IL
Illinois DOT · Bid Tabulation
Contract 62L85
2020-107-RS&SW
- County
- COOK
- District
- 1
- Letting
- April 24, 2026
- Section
- 2020-107-RS&SW
- Bidders
- 2
Apparent low bid
K-FIVE CONSTRUCTION CORPORATION
$852,460.03
Other bidders
A LAMP CONCRETE CONTRACTORS, INC.
$1,038,972.08
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | K-FIVE CONSTRUCTION CORPORATION $852,460.03 | A LAMP CONCRETE CONTRACTORS, INC. $1,038,972.08 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| 20101350 | TREE PRUN OVER 10 | 4 | EACH | $350.0000 | $1,400.00 | $250.0000 | $1,000.00 |
| 20200100 | EARTH EXCAVATION | 30 | CU YD | $65.0000 | $1,950.00 | $96.0000 | $2,880.00 |
| 21101615 | TOPSOIL F & P 4 | 90 | SQ YD | $25.0000 | $2,250.00 | $18.5000 | $1,665.00 |
| 25200110 | SODDING SALT TOLERANT | 90 | SQ YD | $25.0000 | $2,250.00 | $26.0000 | $2,340.00 |
| 25200200 | SUPPLE WATERING | 2 | UNIT | $446.0000 | $892.00 | $250.0000 | $500.00 |
| 40600290 | BIT MATLS TACK CT | 5,172 | POUND | $0.0100 | $51.72 | $0.0100 | $51.72 |
| 40600370 | LONG JOINT SEALANT | 2,660 | FOOT | $6.2000 | $16,492.00 | $4.9000 | $13,034.00 |
| 40600400 | MIX CR JTS FLANGEWYS | 12 | TON | $1,050.0000 | $12,600.00 | $175.0000 | $2,100.00 |
| 40600982 | HMA SURF REM BUTT JT | 138 | SQ YD | $31.0000 | $4,278.00 | $30.1700 | $4,163.46 |
| 40601005 ★ | HMA REPL OVER PATCH | 128 | TON | $200.0000 | $25,600.00 | $144.0000 | $18,432.00 |
| 40603200 | P HMA BC IL-4.75 N50 | 317 | TON | $165.0000 | $52,305.00 | $153.0000 | $48,501.00 |
| 40604172 | P HMA SC IL-9.5 E N70 | 751 | TON | $130.0000 | $97,630.00 | $141.0000 | $105,891.00 |
| 40800050 | INCIDENTAL HMA SURF | 5 | TON | $65.0000 | $325.00 | $189.0000 | $945.00 |
| 42001300 | PROTECTIVE COAT | 587 | SQ YD | $1.0000 | $587.00 | $3.2500 | $1,907.75 |
| 42300200 | PCC DRIVEWAY PAVT 6 | 150 | SQ YD | $100.0000 | $15,000.00 | $140.0000 | $21,000.00 |
| 42300400 | PCC DRIVEWAY PAVT 8 | 75 | SQ YD | $112.0000 | $8,400.00 | $186.0000 | $13,950.00 |
| 42400200 | PC CONC SIDEWALK 5 | 2,521 | SQ FT | $10.0000 | $25,210.00 | $10.5000 | $26,470.50 |
| 42400800 | DETECTABLE WARNINGS | 281 | SQ FT | $30.0000 | $8,430.00 | $35.0000 | $9,835.00 |
| 44000159 | HMA SURF REM 2 1/2 | 7,661 | SQ YD | $4.0000 | $30,644.00 | $5.4700 | $41,905.67 |
| 44000200 | DRIVE PAVEMENT REM | 225 | SQ YD | $18.0000 | $4,050.00 | $20.5000 | $4,612.50 |
| 44000600 | SIDEWALK REM | 2,521 | SQ FT | $2.5000 | $6,302.50 | $1.5000 | $3,781.50 |
| 44002216 ★ | HMA RM OV PATCH 4 | 571 | SQ YD | $0.0100 | $5.71 | $12.7500 | $7,280.25 |
| 44201749 | CL D PATCH T1 9 | 50 | SQ YD | $100.0000 | $5,000.00 | $95.0000 | $4,750.00 |
| 44201753 | CL D PATCH T2 9 | 100 | SQ YD | $100.0000 | $10,000.00 | $80.0000 | $8,000.00 |
| 44201757 | CL D PATCH T3 9 | 150 | SQ YD | $100.0000 | $15,000.00 | $76.5000 | $11,475.00 |
| 44201759 | CL D PATCH T4 9 | 200 | SQ YD | $100.0000 | $20,000.00 | $59.0000 | $11,800.00 |
| 60250200 | CB ADJUST | 4 | EACH | $650.0000 | $2,600.00 | $650.0000 | $2,600.00 |
| 60252800 | CB RECONST | 2 | EACH | $1,650.0000 | $3,300.00 | $1,650.0000 | $3,300.00 |
| 60255500 | MAN ADJUST | 4 | EACH | $650.0000 | $2,600.00 | $650.0000 | $2,600.00 |
| 60266600 | VALVE BOX ADJ | 2 | EACH | $450.0000 | $900.00 | $450.0000 | $900.00 |
| 60406000 | FR & LIDS T1 OL | 1 | EACH | $465.0000 | $465.00 | $465.0000 | $465.00 |
| 66900200 | NON SPL WASTE DISPOSL | 50 | CU YD | $150.0000 | $7,500.00 | $90.0000 | $4,500.00 |
| 66900530 | SOIL DISPOSAL ANALY | 3 | EACH | $700.0000 | $2,100.00 | $700.0000 | $2,100.00 |
| 66901001 | REG SUB P-CONST PLAN | 1 | L SUM | $5,800.0000 | $5,800.00 | $5,800.0000 | $5,800.00 |
| 66901003 | REG SUB F CON REPORT | 1 | L SUM | $500.0000 | $500.00 | $500.0000 | $500.00 |
| 66901006 | REG SUB MON | 5 | CAL DA | $715.0000 | $3,575.00 | $715.0000 | $3,575.00 |
| 67100100 | MOBILIZATION | 1 | L SUM | $52,000.0000 | $52,000.00 | $60,850.0000 | $60,850.00 |
| 70102620 | TR CONT & PROT 701501 | 1 | L SUM | $60,751.3300 | $60,751.33 | $181,450.0000 | $181,450.00 |
| 70102622 | TR CONT & PROT 701502 | 1 | L SUM | $500.0000 | $500.00 | $1.0000 | $1.00 |
| 70102625 | TR CONT & PROT 701606 | 1 | L SUM | $500.0000 | $500.00 | $1.0000 | $1.00 |
| 70102635 | TR CONT & PROT 701701 | 1 | L SUM | $500.0000 | $500.00 | $1.0000 | $1.00 |
| 70102640 | TR CONT & PROT 701801 | 1 | L SUM | $250.0000 | $250.00 | $1.0000 | $1.00 |
| 70300100 | SHORT TERM PAVT MKING | 4,593 | FOOT | $1.0000 | $4,593.00 | $0.0100 | $45.93 |
| 70300150 | SHRT TRM PAVT MK REM | 3 | SQ FT | $500.0000 | $1,500.00 | $5.2500 | $15.75 |
| 70300211 | TMP PVT MK L&S PNT | 292 | SQ FT | $3.0000 | $876.00 | $0.0100 | $2.92 |
| 70300221 | TEMP PVT MK L 4 PNT | 6,900 | FOOT | $0.4000 | $2,760.00 | $0.0100 | $69.00 |
| 70300241 | TEMP PVT MK L 6 PNT | 296 | FOOT | $0.6000 | $177.60 | $0.0100 | $2.96 |
| 70300261 | TEMP PVT MK L 12 PNT | 7,054 | FOOT | $1.2000 | $8,464.80 | $0.0100 | $70.54 |
| 70300281 | TEMP PVT MK L 24 PNT | 360 | FOOT | $2.4000 | $864.00 | $0.0100 | $3.60 |
| 70307120 | TMP PVT MK L4 T4 TAPE | 1,149 | FOOT | $1.3500 | $1,551.15 | $0.0100 | $11.49 |
| 78000100 | THPL PVT MK LTR & SYM | 146 | SQ FT | $5.5000 | $803.00 | $6.5000 | $949.00 |
| 78000200 | THPL PVT MK LINE 4 | 3,450 | FOOT | $0.8000 | $2,760.00 | $1.0000 | $3,450.00 |
| 78000400 | THPL PVT MK LINE 6 | 148 | FOOT | $1.2000 | $177.60 | $1.5000 | $222.00 |
| 78000600 | THPL PVT MK LINE 12 | 3,527 | FOOT | $2.5000 | $8,817.50 | $3.0000 | $10,581.00 |
| 78000650 | THPL PVT MK LINE 24 | 180 | FOOT | $5.5000 | $990.00 | $6.5000 | $1,170.00 |
| 78100100 | RAISED REFL PAVT MKR | 85 | EACH | $61.5000 | $5,227.50 | $75.0000 | $6,375.00 |
| 78300200 | RAISED REF PVT MK REM | 85 | EACH | $60.3000 | $5,125.50 | $25.0000 | $2,125.00 |
| 78300202 | PVT MKG REM WTR BLAST | 10,514 | SQ FT | $0.9200 | $9,672.88 | $1.5000 | $15,771.00 |
| 81028200 | UNDRGRD C GALVS 2 | 152 | FOOT | $86.8400 | $13,199.68 | $58.0200 | $8,819.04 |
| 81028240 | UNDRGRD C GALVS 4 | 62 | FOOT | $111.5900 | $6,918.58 | $123.6900 | $7,668.78 |
| 81400100 | HANDHOLE | 1 | EACH | $3,014.1900 | $3,014.19 | $4,192.2700 | $4,192.27 |
| 85000200 | MAIN EX TR SIG INSTAL | 3 | EACH | $1,371.6400 | $4,114.92 | $5,256.3600 | $15,769.08 |
| 87301215 | ELCBL C SIGNAL 14 2C | 1,751 | FOOT | $2.9600 | $5,182.96 | $4.3200 | $7,564.32 |
| 87301225 | ELCBL C SIGNAL 14 3C | 1,148 | FOOT | $3.1500 | $3,616.20 | $4.5200 | $5,188.96 |
| 87301245 | ELCBL C SIGNAL 14 5C | 602 | FOOT | $3.6200 | $2,179.24 | $4.9600 | $2,985.92 |
| 87301900 | ELCBL C EGRDC 6 1C | 1,274 | FOOT | $3.7700 | $4,802.98 | $6.1800 | $7,873.32 |
| 87900200 | DRILL EX HANDHOLE | 10 | EACH | $426.6300 | $4,266.30 | $782.4400 | $7,824.40 |
| 88102717 | PED SH LED 1F BM CDT | 8 | EACH | $606.9400 | $4,855.52 | $1,035.3100 | $8,282.48 |
| 88600100 | DET LOOP T1 | 1,583 | FOOT | $29.9400 | $47,395.02 | $37.5500 | $59,441.65 |
| 89500400 | RELOC EX PED PUSH-BUT | 3 | EACH | $101.5700 | $304.71 | $333.0400 | $999.12 |
| 89502300 | REM ELCBL FR CON | 362 | FOOT | $0.1400 | $50.68 | $2.5000 | $905.00 |
| 89502350 | REM & RE ELCBL FR CON | 54 | FOOT | $0.2800 | $15.12 | $5.0100 | $270.54 |
| 89502375 ★ | REMOV EX TS EQUIP | 2 | EACH | $192.1400 | $384.28 | $1,502.3900 | $3,004.78 |
| 89502376 ★ | REBUILD EX HANDHOLE | 7 | EACH | $2,351.5200 | $16,460.64 | $2,940.6800 | $20,584.76 |
| 89502380 | REMOV EX HANDHOLE | 2 | EACH | $583.3900 | $1,166.78 | $1,564.8900 | $3,129.78 |
| X0320050 ★ | CONSTRUCTN LAYOUT SPL | 1 | L SUM | $3,000.0000 | $3,000.00 | $7,150.0000 | $7,150.00 |
| X1400367 ★ | PED SIGNAL POST 10 FT | 4 | EACH | $1,316.2400 | $5,264.96 | $1,974.8700 | $7,899.48 |
| X1400378 ★ | PED SIGNAL POST 5 FT | 5 | EACH | $1,071.8400 | $5,359.20 | $1,570.7500 | $7,853.75 |
| X2800002 ★ | PREF THPL PM SPL | 160 | SQ YD | $163.6500 | $26,184.00 | $164.0000 | $26,240.00 |
| X4400501 ★ | CC&G RMVL REPL < = 10 | 25 | FOOT | $65.0000 | $1,625.00 | $127.0000 | $3,175.00 |
| X4400503 ★ | CC&G RMVL REPL > 10FT | 633 | FOOT | $55.0000 | $34,815.00 | $84.5000 | $53,488.50 |
| X5537800 ★ | SS CLEANED 12 | 250 | FOOT | $5.0000 | $1,250.00 | $5.0000 | $1,250.00 |
| X6030310 ★ | FR & LIDS ADJUST SPL | 13 | EACH | $1,250.0000 | $16,250.00 | $1,250.0000 | $16,250.00 |
| X6700407 ★ | ENGRS FLD OFC TY A D1 | 6 | CAL MO | $3,500.0000 | $21,000.00 | $1,500.0000 | $9,000.00 |
| X7200061 ★ | TEMP INFO SIGNING | 128.5 | SQ FT | $16.0000 | $2,056.00 | $35.0000 | $4,497.50 |
| X8510204 ★ | PAINT NEW PED P-B PST | 4 | EACH | $36.0000 | $144.00 | $34.5000 | $138.00 |
| X8570215 ★ | FAC IN EXIST CAB | 1 | EACH | $6,495.0400 | $6,495.04 | $6,852.2300 | $6,852.23 |
| X8760200 ★ | ACCESSIBLE PED SIGNAL | 16 | EACH | $1,645.2600 | $26,324.16 | $2,121.1500 | $33,938.40 |
| X8780012 ★ | CONC FDN TY A 12D | 36 | FOOT | $349.0800 | $12,566.88 | $325.4000 | $11,714.40 |
| X8870400 ★ | EVP S LSC AS 20 3C | 274 | FOOT | $2.8000 | $767.20 | $4.1700 | $1,142.58 |
| Z0018500 ★ | DRAINAGE STR CLEANED | 12 | EACH | $350.0000 | $4,200.00 | $350.0000 | $4,200.00 |
| Z0033044 ★ | RE-OPTIMIZE SIG SYS 1 | 3 | EACH | $792.0000 | $2,376.00 | $632.5000 | $1,897.50 |
Source: public Illinois DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →