FL
Florida DOT · Bid Tabulation
Contract T3997
SR 10 (US 90 / W TENNESSEE ST) FROM CALLARK ST TO W BREVARD
- County
- LEON
- Letting
- April 29, 2026
- Bidders
- 4
Apparent low bid
INGRAM SIGNALIZATION, INC.
$964,114.20
Other bidders
ROBERTS AND ROBERTS, INC.
$1,065,505.99
TRAFFIC CONTROL DEVICES, LLC
$1,145,145.00
BLACKTIP SERVICES INCORPORATED
$1,688,758.56
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | INGRAM SIGNALIZATION, INC. $964,114.20 | ROBERTS AND ROBERTS, INC. $1,065,505.99 | TRAFFIC CONTROL DEVICES, LLC $1,145,145.00 | BLACKTIP SERVICES INCORPORATED $1,688,758.56 | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 0101 1 | MOBILIZATION | 1 | LS | $50,000.0000 | $50,000.00 | $60,000.0000 | $60,000.00 | $110,000.0000 | $110,000.00 | $120,000.0000 | $120,000.00 |
| 0102 1 | MAINTENANCE OF TRAFFIC | 140 | DA (LS) | $45,000.0000 | $45,000.00 | $135,000.0000 | $135,000.00 | $120,000.0000 | $120,000.00 | $100,000.0000 | $100,000.00 |
| 0102 14 | TRAFFIC CONTROL OFFICER | 356 | HR | $40.0000 | $14,240.00 | $85.0000 | $30,260.00 | $140.0000 | $49,840.00 | $85.0000 | $30,260.00 |
| 0102 60 | WORK ZONE SIGN | 4,348 | ED | $0.5000 | $2,174.00 | $0.4500 | $1,956.60 | $0.3000 | $1,304.40 | $0.4400 | $1,913.12 |
| 0102 74 1 | CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD | 7,160 | ED | $0.2000 | $1,432.00 | $0.1500 | $1,074.00 | $0.1500 | $1,074.00 | $0.1500 | $1,074.00 |
| 0102 74 8 | CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE) | 2,976 | FD | $0.2000 | $595.20 | $0.1500 | $446.40 | $0.1000 | $297.60 | $0.1000 | $297.60 |
| 0102 76 | ARROW BOARD / ADVANCE WARNING ARROW PANEL | 145 | ED | $10.0000 | $1,450.00 | $6.5000 | $942.50 | $7.0000 | $1,015.00 | $6.0000 | $870.00 |
| 0102 99 | PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY | 616 | ED | $20.0000 | $12,320.00 | $15.0000 | $9,240.00 | $14.0000 | $8,624.00 | $12.0000 | $7,392.00 |
| 0102104 | TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION | 140 | ED | $10.0000 | $1,400.00 | $13.0000 | $1,820.00 | $673.0000 | $94,220.00 | $28.0000 | $3,920.00 |
| 0102107 1 | TEMPORARY TRAFFIC DETECTION AND MAINTENANCE, INTERSECTION | 140 | ED | $10.0000 | $1,400.00 | $13.0000 | $1,820.00 | $1.0000 | $140.00 | $28.0000 | $3,920.00 |
| 0102115 | TYPE III BARRICADE | 200 | ED | $1.0000 | $200.00 | $1.0000 | $200.00 | $0.3500 | $70.00 | $0.3500 | $70.00 |
| 0104 10 3 | SEDIMENT BARRIER | 58 | LF | $20.0000 | $1,160.00 | $35.0000 | $2,030.00 | $12.0000 | $696.00 | $10.0000 | $580.00 |
| 0104 18 | INLET PROTECTION SYSTEM | 3 | EA | $500.0000 | $1,500.00 | $500.0000 | $1,500.00 | $316.0000 | $948.00 | $50.0000 | $150.00 |
| 0107 1 | LITTER REMOVAL | 4.39 | AC | $100.0000 | $439.00 | $1,325.0000 | $5,816.75 | $350.0000 | $1,536.50 | $100.0000 | $439.00 |
| 0107 2 | MOWING | 0.88 | AC | $200.0000 | $176.00 | $6,600.0000 | $5,808.00 | $420.0000 | $369.60 | $100.0000 | $88.00 |
| 0108 1 | MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING | 1 | LS | $10,000.0000 | $10,000.00 | $8,000.0000 | $8,000.00 | $3,500.0000 | $3,500.00 | $2,750.0000 | $2,750.00 |
| 0108 2 | MONITOR EXISTING STRUCTURES- VIBRATION MONITORING | 1 | LS | $9,000.0000 | $9,000.00 | $8,000.0000 | $8,000.00 | $3,500.0000 | $3,500.00 | $2,750.0000 | $2,750.00 |
| 0110 1 1 | CLEARING & GRUBBING | 0.01 | AC (LS) | $12,000.0000 | $12,000.00 | $20,500.0000 | $20,500.00 | $20,000.0000 | $20,000.00 | $483,000.0000 | $483,000.00 |
| 0110 4 10 | REMOVAL OF EXISTING CONCRETE | 71 | SY | $482.0000 | $34,222.00 | $275.0000 | $19,525.00 | $160.0000 | $11,360.00 | $100.0000 | $7,100.00 |
| 0520 1 10 | CONCRETE CURB & GUTTER, TYPE F | 34 | LF | $343.0000 | $11,662.00 | $225.0000 | $7,650.00 | $170.0000 | $5,780.00 | $100.0000 | $3,400.00 |
| 0522 2 | CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK | 57 | SY | $787.0000 | $44,859.00 | $350.0000 | $19,950.00 | $190.0000 | $10,830.00 | $100.0000 | $5,700.00 |
| 0527 2 | DETECTABLE WARNINGS | 34 | SF | $140.0000 | $4,760.00 | $150.0000 | $5,100.00 | $180.0000 | $6,120.00 | $40.0000 | $1,360.00 |
| 0570 1 2 | PERFORMANCE TURF, SOD | 53 | SY | $100.0000 | $5,300.00 | $85.0000 | $4,505.00 | $40.0000 | $2,120.00 | $50.0000 | $2,650.00 |
| 0611 2 1 | ITSFM LOCATION DOCUMENTATION- INTERSECTION | 1 | EA | $4,000.0000 | $4,000.00 | $3,855.8900 | $3,855.89 | $1,935.0000 | $1,935.00 | $4,262.0000 | $4,262.00 |
| 0630 2 11 | CONDUIT, FURNISH & INSTALL, OPEN TRENCH | 78 | LF | $12.0000 | $936.00 | $20.7000 | $1,614.60 | $40.0000 | $3,120.00 | $7.5600 | $589.68 |
| 0630 2 12 | CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE | 261 | LF | $32.0000 | $8,352.00 | $61.3500 | $16,012.35 | $40.0000 | $10,440.00 | $50.8800 | $13,279.68 |
| 0630 2 14 | CONDUIT, FURNISH & INSTALL, ABOVEGROUND | 14 | LF | $25.0000 | $350.00 | $47.5500 | $665.70 | $48.5000 | $679.00 | $9.6300 | $134.82 |
| 0632 7 1 | SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL | 1 | PI | $10,000.0000 | $10,000.00 | $12,282.0000 | $12,282.00 | $19,910.0000 | $19,910.00 | $22,000.0000 | $22,000.00 |
| 0632 7 6 | SIGNAL CABLE, REMOVE- INTERSECTION | 1 | PI | $1,000.0000 | $1,000.00 | $770.5000 | $770.50 | $1,770.0000 | $1,770.00 | $3,300.0000 | $3,300.00 |
| 0633 6 | FIBER OPTIC CABLE LOCATOR | 140 | DA | $150.0000 | $21,000.00 | $255.5500 | $35,777.00 | $225.0000 | $31,500.00 | $275.0000 | $38,500.00 |
| 0635 2 14 | PULL & SPLICE BOX, F&I, 17" X 30" COVER SIZE | 3 | EA | $1,555.0000 | $4,665.00 | $2,150.5000 | $6,451.50 | $2,085.0000 | $6,255.00 | $1,927.7500 | $5,783.25 |
| 0639 1122 | ELECTRICAL POWER SERVICE, F&I, UNDERGROUND, METER PURCHASED BY CONTRACTOR | 1 | AS | $4,200.0000 | $4,200.00 | $4,295.2500 | $4,295.25 | $7,620.0000 | $7,620.00 | $4,056.2500 | $4,056.25 |
| 0639 1610 | ELECTRICAL POWER SERVICE, REMOVE OVERHEAD | 1 | AS | $300.0000 | $300.00 | $764.7500 | $764.75 | $1,520.1800 | $1,520.18 | $2,750.0000 | $2,750.00 |
| 0639 2 1 | ELECTRICAL SERVICE WIRE, FURNISH & INSTALL | 124 | LF | $6.0000 | $744.00 | $10.8100 | $1,340.44 | $8.9000 | $1,103.60 | $9.6300 | $1,194.12 |
| 0639 2 6 | ELECTRICAL SERVICE WIRE, REMOVE | 14 | LF | $2.0000 | $28.00 | $0.3800 | $5.32 | $3.5000 | $49.00 | $4.1300 | $57.82 |
| 0639 3 11 | ELECTRICAL SERVICE DISCONNECT, F&I, POLE MOUNT | 1 | EA | $1,250.0000 | $1,250.00 | $920.0000 | $920.00 | $2,805.0000 | $2,805.00 | $3,231.2500 | $3,231.25 |
| 0639 3 60 | ELECTRICAL SERVICE DISCONNECT, REMOVE- POLE OR CABINET TO REMAIN | 1 | EA | $300.0000 | $300.00 | $115.0000 | $115.00 | $350.0000 | $350.00 | $1,650.0000 | $1,650.00 |
| 0641 2 12 | PRESTRESSED CONCRETE POLE, F&I, TYPE P-II SERVICE POLE | 1 | EA | $2,000.0000 | $2,000.00 | $2,300.0000 | $2,300.00 | $2,700.0000 | $2,700.00 | $2,681.2500 | $2,681.25 |
| 0646 1 11 | ALUMINUM SIGNALS POLE, PEDESTAL | 2 | EA | $3,800.0000 | $7,600.00 | $3,450.0000 | $6,900.00 | $3,122.0000 | $6,244.00 | $2,461.2500 | $4,922.50 |
| 0646 1 40 | ALUMINUM SIGNALS POLE, RELOCATE | 1 | EA | $2,000.0000 | $2,000.00 | $1,759.5000 | $1,759.50 | $2,320.0000 | $2,320.00 | $1,650.0000 | $1,650.00 |
| 0646 1 60 | ALUMINUM SIGNALS POLE, REMOVE | 3 | EA | $500.0000 | $1,500.00 | $307.6300 | $922.89 | $354.0000 | $1,062.00 | $1,100.0000 | $3,300.00 |
| 0649 21 14 | STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 60'-60' | 1 | EA | $125,000.0000 | $125,000.00 | $137,019.0500 | $137,019.05 | $111,100.0000 | $111,100.00 | $163,620.0000 | $163,620.00 |
| 0649 21 25 | STEEL MAST ARM ASSEMBLY, FURNISH AND INSTALL, DOUBLE ARM 78'-60' | 1 | EA | $141,000.0000 | $141,000.00 | $148,919.2500 | $148,919.25 | $133,225.0000 | $133,225.00 | $186,898.7500 | $186,898.75 |
| 0649 26 3 | STEEL MAST ARM ASSEMBLY, REMOVE, SHALLOW FOUNDATION- BOLT ON ATTACHMENT | 2 | EA | $8,000.0000 | $16,000.00 | $7,475.0000 | $14,950.00 | $15,250.0000 | $30,500.00 | $27,500.0000 | $55,000.00 |
| 0650 1 14 | VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 3 SECTION, 1 WAY | 12 | AS | $2,000.0000 | $24,000.00 | $2,300.0000 | $27,600.00 | $1,840.0000 | $22,080.00 | $3,480.1300 | $41,761.56 |
| 0650 1 16 | VEHICULAR TRAFFIC SIGNAL, FURNISH & INSTALL ALUMINUM, 4 SECTION, 1 WAY | 3 | AS | $2,500.0000 | $7,500.00 | $2,760.0000 | $8,280.00 | $2,375.0000 | $7,125.00 | $3,356.3800 | $10,069.14 |
| 0653 1 11 | PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 1 WAY | 1 | AS | $1,200.0000 | $1,200.00 | $1,380.0000 | $1,380.00 | $1,030.0000 | $1,030.00 | $1,043.6300 | $1,043.63 |
| 0653 1 12 | PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 2 WAYS | 2 | AS | $2,500.0000 | $5,000.00 | $2,645.0000 | $5,290.00 | $2,165.0000 | $4,330.00 | $1,962.1300 | $3,924.26 |
| 0660 1110 | LOOP DETECTOR INDUCTIVE, F&I, TYPE 10 | 24 | EA | $550.0000 | $13,200.00 | $517.5000 | $12,420.00 | $500.0000 | $12,000.00 | $891.0000 | $21,384.00 |
| 0660 4 11 | VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL CABINET EQUIPMENT | 1 | EA | $40,000.0000 | $40,000.00 | $39,870.5000 | $39,870.50 | $36,720.0000 | $36,720.00 | $31,332.1300 | $31,332.13 |
| 0660 4 12 | VEHICLE DETECTION SYSTEM- VIDEO, FURNISH & INSTALL ABOVE GROUND EQUIPMENT | 4 | EA | $14,000.0000 | $56,000.00 | $9,775.0000 | $39,100.00 | $9,926.0000 | $39,704.00 | $11,412.5000 | $45,650.00 |
| 0663 1400 | SIGNAL PRIORITY & PREEMPTION SYSTEM, RELOCATE | 1 | EA | $3,500.0000 | $3,500.00 | $1,380.0000 | $1,380.00 | $1,980.0000 | $1,980.00 | $3,300.0000 | $3,300.00 |
| 0665 1 40 | PEDESTRIAN DETECTOR, RELOCATE | 3 | EA | $800.0000 | $2,400.00 | $310.5000 | $931.50 | $238.0000 | $714.00 | $1,375.0000 | $4,125.00 |
| 0670 5600 | TRAFFIC CONTROLLER ASSEMBLY, REMOVE CONTROLLER WITH CABINET | 1 | AS | $500.0000 | $500.00 | $977.5000 | $977.50 | $2,445.0000 | $2,445.00 | $2,200.0000 | $2,200.00 |
| 0671 2 17 | TRAFFIC CONTROLLER WITHOUT CABINET, ATC, F&I IN EXISTING ATC CABINET | 1 | EA | $13,000.0000 | $13,000.00 | $8,625.0000 | $8,625.00 | $12,780.0000 | $12,780.00 | $55,000.0000 | $55,000.00 |
| 0682 1400 | ITS CCTV CAMERA, RELOCATE | 1 | EA | $1,200.0000 | $1,200.00 | $2,875.0000 | $2,875.00 | $4,825.0000 | $4,825.00 | $2,750.0000 | $2,750.00 |
| 0700 1913 | SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I CANTILEVER GROUND MOUNT, 20.1-30.0 SF | 1 | EA | $7,650.0000 | $7,650.00 | $5,310.0000 | $5,310.00 | $6,385.0000 | $6,385.00 | $4,000.0000 | $4,000.00 |
| 0700 2113 | MULTI-COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, 20.1- 30.0 SF | 1 | EA | $7,650.0000 | $7,650.00 | $5,310.0000 | $5,310.00 | $10,080.0000 | $10,080.00 | $13,200.0000 | $13,200.00 |
| 0700 3201 | SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, UP TO 12 SF | 5 | EA | $1,200.0000 | $6,000.00 | $977.5000 | $4,887.50 | $990.0000 | $4,950.00 | $1,925.0000 | $9,625.00 |
| 0700 3202 | SIGN PANEL, FURNISH & INSTALL OVERHEAD MOUNT, 12-20 SF | 1 | EA | $1,800.0000 | $1,800.00 | $1,408.7500 | $1,408.75 | $1,563.0000 | $1,563.00 | $1,993.7500 | $1,993.75 |
| 0700 5 22 | INTERNALLY ILLUMINATED SIGN, FURNISH & INSTALL, OVERHEAD MOUNT, 12-18 SF | 4 | EA | $4,500.0000 | $18,000.00 | $5,980.0000 | $23,920.00 | $4,285.0000 | $17,140.00 | $5,087.5000 | $20,350.00 |
| 0700141360 | ENHANCED HIGHWAY SIGN ASSEMBLY, AC POWERED, F&I OVERHEAD MOUNT, BLANK OUT SIGN <12 SF | 2 | EA | $12,000.0000 | $24,000.00 | $8,050.0000 | $16,100.00 | $10,250.0000 | $20,500.00 | $4,500.0000 | $9,000.00 |
| 0711 11141 | THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" | 0.008 | GM | $25,000.0000 | $200.00 | $300,000.0000 | $2,400.00 | $69,890.0000 | $559.12 | $250,000.0000 | $2,000.00 |
| 0711 17 1 | THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN | 13 | SF | $100.0000 | $1,300.00 | $195.0000 | $2,535.00 | $14.0000 | $182.00 | $385.0000 | $5,005.00 |
| 0715 5 32 | LUMINAIRE & BRACKET ARM- GALV STEEL, FURNISH & INSTALL NEW LUMINAIRE AND ARM ON NEW/EXISTING POLE | 1 | EA | $5,000.0000 | $5,000.00 | $4,370.0000 | $4,370.00 | $2,500.0000 | $2,500.00 | $7,000.0000 | $7,000.00 |
| 0923676205 | ATC CABINET WITHOUT CONTROLLER, F&I, NEMA, SIZE 7, 44"-49" W x 24"-27" D | 1 | EA | $57,500.0000 | $57,500.00 | $51,750.0000 | $51,750.00 | $56,000.0000 | $56,000.00 | $45,500.0000 | $45,500.00 |
| 0999 25 | INITIAL CONTINGENCY AMOUNT, DO NOT BID | 1 | LS | $50,000.0000 | $50,000.00 | $50,000.0000 | $50,000.00 | $50,000.0000 | $50,000.00 | $50,000.0000 | $50,000.00 |
Source: public Florida DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.