FL
Florida DOT · Bid Tabulation
Contract T3992
SR 10 (US 90) AT W SPENCER FIELD RD
- County
- SANTA ROSA
- Letting
- May 20, 2026
- Bidders
- 3
Apparent low bid
ROADS, INC. OF NWF
$1,461,249.95
Other bidders
C.W. ROBERTS CONTRACTING, INC.
$1,555,496.85
PANHANDLE GRADING & PAVING, INC.
$1,772,299.42
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | ROADS, INC. OF NWF $1,461,249.95 | C.W. ROBERTS CONTRACTING, INC. $1,555,496.85 | PANHANDLE GRADING & PAVING, INC. $1,772,299.42 | |||
|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 0101 1 | MOBILIZATION | 1 | LS | $127,242.0000 | $127,242.00 | $182,000.0000 | $182,000.00 | $115,475.0000 | $115,475.00 |
| 0102 1 | MAINTENANCE OF TRAFFIC | 180 | DA (LS) | $50,000.0000 | $50,000.00 | $74,000.0000 | $74,000.00 | $126,000.0000 | $126,000.00 |
| 0102 14 | TRAFFIC CONTROL OFFICER | 136 | HR | $87.0000 | $11,832.00 | $60.0000 | $8,160.00 | $100.0000 | $13,600.00 |
| 0102 60 | WORK ZONE SIGN | 9,296 | ED | $0.4000 | $3,718.40 | $0.4000 | $3,718.40 | $0.4500 | $4,183.20 |
| 0102 71 13 | TEMPORARY BARRIER, F&I, LOW PROFILE, CONCRETE | 312 | LF | $73.0000 | $22,776.00 | $68.0000 | $21,216.00 | $263.0000 | $82,056.00 |
| 0102 71 23 | TEMPORARY BARRIER, RELOCATE, LOW PROFILE CONCRETE | 144 | LF | $29.0000 | $4,176.00 | $27.0000 | $3,888.00 | $225.0000 | $32,400.00 |
| 0102 74 1 | CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD | 11,171 | ED | $0.1500 | $1,675.65 | $0.1500 | $1,675.65 | $0.2000 | $2,234.20 |
| 0102 76 | ARROW BOARD / ADVANCE WARNING ARROW PANEL | 197 | ED | $17.0000 | $3,349.00 | $16.0000 | $3,152.00 | $20.0000 | $3,940.00 |
| 0102 99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 1,067 | ED | $29.0000 | $30,943.00 | $27.0000 | $28,809.00 | $28.0000 | $29,876.00 |
| 0102104 | TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION | 180 | ED | $11.6000 | $2,088.00 | $20.0000 | $3,600.00 | $20.0000 | $3,600.00 |
| 0102107 1 | TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION | 180 | ED | $11.6000 | $2,088.00 | $18.0000 | $3,240.00 | $20.0000 | $3,600.00 |
| 0102115 | TYPE III BARRICADE | 110 | ED | $0.5000 | $55.00 | $0.5000 | $55.00 | $0.5500 | $60.50 |
| 0104 10 3 | SEDIMENT BARRIER | 608 | LF | $5.0000 | $3,040.00 | $3.8000 | $2,310.40 | $3.5000 | $2,128.00 |
| 0104 18 | INLET PROTECTION SYSTEM | 2 | EA | $420.0000 | $840.00 | $230.0000 | $460.00 | $750.0000 | $1,500.00 |
| 0107 1 | LITTER REMOVAL | 2.03 | AC | $600.0000 | $1,218.00 | $640.0000 | $1,299.20 | $655.0000 | $1,329.65 |
| 0107 2 | MOWING | 0.56 | AC | $2,150.0000 | $1,204.00 | $2,300.0000 | $1,288.00 | $2,400.0000 | $1,344.00 |
| 0110 1 1 | CLEARING & GRUBBING | 0.04 | AC (LS) | $30,000.0000 | $30,000.00 | $35,000.0000 | $35,000.00 | $55,000.0000 | $55,000.00 |
| 0110 4 10 | REMOVAL OF EXISTING CONCRETE | 72 | SY | $45.0000 | $3,240.00 | $39.0000 | $2,808.00 | $55.0000 | $3,960.00 |
| 0120 71 | REGULAR EXCAVATION (3-R PROJECTS ONLY) | 1 | LS | $10,000.0000 | $10,000.00 | $9,072.0000 | $9,072.00 | $22,500.0000 | $22,500.00 |
| 0285713 | OPTIONAL BASE, BASE GROUP 13 | 338 | SY | $90.0000 | $30,420.00 | $120.0000 | $40,560.00 | $66.7000 | $22,544.60 |
| 0327 70 6 | MILLING EXISTING ASPHALT PAVEMENT, 1 1/2" AVG DEPTH | 4,819 | SY | $3.5000 | $16,866.50 | $7.5000 | $36,142.50 | $4.5000 | $21,685.50 |
| 0334 1 52 | SUPERPAVE ASPHALTIC CONCRETE, TRAFFIC B, PG76-22 | 75.1 | TN | $186.0000 | $13,968.60 | $390.0000 | $29,289.00 | $180.0000 | $13,518.00 |
| 0337 7 81 | ASPHALT CONCRETE FRICTION COURSE,TRAFFIC B, FC-12.5, PG 76-22 | 425.4 | TN | $185.0000 | $78,699.00 | $240.0000 | $102,096.00 | $180.0000 | $76,572.00 |
| 0339 1 | MISCELLANEOUS ASPHALT PAVEMENT | 7.1 | TN | $440.0000 | $3,124.00 | $700.0000 | $4,970.00 | $950.0000 | $6,745.00 |
| 0400 4 1 | CONCRETE CLASS IV, CULVERTS | 14.8 | CY | $2,500.0000 | $37,000.00 | $3,900.0000 | $57,720.00 | $2,581.0000 | $38,198.80 |
| 0415 1 1 | REINFORCING STEEL- ROADWAY | 2,713 | LB | $2.0000 | $5,426.00 | $6.1000 | $16,549.30 | $1.2500 | $3,391.25 |
| 0425 1461 | INLETS, CURB, TYPE J-6, <10' | 1 | EA | $22,850.0000 | $22,850.00 | $25,000.0000 | $25,000.00 | $34,950.0000 | $34,950.00 |
| 0425 1523 | INLETS, DT BOT, TYPE C,JBOT, <10' | 1 | EA | $16,520.0000 | $16,520.00 | $19,000.0000 | $19,000.00 | $29,480.0000 | $29,480.00 |
| 0425 1910 | INLETS, CLOSED FLUME | 1 | EA | $5,435.0000 | $5,435.00 | $4,300.0000 | $4,300.00 | $16,650.0000 | $16,650.00 |
| 0430175136 | PIPE CULVERT, OPT MATERIAL, ROUND, 36"S/CD | 470 | LF | $223.0000 | $104,810.00 | $230.0000 | $108,100.00 | $420.0000 | $197,400.00 |
| 0430950 | DESILTING CONCRETE BOX CULVERT | 18.3 | CY | $1,150.0000 | $21,045.00 | $310.0000 | $5,673.00 | $605.0000 | $11,071.50 |
| 0430982138 | MITERED END SECTION, OPTIONAL ROUND, 36" CD | 2 | EA | $6,500.0000 | $13,000.00 | $7,100.0000 | $14,200.00 | $7,600.0000 | $15,200.00 |
| 0515 1 2 | PIPE HANDRAIL - GUIDERAIL, ALUMINUM | 14 | LF | $58.0000 | $812.00 | $54.0000 | $756.00 | $55.0000 | $770.00 |
| 0520 1 10 | CONCRETE CURB & GUTTER, TYPE F | 328 | LF | $38.0000 | $12,464.00 | $41.0000 | $13,448.00 | $53.4000 | $17,515.20 |
| 0520 70 | CONCRETE TRAFFIC SEPARATOR, SPECIAL- VARIABLE WIDTH | 6 | SY | $337.0000 | $2,022.00 | $290.0000 | $1,740.00 | $138.0000 | $828.00 |
| 0522 1 | CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK | 243 | SY | $75.0000 | $18,225.00 | $89.0000 | $21,627.00 | $65.0000 | $15,795.00 |
| 0522 2 | CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK | 56 | SY | $118.0000 | $6,608.00 | $180.0000 | $10,080.00 | $95.0000 | $5,320.00 |
| 0524 1 2 | CONCRETE DITCH PAVEMENT, NON REINFORCED, 4" | 3 | SY | $432.0000 | $1,296.00 | $370.0000 | $1,110.00 | $350.0000 | $1,050.00 |
| 0527 2 | DETECTABLE WARNINGS | 76 | SF | $29.0000 | $2,204.00 | $27.0000 | $2,052.00 | $55.0000 | $4,180.00 |
| 0536 1 1 | GUARDRAIL -ROADWAY, GENERAL TL-3 | 95 | LF | $29.0000 | $2,755.00 | $27.0000 | $2,565.00 | $27.5000 | $2,612.50 |
| 0536 7 2 | SPECIAL GUARDRAIL POST- SPECIAL STEEL POST FOR CONCRETE STRUCTURE MOUNT | 2 | EA | $350.0000 | $700.00 | $330.0000 | $660.00 | $330.0000 | $660.00 |
| 0536 73 | GUARDRAIL REMOVAL | 62 | LF | $2.3000 | $142.60 | $2.1500 | $133.30 | $22.0000 | $1,364.00 |
| 0536 85 26 | GUARDRAIL END TREATMENT- TYPE CRT | 2 | EA | $4,340.0000 | $8,680.00 | $4,100.0000 | $8,200.00 | $4,125.0000 | $8,250.00 |
| 0570 1 2 | PERFORMANCE TURF, SOD | 15 | SY | $7.0000 | $105.00 | $20.0000 | $300.00 | $55.0000 | $825.00 |
| 0570 1 3 | PERFORMANCE TURF, SOD AND SOIL- SHOULDER TREATMENT INDEX 570-010 | 476 | SY | $9.0000 | $4,284.00 | $9.5500 | $4,545.80 | $33.9700 | $16,169.72 |
| 0611 2 1 | ITSFM LOCATION DOCUMENTATION- INTERSECTION | 1 | EA | $3,470.0000 | $3,470.00 | $4,300.0000 | $4,300.00 | $3,300.0000 | $3,300.00 |
| 0630 2 11 | CONDUIT, FURNISH & INSTALL, OPEN TRENCH | 134 | LF | $23.0000 | $3,082.00 | $18.0000 | $2,412.00 | $22.0000 | $2,948.00 |
| 0630 2 12 | CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE | 215 | LF | $52.0000 | $11,180.00 | $76.0000 | $16,340.00 | $50.0000 | $10,750.00 |
| 0630 2 14 | CONDUIT, FURNISH & INSTALL, ABOVEGROUND | 36 | LF | $23.0000 | $828.00 | $43.0000 | $1,548.00 | $22.0000 | $792.00 |
| 0632 7 1 | SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL | 1 | PI | $17,000.0000 | $17,000.00 | $11,000.0000 | $11,000.00 | $16,500.0000 | $16,500.00 |
| 0632 7 6 | SIGNAL CABLE, REMOVE- INTERSECTION | 1 | PI | $1,100.0000 | $1,100.00 | $1,100.0000 | $1,100.00 | $1,100.0000 | $1,100.00 |
| 0635 2 11 | PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE | 13 | EA | $1,800.0000 | $23,400.00 | $1,700.0000 | $22,100.00 | $1,711.0000 | $22,243.00 |
| 0639 1112 | ELECTRICAL POWER SERVICE, F&I, OVERHEAD METER PURCHASED BY CONTRACTOR FROM POWER COMPANY | 1 | AS | $4,000.0000 | $4,000.00 | $6,000.0000 | $6,000.00 | $3,850.0000 | $3,850.00 |
| 0639 2 1 | ELECTRICAL SERVICE WIRE, FURNISH & INSTALL | 82 | LF | $11.0000 | $902.00 | $8.6500 | $709.30 | $11.0000 | $902.00 |
| 0639 3 11 | ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT | 1 | EA | $800.0000 | $800.00 | $1,100.0000 | $1,100.00 | $800.0000 | $800.00 |
| 0641 2 12 | PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE | 1 | EA | $2,500.0000 | $2,500.00 | $2,700.0000 | $2,700.00 | $2,420.0000 | $2,420.00 |
| 0641 2 70 | PRESTRESSED CONCRETE POLE, SHALLOW POLE REMOVAL- POLE 30' AND GREATER | 2 | EA | $9,200.0000 | $18,400.00 | $7,600.0000 | $15,200.00 | $8,800.0000 | $17,600.00 |
| 0646 1 11 | ALUMINUM SIGNALS POLE, PEDESTAL | 3 | EA | $5,700.0000 | $17,100.00 | $3,800.0000 | $11,400.00 | $5,500.0000 | $16,500.00 |
| 0646 1 60 | ALUMINUM SIGNALS POLE, REMOVE | 3 | EA | $500.0000 | $1,500.00 | $430.0000 | $1,290.00 | $550.0000 | $1,650.00 |
| 0649 21 25 | STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 78'-60' | 1 | EA | $170,000.0000 | $170,000.00 | $150,000.0000 | $150,000.00 | $167,200.0000 | $167,200.00 |
| 0649 21 26 | STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 78'-70' | 1 | EA | $180,000.0000 | $180,000.00 | $160,000.0000 | $160,000.00 | $176,000.0000 | $176,000.00 |
| 0650 1 34 | VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 3 SECTION, 1 WAY | 6 | AS | $2,300.0000 | $13,800.00 | $2,200.0000 | $13,200.00 | $2,200.0000 | $13,200.00 |
| 0650 1 36 | VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 4 SECTION, 1 WAY | 2 | AS | $2,800.0000 | $5,600.00 | $2,600.0000 | $5,200.00 | $2,750.0000 | $5,500.00 |
| 0650 1 38 | VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL POLYCARBONATE, 5 SECTION STRAIGHT, 1 WAY | 3 | AS | $3,700.0000 | $11,100.00 | $2,700.0000 | $8,100.00 | $3,520.0000 | $10,560.00 |
| 0653 1 11 | PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 1 WAY | 2 | AS | $1,700.0000 | $3,400.00 | $1,500.0000 | $3,000.00 | $1,650.0000 | $3,300.00 |
| 0653 1 12 | PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 2 WAYS | 1 | AS | $2,800.0000 | $2,800.00 | $2,700.0000 | $2,700.00 | $2,750.0000 | $2,750.00 |
| 0660 4 11 | VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL CABINET EQUIPMENT | 1 | EA | $38,000.0000 | $38,000.00 | $43,000.0000 | $43,000.00 | $36,300.0000 | $36,300.00 |
| 0660 4 12 | VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL ABOVE GROUND EQUIPMENT | 3 | EA | $17,000.0000 | $51,000.00 | $9,200.0000 | $27,600.00 | $16,500.0000 | $49,500.00 |
| 0665 1 11 | PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD | 4 | EA | $800.0000 | $3,200.00 | $540.0000 | $2,160.00 | $825.0000 | $3,300.00 |
| 0670 5500 | TRAFFIC CONTROLLER ASSEMBLY, RELOCATE CONTROLLER WITH CABINET | 1 | AS | $13,000.0000 | $13,000.00 | $11,000.0000 | $11,000.00 | $13,200.0000 | $13,200.00 |
| 0682 1173 | ITS CCTV CAMERA, NON- PRESSURIZED, IP, HIGH DEFINITION | 1 | EA | $9,000.0000 | $9,000.00 | $7,900.0000 | $7,900.00 | $8,800.0000 | $8,800.00 |
| 0685 1 14 | UNINTERRUPTIBLE POWER SUPPLY, FURNISH AND INSTALL, ONLINE/DOUBLE CONVERSION WITH CABINET | 1 | EA | $15,000.0000 | $15,000.00 | $14,000.0000 | $14,000.00 | $14,300.0000 | $14,300.00 |
| 0700 3201 | SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF | 2 | EA | $1,200.0000 | $2,400.00 | $1,100.0000 | $2,200.00 | $1,210.0000 | $2,420.00 |
| 0700 5 21 | INTERNALLY ILLUMINATED SIGN, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF | 2 | EA | $6,000.0000 | $12,000.00 | $4,300.0000 | $8,600.00 | $5,775.0000 | $11,550.00 |
| 0700 5 22 | INTERNALLY ILLUMINATED SIGN, FURNISH & INSTALL, OVERHEAD MOUNT, 12-18 SF | 2 | EA | $6,700.0000 | $13,400.00 | $5,400.0000 | $10,800.00 | $6,380.0000 | $12,760.00 |
| 0706 1 3 | RAISED PAVEMENT MARKER, TYPE B | 116 | EA | $5.7000 | $661.20 | $5.4000 | $626.40 | $5.5000 | $638.00 |
| 0710 11101 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID, 6" | 0.032 | GM | $1,730.0000 | $55.36 | $1,500.0000 | $48.00 | $1,650.0000 | $52.80 |
| 0710 11125 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, SOLID FOR STOP LINE OR CROSSWALK, 24" | 10 | LF | $11.5000 | $115.00 | $11.0000 | $110.00 | $11.0000 | $110.00 |
| 0710 11141 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 DOTTED EXTENSION, 6" | 0.028 | GM | $1,730.0000 | $48.44 | $1,200.0000 | $33.60 | $1,650.0000 | $46.20 |
| 0710 11170 | PAINTED PAVEMENT MARKINGS, STANDARD, WHITE, ARROWS | 3 | EA | $75.0000 | $225.00 | $70.0000 | $210.00 | $71.5000 | $214.50 |
| 0710 12290 | PAINTED PAVEMENT MARKINGS, DURABLE PAINT, YELLOW, ISLAND NOSE | 98 | SF | $11.5000 | $1,127.00 | $11.0000 | $1,078.00 | $11.0000 | $1,078.00 |
| 0710 90 | PAINTED PAVEMENT MARKINGS, FINAL SURFACE | 1 | LS | $5,517.0000 | $5,517.00 | $5,200.0000 | $5,200.00 | $5,240.0000 | $5,240.00 |
| 0711 11123 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 12" FOR CROSSWALK AND ROUNDABOUT | 315 | LF | $6.0000 | $1,890.00 | $6.5000 | $2,047.50 | $6.6000 | $2,079.00 |
| 0711 11124 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 18" FOR DIAGONALS AND CHEVRONS | 78 | LF | $9.0000 | $702.00 | $8.6500 | $674.70 | $8.8000 | $686.40 |
| 0711 11125 | THERMOPLASTIC, STANDARD, WHITE, SOLID, 24" FOR STOP LINE AND CROSSWALK | 141 | LF | $13.0000 | $1,833.00 | $13.0000 | $1,833.00 | $13.2000 | $1,861.20 |
| 0711 11141 | THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" | 0.096 | GM | $4,600.0000 | $441.60 | $4,100.0000 | $393.60 | $4,400.0000 | $422.40 |
| 0711 11241 | THERMOPLASTIC, STANDARD, YELLOW, 2-4 DOTTED GUIDE LINE /6-10 DOTTED EXTENSION LINE, 6" | 0.024 | GM | $4,600.0000 | $110.40 | $3,600.0000 | $86.40 | $4,400.0000 | $105.60 |
| 0711 14125 | THERMOPLASTIC, PREFORMED, WHITE, SOLID, 24" FOR CROSSWALK | 188 | LF | $17.0000 | $3,196.00 | $16.0000 | $3,008.00 | $16.5000 | $3,102.00 |
| 0711 14160 | THERMOPLASTIC, PREFORMED, WHITE, MESSAGE | 4 | EA | $170.0000 | $680.00 | $160.0000 | $640.00 | $165.0000 | $660.00 |
| 0711 14170 | THERMOPLASTIC, PREFORMED, WHITE, ARROW | 19 | EA | $170.0000 | $3,230.00 | $160.0000 | $3,040.00 | $165.0000 | $3,135.00 |
| 0711 16101 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" | 0.493 | GM | $5,200.0000 | $2,563.60 | $4,800.0000 | $2,366.40 | $4,950.0000 | $2,440.35 |
| 0711 16131 | THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SKIP, 6",10-30 SKIP OR 3-9 LANE DROP | 0.01 | GM | $4,600.0000 | $46.00 | $4,300.0000 | $43.00 | $4,400.0000 | $44.00 |
| 0711 16201 | THERMOPLASTIC, STANDARD-OTHER SURFACES, YELLOW, SOLID, 6" | 0.173 | GM | $5,200.0000 | $899.60 | $4,800.0000 | $830.40 | $4,950.0000 | $856.35 |
| 0999 25 | INITIAL CONTINGENCY AMOUNT, DO NOT BID | 1 | LS | $50,000.0000 | $50,000.00 | $50,000.0000 | $50,000.00 | $50,000.0000 | $50,000.00 |
Source: public Florida DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.