100,397.50 $160.5400 $92,101.80
0530 74 BEDDING STONE 201.1 TN $101.3200 $20,375.45 $180.0000 $36,198.00 $241.4000 $48,545.54 $168.7500 $33,935.63 $160.0000 $32,176.00 $119.2400 $23,979.16
0536 1 1 GUARDRAIL -ROADWAY, GENERAL TL-3 97 LF $47.8200 $4,638.54 $55.0000 $5,335.00 $57.5000 $5,577.50 $59.4200 $5,763.74 $39.0000 $3,783.00 $53.3600 $5,175.92
0536 73 GUARDRAIL REMOVAL 106 LF $1.9100 $202.46 $2.2000 $233.20 $2.3000 $243.80 $2.3800 $252.28 $10.0000 $1,060.00 $13.5600 $1,437.36
0536 8122 GUARDRAIL TRANSITION CONNECTION TO RIGID BARRIER, F&I- INDEX 536- 002, APPROACH TL-3 1 EA $2,199.3800 $2,199.38 $2,529.4720 $2,529.47 $2,644.5000 $2,644.50 $2,732.7100 $2,732.71 $10,000.0000 $10,000.00 $8,051.9900 $8,051.99
0536 85 24 GUARDRAIL END TREATMENT- PARALLEL APPROACH TERMINAL 2 EA $2,085.0700 $4,170.14 $2,398.0000 $4,796.00 $2,507.0000 $5,014.00 $2,590.6700 $5,181.34 $3,200.0000 $6,400.00 $5,463.8500 $10,927.70
0538 1 GUARDRAIL RESET 78 LF $15.3000 $1,193.40 $17.6000 $1,372.80 $18.4000 $1,435.20 $19.0100 $1,482.78 $30.0000 $2,340.00 $36.8700 $2,875.86
0570 1 2 PERFORMANCE TURF, SOD 1,802 SY $7.2500 $13,064.50 $4.5000 $8,109.00 $10.6000 $19,101.20 $15.0600 $27,138.12 $4.0000 $7,208.00 $10.2300 $18,434.46
0630 2 11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH 245 LF $14.5200 $3,557.40 $18.7000 $4,581.50 $17.3000 $4,238.50 $20.2000 $4,949.00 $35.0000 $5,500.00 $27.6200 $5,354.45
0630 2 12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE 1,005 LF $33.8800 $34,049.40 $41.8000 $42,009.00 $40.3000 $40,501.50 $45.1600 $45,385.80 $39.0000 $39,195.00 $43.8900 $44,109.45
0632 7 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 1 PI $2,903.7900 $2,903.79 $5,500.0000 $5,500.00 $3,450.0000 $3,450.00 $5,941.9200 $5,941.92 $11,000.0000 $11,000.00 $6,038.9900 $6,038.99
0632 7 6 SIGNAL CABLE, REMOVE- INTERSECTION 1 PI $338.7800 $338.78 $880.0000 $880.00 $402.5000 $402.50 $950.7100 $950.71 $1,500.0000 $1,500.00 $1,207.7900 $1,207.79
0635 2 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE 22 EA $871.1400 $19,165.08 $1,540.0000 $33,880.00 $1,035.0000 $22,770.00 $1,663.7400 $36,602.28 $1,500.0000 $33,000.00 $1,628.7000 $35,831.40
0639 1122 ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER PURCHASED BY CONTRACTOR 3 AS $4,839.6500 $14,518.95 $4,950.0000 $14,850.00 $5,750.0000 $17,250.00 $5,347.7300 $16,043.19 $5,600.0000 $16,800.00 $5,272.1300 $15,816.39
0639 2 1 ELECTRICAL SERVICE WIRE, FURNISH & INSTALL 30 LF $19.3600 $580.80 $11.0000 $330.00 $23.0000 $690.00 $11.8800 $356.40 $15.0000 $450.00 $21.0900 $632.70
0641 2 12 PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE 3 EA $2,807.9700 $8,423.91 $2,420.0000 $7,260.00 $3,336.2000 $10,008.60 $2,614.4400 $7,843.32 $2,400.0000 $7,200.00 $2,626.4800 $7,879.44
0646 1 12 ALUMINUM SIGNALS POLE, FURNISH & INSTALL PEDESTRIAN DETECTOR POST 2 EA $1,161.5200 $2,323.04 $1,100.0000 $2,200.00 $1,380.0000 $2,760.00 $1,188.3800 $2,376.76 $2,500.0000 $5,000.00 $1,294.0700 $2,588.14
0650 2109 VEHICULAR SIGNAL AUXILIARIES, REPAIR/REPLACE/RETROFIT- FURNISH & INSTALL, BACKPLATE- FLEXIBLE REQUIRED 18 EA $451.0600 $8,119.08 $825.0000 $14,850.00 $535.9000 $9,646.20 $891.3000 $16,043.40 $600.0000 $10,800.00 $878.6900 $15,816.42
0660 2101 LOOP ASSEMBLY- F&I, TYPE A 7 AS $1,258.3100 $8,808.17 $1,540.0000 $10,780.00 $1,495.0000 $10,465.00 $1,663.7400 $11,646.18 $1,750.0000 $12,250.00 $1,651.4800 $11,560.36
0660 2102 LOOP ASSEMBLY, F&I, TYPE B 4 AS $1,064.7200 $4,258.88 $1,870.0000 $7,480.00 $1,265.0000 $5,060.00 $2,020.2500 $8,081.00 $1,800.0000 $7,200.00 $2,027.3800 $8,109.52
0660 2106 LOOP ASSEMBLY, F&I, TYPE F 8 AS $1,451.9000 $11,615.20 $2,090.0000 $16,720.00 $1,725.0000 $13,800.00 $2,257.9300 $18,063.44 $2,000.0000 $16,000.00 $2,221.4900 $17,771.92
0665 1 11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD 2 EA $459.7700 $919.54 $495.0000 $990.00 $546.3000 $1,092.60 $534.7700 $1,069.54 $500.0000 $1,000.00 $661.4100 $1,322.82
0682 1173 ITS CCTV CAMERA, NON- PRESSURIZED, IP, HIGH DEFINITION 2 EA $7,743.4400 $15,486.88 $7,700.0000 $15,400.00 $9,200.0000 $18,400.00 $8,318.7000 $16,637.40 $7,000.0000 $14,000.00 $8,195.7700 $16,391.54
0700 1111 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF 28 EA $463.8800 $12,988.64 $533.5000 $14,938.00 $557.8000 $15,618.40 $576.3700 $16,138.36 $550.0000 $15,400.00 $760.0100 $21,280.28
0700 1112 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, 12.0- 20.0 SF 2 EA $1,865.0900 $3,730.18 $2,145.0000 $4,290.00 $2,242.5000 $4,485.00 $2,317.3500 $4,634.70 $2,000.0000 $4,000.00 $862.7200 $1,725.44
0700 13 15 RETROREFLECTIVE SIGN STRIP- FURNISH AND INSTALL, 5' 1 EA $71.7300 $71.73 $82.5000 $82.50 $86.3000 $86.30 $89.1300 $89.13 $150.0000 $150.00 $230.0600 $230.06
0700 1600 SINGLE COLUMN GROUND SIGN ASSEMBLY, REMOVE 19 EA $23.9100 $454.29 $27.5000 $522.50 $28.8000 $547.20 $29.7100 $564.49 $60.0000 $1,140.00 $69.6200 $1,322.78
0700 1912 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I CANTILEVER GROUND MOUNT, 12.0-20.0 SF 1 EA $3,347.5800 $3,347.58 $3,850.0000 $3,850.00 $4,025.0000 $4,025.00 $4,159.3400 $4,159.34 $3,500.0000 $3,500.00 $3,450.8400 $3,450.84
0700 2600 MULTI-COLUMN GROUND SIGN ASSEMBLY, REMOVE 1 EA $239.1100 $239.11 $275.0000 $275.00 $287.5000 $287.50 $297.1100 $297.11 $250.0000 $250.00 $575.1500 $575.15
0700 3101 SIGN PANEL, FURNISH & INSTALL GROUND MOUNT, UP TO 12 SF 1 EA $191.2900 $191.29 $220.0000 $220.00 $230.0000 $230.00 $237.6800 $237.68 $250.0000 $250.00 $287.5700 $287.57
0700 3202 SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, 12-20 SF 4 EA $663.0300 $2,652.12 $1,320.0000 $5,280.00 $787.8000 $3,151.20 $1,426.0600 $5,704.24 $1,250.0000 $5,000.00 $1,452.2300 $5,808.92
0700 3501 SIGN PANEL, RELOCATE, UP TO 12 SF 4 EA $95.6500 $382.60 $110.0000 $440.00 $115.0000 $460.00 $118.8400 $475.36 $150.0000 $600.00 $86.2700 $345.08
0700 3601 SIGN PANEL, REMOVE, UP TO 12 SF 1 EA $47.8200 $47.82 $55.0000 $55.00 $57.5000 $57.50 $59.4200 $59.42 $100.0000 $100.00 $57.5200 $57.52
0700 3602 SIGN PANEL, REMOVE, 12-20 SF 4 EA $96.7900 $387.16 $148.5000 $594.00 $115.0000 $460.00 $160.4400 $641.76 $250.0000 $1,000.00 $222.8700 $891.48
0704 1 4 TUBULAR MARKER, 36" YELLOW POST 35 EA $167.3800 $5,858.30 $192.5000 $6,737.50 $201.3000 $7,045.50 $207.9700 $7,278.95 $200.0000 $7,000.00 $205.4100 $7,189.35
0706 1 3 RAISED PAVEMENT MARKER, TYPE B 4,985 EA $3.8300 $19,092.55 $4.4000 $21,934.00 $4.6000 $22,931.00 $4.7500 $23,678.75 $4.7500 $23,133.50 $4.6900 $23,314.22
0710 11101 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" 2.564 GM $1,909.9200 $4,897.03 $2,200.0000 $5,640.80 $2,300.0000 $5,897.20 $2,376.7700 $6,094.04 $1,600.0000 $4,102.40 $2,355.3000 $6,038.99
0710 11123 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR CROSSWALK AND ROUNDABOUT, 12" 480 LF $2.0600 $988.80 $2.3650 $1,135.20 $2.6000 $1,248.00 $2.5500 $1,224.00 $3.5000 $1,680.00 $3.0000 $1,440.00
0710 11124 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR DIAGONAL OR CHEVRON, 18" 515 LF $2.1000 $1,081.50 $2.4200 $1,246.30 $2.6000 $1,339.00 $2.6100 $1,344.15 $4.0000 $2,060.00 $2.7900 $1,436.85
0710 11125 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" 57 LF $4.7800 $272.46 $5.5000 $313.50 $5.8000 $330.60 $5.9400 $338.58 $10.0000 $570.00 $6.0500 $344.85
0710 11141 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6" 0.262 GM $1,138.9700 $298.41 $1,320.0000 $345.84 $1,380.0000 $361.56 $1,426.0600 $373.63 $1,600.0000 $419.20 $1,536.6400 $402.60
0710 11170 PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, ARROWS 48 EA $40.6500 $1,951.20 $46.7500 $2,244.00 $48.9000 $2,347.20 $50.5000 $2,424.00 $45.0000 $2,160.00 $53.9200 $2,588.16
0710 11201 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID, 6" 5.161 GM $1,912.5300 $9,870.57 $2,200.0000 $11,354.20 $2,300.0000 $11,870.30 $2,376.7700 $12,266.51 $1,600.0000 $8,257.60 $2,674.5600 $13,803.40
0710 11224 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SOLID FOR DIAGONAL OR CHEVRON, 18" 258 LF $2.1000 $541.80 $2.4200 $624.36 $2.6000 $670.80 $2.6100 $673.38 $4.0000 $1,032.00 $2.7900 $719.82
0710 11231 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, SKIP, 6" 0.095 GM $1,208.1100 $114.77 $1,320.0000 $125.40 $1,380.0000 $131.10 $1,426.0600 $135.48 $2,500.0000 $237.50 $2,118.9500 $201.30
0710 11241 PAINTED PAVEMENT MARKINGS, STANDARD, YELLOW, 2-4 DOTTED GUIDELINE/6-10 DOTTED EXTENSION, 6" 0.112 GM $1,024.7300 $114.77 $1,320.0000 $147.84 $1,380.0000 $154.56 $1,426.0600 $159.72 $2,500.0000 $280.00 $1,540.6300 $172.55
0710 90 PAINTED PAVEMENT MARKINGS, FINAL SURFACE 1 LS $33,475.8400 $33,475.84 $38,500.0000 $38,500.00 $40,250.0000 $40,250.00 $41,593.4800 $41,593.48 $25,000.0000 $25,000.00 $46,011.3300 $46,011.33
0711 11123 THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT 2,173 LF $3.3500 $7,279.55 $3.8500 $8,366.05 $4.1000 $8,909.30 $4.1600 $9,039.68 $5.0000 $10,865.00 $4.0500 $8,800.65
0711 11124 THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS AND CHEVRONS 1,984 LF $4.0600 $8,055.04 $4.6750 $9,275.20 $4.9000 $9,721.60 $5.0500 $10,019.20 $7.0000 $13,888.00 $1.1600 $2,301.44
0711 11125 THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK 511 LF $4.9300 $2,519.23 $5.6650 $2,894.82 $6.0000 $3,066.00 $6.1200 $3,127.32 $10.0000 $5,110.00 $6.0800 $3,106.88
0711 11141 THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" 0.469 GM $1,725.2900 $809.16 $1,980.0000 $928.62 $2,070.0000 $970.83 $2,139.0900 $1,003.23 $3,500.0000 $1,641.50 $2,084.7300 $977.74
0711 11160 THERMOPLASTIC, STANDARD, WHITE, MESSAGE OR SYMBOL 2 EA $239.1200 $478.24 $275.0000 $550.00 $287.5000 $575.00 $297.1100 $594.22 $250.0000 $500.00 $287.5800 $575.16
0711 11170 THERMOPLASTIC, STANDARD, WHITE, ARROW 99 EA $62.1700 $6,154.83 $71.5000 $7,078.50 $74.8000 $7,405.20 $77.2400 $7,646.76 $65.0000 $6,435.00 $75.5200 $7,476.48
0711 11180 THERMOPLASTIC, STANDARD, WHITE, YIELD LINE 12 LF $19.1300 $229.56 $22.0000 $264.00 $23.0000 $276.00 $23.7700 $285.24 $9.0000 $108.00 $23.9600 $287.52
0711 11224 THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" FOR DIAGONAL OR CHEVRON 664 LF $4.0600 $2,695.84 $4.6750 $3,104.20 $4.9000 $3,253.60 $5.0500 $3,353.20 $7.0000 $4,648.00 $4.9400 $3,280.16
0711 11241 THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDE LINE /6-10 DOTTED EXTENSION LINE, 6" 0.065 GM $2,207.2300 $143.47 $2,750.0000 $178.75 $2,875.0000 $186.88 $2,970.9600 $193.11 $5,000.0000 $325.00 $3,096.9200 $201.30
0711 14125 THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR CROSSWALK 936 LF $11.4800 $10,745.28 $13.2000 $12,355.20 $13.8000 $12,916.80 $14.2600 $13,347.36 $15.0000 $14,040.00 $13.8300 $12,944.88
0711 14160 THERMOPLASTIC, PREFORMED, WHITE, MESSAGE 16 EA $95.6500 $1,530.40 $110.0000 $1,760.00 $115.0000 $1,840.00 $118.8400 $1,901.44 $175.0000 $2,800.00 $115.0300 $1,840.48
0711 14170 THERMOPLASTIC, PREFORMED, WHITE, ARROW 16 EA $143.4700 $2,295.52 $165.0000 $2,640.00 $172.5000 $2,760.00 $178.2600 $2,852.16 $100.0000 $1,600.00 $179.7300 $2,875.68
0711 16101 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" 5.712 GM $4,637.1700 $26,487.52 $5,335.0000 $30,473.52 $5,577.5000 $31,858.68 $5,763.6600 $32,922.03 $6,000.0000 $34,272.00 $5,588.3000 $31,920.37
0711 16102 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 8" 0.169 GM $5,965.0900 $1,008.10 $6,820.0000 $1,152.58 $7,130.0000 $1,204.97 $7,367.9800 $1,245.19 $7,500.0000 $1,267.50 $7,146.7500 $1,207.80
0711 16201 THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" 4.341 GM $4,637.7300 $20,132.39 $5,335.0000 $23,159.24 $5,577.5000 $24,211.93 $5,763.6600 $25,020.05 $6,000.0000 $26,046.00 $5,630.8500 $24,443.52
0711 16231 THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SKIP, 6" 0.354 GM $2,127.7100 $753.21 $2,475.0000 $876.15 $2,587.5000 $915.98 $2,673.8700 $946.55 $5,000.0000 $1,770.00 $2,599.5200 $920.23
0711 17 1 THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN 1,520 SF $1.4300 $2,173.60 $1.6500 $2,508.00 $1.8000 $2,736.00 $1.7800 $2,705.60 $4.0000 $6,080.00 $1.7400 $2,644.80
0713103101 PERMANENT TAPE, WHITE, SOLID, 6" FOR CONCRETE BRIDGES 0.204 GM $28,130.9800 $5,738.72 $33,000.0000 $6,732.00 $34,500.0000 $7,038.00 $35,651.5600 $7,272.92 $40,000.0000 $8,160.00 $34,677.7000 $7,074.25
0713103201 PERMANENT TAPE, YELLOW, SOLID, 6" FOR CONCRETE BRIDGES 0.204 GM $28,130.9800 $5,738.72 $33,000.0000 $6,732.00 $34,500.0000 $7,038.00 $35,651.5600 $7,272.92 $40,000.0000 $8,160.00 $34,677.6500 $7,074.24
0715 1 12 LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 3,468 LF $4.8400 $16,785.12 $3.3000 $11,444.40 $5.8000 $20,114.40 $3.5700 $12,380.76 $3.0000 $10,404.00 $3.5300 $12,242.04
0715 61811 LIGHT POLE COMPLETE, F&I, STD POLE STD FOUNDATION, WILDLIFE SENSITIVE LUMINAIRE, 25' MOUNTING HEIGHT, 8' ARM LENGTH 19 EA $9,195.3400 $174,711.46 $11,000.0000 $209,000.00 $10,925.0000 $207,575.00 $11,883.8500 $225,793.15 $10,000.0000 $190,000.00 $11,517.9700 $218,841.43
0715 7 11 LOAD CENTER, F&I, SECONDARY VOLTAGE 3 EA $9,239.8600 $27,719.58 $16,500.0000 $49,500.00 $10,977.9000 $32,933.70 $17,825.7800 $53,477.34 $17,000.0000 $51,000.00 $17,350.1100 $52,050.33
0715500 1 POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONAL 19 EA $600.1200 $11,402.28 $825.0000 $15,675.00 $713.0000 $13,547.00 $891.3000 $16,934.70 $700.0000 $13,300.00 $874.8200 $16,621.58
0999 25 INITIAL CONTINGENCY AMOUNT, DO NOT BID 2 LS $25,000.0000 $50,000.00 $25,000.0000 $50,000.00 $25,000.0000 $50,000.00 $25,000.0000 $50,000.00 $25,000.0000 $50,000.00 $25,000.0000 $50,000.00
0999 26 LOCAL AGENCY INITIAL CONTINGENCY AMOUNT (DO NOT BID) 1 LS $3,586.9500 $3,586.95 $3,586.9500 $3,586.95 $3,586.9500 $3,586.95 $3,586.9500 $3,586.95 $3,586.9500 $3,586.95 $3,586.9500 $3,586.95