FL Florida DOT · Bid Tabulation

Contract T4723

SR 5 (US 1) FROM PALMETTO PARK RD TO SR 850 (NORTHLAKE BLVD)

County
PALM BEACH
Letting
April 29, 2026
Bidders
4
Apparent low bid WEEKLEY ASPHALT PAVING, INC. $2,272,505.10
Other bidders THE STOUT GROUP LLC $2,487,436.91 WEST CONSTRUCTION, INC. $2,726,069.30 FLORIDA ENGINEERING & DEVELOPMENT CORP $2,737,515.42

Bid Items - unit price and extension by bidder

Item Description Qty UOM WEEKLEY ASPHALT PAVING, INC. $2,272,505.10 THE STOUT GROUP LLC $2,487,436.91 WEST CONSTRUCTION, INC. $2,726,069.30 FLORIDA ENGINEERING & DEVELOPMENT CORP $2,737,515.42
Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
0101 1 MOBILIZATION 1 LS $132,000.0000 $132,000.00 $240,000.0000 $240,000.00 $325,000.0000 $325,000.00 $209,622.5200 $209,622.52
0102 1 MAINTENANCE OF TRAFFIC 250 DA (LS) $297,400.0000 $297,400.00 $225,000.0000 $225,000.00 $150,000.0000 $150,000.00 $58,960.5900 $58,960.59
0102 14 TRAFFIC CONTROL OFFICER 208 HR $90.0000 $18,720.00 $105.0000 $21,840.00 $45.0000 $9,360.00 $68.0600 $14,156.48
0102 4 1 PEDESTRIAN OR BICYCLE SPECIAL DETOUR 78 SY (LS) $63,110.0000 $63,110.00 $23,000.0000 $23,000.00 $70,000.0000 $70,000.00 $19,643.8100 $19,643.81
0102 5 PEDESTRIAN ESCORT/FLAGGER 1,560 HR $59.0000 $92,040.00 $63.0000 $98,280.00 $35.0000 $54,600.00 $24.2500 $37,830.00
0102 60 WORK ZONE SIGN 8,060 ED $0.2300 $1,853.80 $0.2600 $2,095.60 $0.2400 $1,934.40 $0.2000 $1,612.00
0102 74 1 CHANNELIZING DEVICE- TYPES I, II, DI, VP, DRUM, OR LCD 31,850 ED $0.2000 $6,370.00 $0.1400 $4,459.00 $0.1500 $4,777.50 $0.1000 $3,185.00
0102 74 8 CHANNELIZING DEVICE- PEDESTRIAN LCD (LONGITUDINAL CHANNELIZING DEVICE) 7,980 FD $0.2000 $1,596.00 $0.1200 $957.60 $0.1500 $1,197.00 $0.0800 $638.40
0102 76 ARROW BOARD / ADVANCE WARNING ARROW PANEL 560 ED $7.0000 $3,920.00 $7.0000 $3,920.00 $5.6000 $3,136.00 $5.0900 $2,850.40
0102 99 PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY 3,887 ED $12.0000 $46,644.00 $10.0000 $38,870.00 $15.0000 $58,305.00 $6.7800 $26,353.86
0102104 TEMPORARY SIGNALIZATION AND MAINTENANCE, INTERSECTION 160 ED $17.0000 $2,720.00 $10.0000 $1,600.00 $20.0000 $3,200.00 $6.2000 $992.00
0102112 EXISTING ITS MAINTENANCE 250 DA $139.0000 $34,750.00 $10.0000 $2,500.00 $210.0000 $52,500.00 $132.9100 $33,227.50
0102115 TYPE III BARRICADE 260 ED $1.5000 $390.00 $0.6900 $179.40 $0.5000 $130.00 $0.5100 $132.60
0102913 29 REMOVABLE TAPE, WHITE, MESSAGE, SYMBOL OR ARROW 1 EA $697.0000 $697.00 $700.0000 $700.00 $350.0000 $350.00 $591.1100 $591.11
0104 10 3 SEDIMENT BARRIER 1,578 LF $4.5000 $7,101.00 $4.0000 $6,312.00 $5.0000 $7,890.00 $3.0400 $4,797.12
0104 18 INLET PROTECTION SYSTEM 10 EA $250.0000 $2,500.00 $175.0000 $1,750.00 $215.0000 $2,150.00 $132.3000 $1,323.00
0107 1 LITTER REMOVAL 6.02 AC $200.0000 $1,204.00 $1.0000 $6.02 $85.0000 $511.70 $0.5000 $3.01
0107 2 MOWING 1.98 AC $200.0000 $396.00 $1.0000 $1.98 $85.0000 $168.30 $1.8300 $3.62
0108 1 MONITOR EXISTING STRUCTURES- INSPECTION AND SETTLEMENT MONITORING 1 LS $12,600.0000 $12,600.00 $6,500.0000 $6,500.00 $20,000.0000 $20,000.00 $5,851.7000 $5,851.70
0110 1 1 CLEARING & GRUBBING 0.28 AC (LS) $91,000.0000 $91,000.00 $200,000.0000 $200,000.00 $100,000.0000 $100,000.00 $35,044.5100 $35,044.51
0110 2 2 SELECTIVE CLEARING AND GRUBBING, AREAS WITH TREES TO REMAIN 0.01 AC $50,000.0000 $500.00 $1.0000 $0.01 $100,000.0000 $1,000.00 $366,978.0000 $3,669.78
0110 21 TREE PROTECTION BARRIER 33 LF $18.0000 $594.00 $18.0000 $594.00 $6.0000 $198.00 $15.6900 $517.77
0110 4 10 REMOVAL OF EXISTING CONCRETE 1,100 SY $69.0000 $75,900.00 $35.0000 $38,500.00 $45.0000 $49,500.00 $44.7800 $49,258.00
0120 2 2 BORROW EXCAVATION, TRUCK MEASURE 517 CY $70.0000 $36,190.00 $65.0000 $33,605.00 $75.0000 $38,775.00 $85.8000 $44,358.60
0120 71 REGULAR EXCAVATION (3-R PROJECTS ONLY) 1 LS $63,200.0000 $63,200.00 $30,000.0000 $30,000.00 $20,000.0000 $20,000.00 $33,612.8800 $33,612.88
0425 1315 INLETS, CURB TYPE P-1, PARTIAL 1 EA $7,000.0000 $7,000.00 $11,000.0000 $11,000.00 $6,720.0000 $6,720.00 $4,754.8600 $4,754.86
0425 1521 INLETS, DT BOT, TYPE C,<10' 1 EA $12,000.0000 $12,000.00 $18,000.0000 $18,000.00 $7,850.0000 $7,850.00 $6,281.9700 $6,281.97
0425 2 63 MANHOLES, P-8, PARTIAL 1 EA $8,000.0000 $8,000.00 $10,000.0000 $10,000.00 $7,000.0000 $7,000.00 $3,857.0700 $3,857.07
0425 5 MANHOLE, ADJUST 2 EA $1,200.0000 $2,400.00 $1,500.0000 $3,000.00 $1,000.0000 $2,000.00 $1,496.9200 $2,993.84
0425 6 VALVE BOXES, ADJUST 3 EA $850.0000 $2,550.00 $950.0000 $2,850.00 $1,000.0000 $3,000.00 $897.2000 $2,691.60
0430175118 PIPE CULVERT,OPTIONAL MATERIAL,ROUND, 18"S/CD 41 LF $550.0000 $22,550.00 $300.0000 $12,300.00 $200.0000 $8,200.00 $178.3000 $7,310.30
0520 1 10 CONCRETE CURB & GUTTER, TYPE F 1,490 LF $63.5300 $94,659.70 $75.0000 $111,750.00 $65.0000 $96,850.00 $73.7000 $109,813.00
0520 1 12 CONCRETE CURB & GUTTER, TYPE F WITH SPECIAL GUTTER PROFILE 14 LF $70.0000 $980.00 $75.0000 $1,050.00 $70.0000 $980.00 $82.2100 $1,150.94
0522 1 CONCRETE SIDEWALK AND DRIVEWAYS, 4" THICK 606 SY $65.0000 $39,390.00 $140.0000 $84,840.00 $95.0000 $57,570.00 $48.4500 $29,360.70
0522 2 CONCRETE SIDEWALK AND DRIVEWAYS, 6" THICK 119 SY $75.0000 $8,925.00 $175.0000 $20,825.00 $110.0000 $13,090.00 $72.5900 $8,638.21
0522 4 1 BUS SHELTER PAD, FIBER REINFORCED CONCRETE 1,040 SY $157.0000 $163,280.00 $300.0000 $312,000.00 $160.0000 $166,400.00 $204.8400 $213,033.60
0527 2 DETECTABLE WARNINGS 1,681 SF $48.0000 $80,688.00 $45.0000 $75,645.00 $35.0000 $58,835.00 $28.4800 $47,874.88
0570 1 2 PERFORMANCE TURF, SOD 419 SY $25.0000 $10,475.00 $40.0000 $16,760.00 $5.6000 $2,346.40 $7.5400 $3,159.26
0580 1 1 LANDSCAPE COMPLETE- SMALL PLANTS 1 LS $33,000.0000 $33,000.00 $40,000.0000 $40,000.00 $226,000.0000 $226,000.00 $59,301.5200 $59,301.52
0630 2 11 CONDUIT, FURNISH & INSTALL, OPEN TRENCH 93 LF $37.5000 $2,880.00 $41.0000 $3,813.00 $20.0000 $1,860.00 $22.8550 $1,500.60
0630 2 12 CONDUIT, FURNISH & INSTALL, DIRECTIONAL BORE 829 LF $45.0000 $37,305.00 $41.0000 $33,989.00 $50.0000 $41,450.00 $31.7350 $26,728.88
0632 7 1 SIGNAL CABLE- NEW OR RECONSTRUCTED INTERSECTION, FURNISH & INSTALL 4 PI $12,000.0000 $48,000.00 $14,000.0000 $56,000.00 $15,000.0000 $60,000.00 $6,807.7900 $27,231.16
0633 6 FIBER OPTIC CABLE LOCATOR 250 DA $170.0000 $42,500.00 $25.0000 $6,250.00 $315.0000 $78,750.00 $141.7700 $35,442.50
0635 2 11 PULL & SPLICE BOX, F&I, 13" x 24" COVER SIZE 4 EA $2,300.0000 $9,200.00 $2,100.0000 $8,400.00 $1,500.0000 $6,000.00 $1,267.4700 $5,069.88
0635 2 14 PULL & SPLICE BOX, F&I, 17" X 30" COVER SIZE 18 EA $1,670.0000 $30,060.00 $1,600.0000 $28,800.00 $2,000.0000 $36,000.00 $1,453.6700 $26,166.06
0646 1 11 ALUMINUM SIGNALS POLE, PEDESTAL 3 EA $2,000.0000 $6,000.00 $1,700.0000 $5,100.00 $2,750.0000 $8,250.00 $1,984.6800 $5,954.04
0646 1 60 ALUMINUM SIGNALS POLE, REMOVE 2 EA $300.0000 $600.00 $80.0000 $160.00 $500.0000 $1,000.00 $443.0300 $886.06
0653 1 11 PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 1 WAY 2 AS $1,400.0000 $2,800.00 $1,900.0000 $3,800.00 $1,250.0000 $2,500.00 $898.1400 $1,796.28
0653 1 12 PEDESTRIAN SIGNAL, FURNISH & INSTALL LED COUNTDOWN, 2 WAYS 1 AS $1,700.0000 $1,700.00 $2,600.0000 $2,600.00 $2,500.0000 $2,500.00 $1,683.6300 $1,683.63
0660 1104 LOOP DETECTOR, INDUCTIVE, F&I, TYPE 4, 2CHANNEL, SOLID STATE, SHELF MOUNTED, TIME DELAY 2 EA $350.0000 $700.00 $3,600.0000 $7,200.00 $750.0000 $1,500.00 $305.8500 $611.70
0660 2102 LOOP ASSEMBLY, F&I, TYPE B 2 AS $3,400.0000 $6,800.00 $1,200.0000 $2,400.00 $3,500.0000 $7,000.00 $1,421.8800 $2,843.76
0660 2106 LOOP ASSEMBLY, F&I, TYPE F 2 AS $3,400.0000 $6,800.00 $1,900.0000 $3,800.00 $3,000.0000 $6,000.00 $1,656.4900 $3,312.98
0665 1 11 PEDESTRIAN DETECTOR, FURNISH & INSTALL, STANDARD 4 EA $700.0000 $2,800.00 $500.0000 $2,000.00 $750.0000 $3,000.00 $382.0400 $1,528.16
0671 2 40 TRAFFIC CONTROLLER, MODIFY 3 EA $4,000.0000 $12,000.00 $2,700.0000 $8,100.00 $6,000.0000 $18,000.00 $1,550.8400 $4,652.52
0700 1111 SINGLE COLUMN GROUND SIGN ASSEMBLY, F&I GROUND MOUNT, LESS THAN 12 SF 5 EA $695.0000 $3,475.00 $900.0000 $4,500.00 $650.0000 $3,250.00 $589.4100 $2,947.05
0700 1500 SINGLE COLUMN GROUND SIGN ASSEMBLY, RELOCATE 17 EA $625.0000 $10,625.00 $600.0000 $10,200.00 $500.0000 $8,500.00 $530.0500 $9,010.85
0705 10 2 OBJECT MARKER, TYPE 2 1 EA $450.0000 $450.00 $800.0000 $800.00 $175.0000 $175.00 $381.6300 $381.63
0706 1 3 RAISED PAVEMENT MARKER, TYPE B 12 EA $5.0000 $60.00 $12.0000 $144.00 $6.0000 $72.00 $4.2400 $50.88
0710 90 PAINTED PAVEMENT MARKINGS, FINAL SURFACE 1 LS $2,800.0000 $2,800.00 $6,000.0000 $6,000.00 $10,000.0000 $10,000.00 $1,102.4900 $1,102.49
0711 11141 THERMOPLASTIC, STANDARD, WHITE, 2-4 DOTTED GUIDELINE/ 6-10 GAP EXTENSION, 6" 0.062 GM $3,000.0000 $186.00 $3,700.0000 $229.40 $3,000.0000 $186.00 $6,839.3500 $424.04
0711 11170 THERMOPLASTIC, STANDARD, WHITE, ARROW 2 EA $300.0000 $600.00 $100.0000 $200.00 $100.0000 $200.00 $101.7700 $203.54
0711 14160 THERMOPLASTIC, PREFORMED, WHITE, MESSAGE 1 EA $290.0000 $290.00 $350.0000 $350.00 $55.0000 $55.00 $220.5000 $220.50
0711 14170 THERMOPLASTIC, PREFORMED, WHITE, ARROW 1 EA $170.0000 $170.00 $190.0000 $190.00 $55.0000 $55.00 $127.2100 $127.21
0711 16101 THERMOPLASTIC, STANDARD-OTHER SURFACES, WHITE, SOLID, 6" 0.063 GM $6,000.0000 $378.00 $6,300.0000 $396.90 $6,000.0000 $378.00 $6,730.7900 $424.04
0711 17 1 THERMOPLASTIC, REMOVE EXISTING THERMOPLASTIC PAVEMENT MARKINGS- SURFACE TO REMAIN 434 SF $10.0000 $4,340.00 $18.0000 $7,812.00 $3.2500 $1,410.50 $3.3900 $1,471.26
0714 10 GREEN-COLORED PAVEMENT MARKINGS, BIKE LANE 1,261 SF $15.0000 $18,915.00 $15.0000 $18,915.00 $9.0000 $11,349.00 $8.4800 $10,693.28
0715 1 12 LIGHTING CONDUCTORS, F&I, INSULATED, NO.8 - 6 2,754 LF $5.9000 $16,248.60 $7.0000 $19,278.00 $3.0000 $8,262.00 $2.9300 $8,069.22
0715 1 60 LIGHTING CONDUCTORS, REMOVE & DISPOSE, CONTRACTOR OWNS 302 LF $2.0000 $604.00 $2.0000 $604.00 $1.2500 $377.50 $0.3600 $108.72
0715 52 48 SPECIAL LIGHTING SYSTEM ASSEMBLY, SOLAR-POWERED LIGHT POLE FOR BUS SHELTER 13 EA $6,000.0000 $78,000.00 $15,000.0000 $195,000.00 $20,000.0000 $260,000.00 $14,732.8700 $191,527.31
0715500 1 POLE CABLE DISTRIBUTION SYSTEM, FURNISH AND INSTALL, CONVENTIONAL 2 EA $800.0000 $1,600.00 $800.0000 $1,600.00 $1,000.0000 $2,000.00 $793.4000 $1,586.80
0715540000 LIGHT POLE COMPLETE- SPECIAL DESIGN, RELOCATE 2 EA $9,000.0000 $18,000.00 $6,200.0000 $12,400.00 $6,500.0000 $13,000.00 $3,092.6900 $6,185.38
0751 35 12 ARCHITECTURAL, BUS SHELTER, F&I, 50-100 SF 13 EA $22,250.0000 $289,250.00 $18,000.0000 $234,000.00 $30,000.0000 $390,000.00 $72,250.0000 $939,250.00
0751 36 11 BICYCLE RACK, FURNISH & INSTALL, 1- 2 BICYCLES 39 EA $1,480.0000 $57,720.00 $500.0000 $19,500.00 $750.0000 $29,250.00 $3,750.0000 $146,250.00
0751 37 TRASH RECEPTACLE 26 EA $890.0000 $23,140.00 $1,000.0000 $26,000.00 $1,000.0000 $26,000.00 $4,900.0000 $127,400.00
0999 16 PARTNERING, DO NOT BID 1 LS $6,000.0000 $6,000.00 $6,000.0000 $6,000.00 $6,000.0000 $6,000.00 $6,000.0000 $6,000.00
0999 25 INITIAL CONTINGENCY AMOUNT, DO NOT BID 1 LS $50,000.0000 $50,000.00 $50,000.0000 $50,000.00 $50,000.0000 $50,000.00 $50,000.0000 $50,000.00
0999 26 LOCAL AGENCY INITIAL CONTINGENCY AMOUNT (DO NOT BID) 1 LS $215.0000 $215.00 $215.0000 $215.00 $215.0000 $215.00 $215.0000 $215.00

Source: public Florida DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.

Want the analysis, not just the numbers? DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel. Explore DOTestimate →