IN
Indiana DOT · Bid Tabulation
Contract R-42521-A
ROAD REHABILITATION AND BRIDGE REHABILITATION
- County
- VIGO
- District
- Crawfordsville
- Letting
- April 8, 2026
- Bidders
- 4
Apparent low bid
RIETH-RILEY CONSTRUCTION CO., INC.
$5,563,512.16
Other bidders
MILESTONE CONTRACTORS SOUTH LLC
$6,096,612.00
CALUMET CIVIL CONTRACTORS INC
$6,234,000.00
HIS CONSTRUCTORS INC
$6,658,868.56
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | RIETH-RILEY CONSTRUCTION CO., INC. $5,563,512.16 | MILESTONE CONTRACTORS SOUTH LLC $6,096,612.00 | CALUMET CIVIL CONTRACTORS INC $6,234,000.00 | HIS CONSTRUCTORS INC $6,658,868.56 | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 105-06845 | CONSTRUCTION ENGINEERING | 1 | LS | $45,580.0000 | $45,580.00 | $50,000.0000 | $50,000.00 | $55,000.0000 | $55,000.00 | $157,929.9100 | $157,929.91 |
| 109-08359 | LIQUIDATED DAMAGES | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-08360 | CONTRACT LIENS | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-08440 | QUALITY ADJUSTMENTS, HMA | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-08443 | QUALITY ADJUSTMENTS, TEMPORARY TRAFFIC CONTROL DEVICES | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-08444 | QUALITY ADJUSTMENTS, FAILED MATERIALS | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-08463 | PROJECT ESTIMATE ADJUSTMENT | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-09377 | QUALITY ADJUSTMENTS, PAVEMENT TRAFFIC MARKINGS | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-09489 | PAYMENT ADJUSTMENT, PG ASPHALT BINDER | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 109-11362 | QUALITY ADJUSTMENTS, FAILURE TO MAINTAIN TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES | 1 | DOL | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 | $1.0000 | $1.00 |
| 110-01001 | MOBILIZATION AND DEMOBILIZATION | 1 | LS | $303,910.2700 | $303,910.27 | $304,000.0000 | $304,000.00 | $295,400.8200 | $295,400.82 | $332,943.4200 | $332,943.42 |
| 201-02265 | TREE, 48 IN., REMOVE | 3 | EACH | $4,950.0000 | $14,850.00 | $4,100.0000 | $12,300.00 | $4,000.0000 | $12,000.00 | $5,940.0000 | $17,820.00 |
| 201-02270 | TREE, 60 IN., REMOVE | 1 | EACH | $9,350.0000 | $9,350.00 | $5,100.0000 | $5,100.00 | $5,000.0000 | $5,000.00 | $11,220.0000 | $11,220.00 |
| 201-52370 | CLEARING RIGHT-OF-WAY | 1 | LS | $33,470.0000 | $33,470.00 | $121,000.0000 | $121,000.00 | $120,000.0000 | $120,000.00 | $133,177.3700 | $133,177.37 |
| 201-90788 | DEBRIS, REMOVE, STRUCTURE NO. 1 | 1 | LS | $7,420.3500 | $7,420.35 | $9,000.0000 | $9,000.00 | $15,000.0000 | $15,000.00 | $24,363.0000 | $24,363.00 |
| 202-02240 | PAVEMENT REMOVAL | 1,100 | SYS | $21.1400 | $23,254.00 | $55.0000 | $60,500.00 | $27.0000 | $29,700.00 | $32.0000 | $35,200.00 |
| 202-51328 | PRESENT STRUCTURE, REMOVE PORTIONS, STRUCTURE NO. 1 | 1 | LS | $107,508.9300 | $107,508.93 | $126,500.0000 | $126,500.00 | $152,540.0000 | $152,540.00 | $247,500.0000 | $247,500.00 |
| 203-02000 | EXCAVATION, COMMON | 8,845 | CYS | $40.1700 | $355,303.65 | $40.0000 | $353,800.00 | $45.0000 | $398,025.00 | $36.0000 | $318,420.00 |
| 203-02070 | BORROW | 50 | CYS | $0.0100 | $0.50 | $67.0000 | $3,350.00 | $75.0000 | $3,750.00 | $21.0000 | $1,050.00 |
| 205-12108 | STORMWATER MANAGEMENT BUDGET | 100,000 | DOL | $1.0000 | $100,000.00 | $1.0000 | $100,000.00 | $1.0000 | $100,000.00 | $1.0000 | $100,000.00 |
| 205-12616 | STORMWATER MANAGEMENT IMPLEMENTATION | 1 | LS | $26,680.3400 | $26,680.34 | $11,000.0000 | $11,000.00 | $75,000.0000 | $75,000.00 | $58,061.0000 | $58,061.00 |
| 205-12618 | SWQCP PREPARATION | 1 | LS | $3,920.0000 | $3,920.00 | $2,700.0000 | $2,700.00 | $4,000.0000 | $4,000.00 | $9,111.0000 | $9,111.00 |
| 206-51230 | EXCAVATION, FOUNDATION, UNCLASSIFIED | 18 | CYS | $261.4600 | $4,706.28 | $40.0000 | $720.00 | $130.0000 | $2,340.00 | $88.0000 | $1,584.00 |
| 206-51235 | COFFERDAM | 1 | LS | $35,599.6100 | $35,599.61 | $25,000.0000 | $25,000.00 | $50,000.0000 | $50,000.00 | $74,121.0000 | $74,121.00 |
| 207-08264 | SUBGRADE TREATMENT, TYPE II | 3,064 | SYS | $26.2300 | $80,368.72 | $29.0000 | $88,856.00 | $23.0000 | $70,472.00 | $35.0000 | $107,240.00 |
| 207-08266 | SUBGRADE TREATMENT, TYPE III | 5,899 | SYS | $4.3500 | $25,660.65 | $3.0000 | $17,697.00 | $7.0000 | $41,293.00 | $0.4600 | $2,713.54 |
| 207-09935 | SUBGRADE TREATMENT, TYPE IC | 13,192 | SYS | $38.8500 | $512,509.20 | $38.5000 | $507,892.00 | $38.0000 | $501,296.00 | $37.0000 | $488,104.00 |
| 211-02050 | B BORROW | 1,066 | CYS | $62.8100 | $66,955.46 | $81.0000 | $86,346.00 | $60.0000 | $63,960.00 | $33.0000 | $35,178.00 |
| 211-06467 | AGGREGATE FOR END BENT BACKFILL | 20 | CYS | $246.4000 | $4,928.00 | $200.0000 | $4,000.00 | $95.0000 | $1,900.00 | $159.0000 | $3,180.00 |
| 214-11796 | GEOGRID, TYPE IB | 781 | SYS | $2.1000 | $1,640.10 | $3.5000 | $2,733.50 | $2.0000 | $1,562.00 | $4.0000 | $3,124.00 |
| 214-12239 | GEOTEXTILE FOR PAVEMENT, TYPE 2B | 372 | SYS | $3.8900 | $1,447.08 | $5.5000 | $2,046.00 | $5.5000 | $2,046.00 | $6.0000 | $2,232.00 |
| 301-12233 | COMPACTED AGGREGATE, NO. 8 | 100 | CYS | $183.5100 | $18,351.00 | $74.0000 | $7,400.00 | $105.0000 | $10,500.00 | $135.0000 | $13,500.00 |
| 302-06464 | SUBBASE FOR PCCP | 72 | CYS | $153.6800 | $11,064.96 | $275.0000 | $19,800.00 | $235.0000 | $16,920.00 | $149.0000 | $10,728.00 |
| 302-07455 | DENSE GRADED SUBBASE | 70 | CYS | $77.7400 | $5,441.80 | $120.0000 | $8,400.00 | $122.0000 | $8,540.00 | $129.0000 | $9,030.00 |
| 303-01180 | COMPACTED AGGREGATE, NO. 53 | 7,648 | TON | $39.4900 | $302,019.52 | $41.0000 | $313,568.00 | $62.0000 | $474,176.00 | $45.0000 | $344,160.00 |
| 303-08210 | COMPACTED AGGREGATE, NO. 53, TEMPORARY FOR DRIVEWAYS | 1,283 | TON | $76.5700 | $98,239.31 | $30.0000 | $38,490.00 | $62.0000 | $79,546.00 | $44.0000 | $56,452.00 |
| 304-07493 | WIDENING WITH HMA, TYPE B , 9.5 FT | 672 | TON | $150.6850 | $101,241.06 | $152.5000 | $99,270.00 | $120.0000 | $76,360.00 | $155.5000 | $100,858.00 |
| 304-12623 | HMA PATCHING, FULL DEPTH, TYPE B | 80 | TON | $320.7800 | $25,662.40 | $317.0000 | $25,360.00 | $170.0000 | $13,600.00 | $317.2000 | $25,376.00 |
| 306-08034 | MILLING, ASPHALT, 1 1/2 IN. | 3,288 | SYS | $3.4300 | $11,277.84 | $3.0000 | $9,864.00 | $2.5500 | $8,384.40 | $3.4100 | $11,212.08 |
| 306-11872 | MILLING, PROFILE | 14,990 | SYS | $2.9000 | $43,471.00 | $3.5000 | $52,465.00 | $2.5500 | $38,224.50 | $2.8800 | $43,171.20 |
| 401-000001 | QC/QA-HMA, 2, 58S, SURFACE, 9.5 mm | 2,561 | TON | $99.6700 | $255,254.87 | $108.0000 | $276,588.00 | $115.0000 | $294,515.00 | $98.5400 | $252,360.94 |
| 401-000037 | QC/QA-HMA, 2, 58S, INTERMEDIATE, 19.0 mm | 5,442 | TON | $87.0200 | $473,562.84 | $95.0000 | $516,990.00 | $110.0000 | $598,620.00 | $86.0300 | $468,175.26 |
| 401-000046 | QC/QA-HMA, 2, 58S, BASE, 25.0 mm | 3,725 | TON | $95.9600 | $357,451.00 | $89.5000 | $333,387.50 | $108.0000 | $402,300.00 | $94.8700 | $353,390.75 |
| 401-11526 | JOINT ADHESIVE | 16,305 | LFT | $0.5500 | $8,967.75 | $1.1000 | $17,935.50 | $0.4500 | $7,337.25 | $0.5400 | $8,804.70 |
| 401-12439 | VOID REDUCING ASPHALT MEMBRANE FOR HMA | 18,404 | LFT | $3.1000 | $57,052.40 | $3.2000 | $58,892.80 | $3.0000 | $55,212.00 | $3.1000 | $57,052.40 |
| 402-07451 | HMA WEDGE AND LEVEL, TYPE B | 118 | TON | $130.0000 | $15,340.00 | $211.5000 | $24,957.00 | $125.0000 | $14,750.00 | $128.5200 | $15,165.36 |
| 402-10086 | HMA FOR TEMPORARY PAVEMENT, TYPE C | 155 | TON | $165.2400 | $25,612.20 | $187.0000 | $28,985.00 | $145.0000 | $22,475.00 | $181.4300 | $28,121.65 |
| 406-05520 | ASPHALT FOR TACK COAT | 24 | TON | $0.0100 | $0.24 | $633.0000 | $15,192.00 | $1.0000 | $24.00 | $0.0100 | $0.24 |
| 601-01522 | GUARDRAIL TRANSITION, TYPE TGB | 1 | EACH | $3,200.0000 | $3,200.00 | $3,355.0000 | $3,355.00 | $3,200.0000 | $3,200.00 | $3,200.0000 | $3,200.00 |
| 601-01846 | GUARDRAIL TERMINAL SYSTEM, W-BEAM, CURVED, TYPE 3 | 1 | EACH | $3,400.0000 | $3,400.00 | $3,600.0000 | $3,600.00 | $3,400.0000 | $3,400.00 | $3,400.0000 | $3,400.00 |
| 601-02241 | GUARDRAIL, REMOVE | 431 | LFT | $6.0000 | $2,586.00 | $6.5000 | $2,801.50 | $6.0000 | $2,586.00 | $6.0000 | $2,586.00 |
| 601-09238 | HAND DIG GUARDRAIL POST HOLES | 5 | EACH | $190.0000 | $950.00 | $200.0000 | $1,000.00 | $190.0000 | $950.00 | $190.0000 | $950.00 |
| 601-12292 | GUARDRAIL TRANSITION, MGS WITHOUT CURB | 1 | EACH | $3,725.0000 | $3,725.00 | $3,915.0000 | $3,915.00 | $3,725.0000 | $3,725.00 | $3,725.0000 | $3,725.00 |
| 601-94689 | GUARDRAIL END TREATMENT, TYPE OS | 1 | EACH | $3,400.0000 | $3,400.00 | $3,600.0000 | $3,600.00 | $3,400.0000 | $3,400.00 | $3,400.0000 | $3,400.00 |
| 603-02736 | FENCE, WOOD, RESET | 20 | LFT | $205.0000 | $4,100.00 | $215.0000 | $4,300.00 | $205.0000 | $4,100.00 | $205.0000 | $4,100.00 |
| 603-06065 | FENCE, CHAIN LINK, RESET | 202 | LFT | $27.0000 | $5,454.00 | $29.0000 | $5,858.00 | $27.0000 | $5,454.00 | $27.0000 | $5,454.00 |
| 604-05528 | HMA FOR SIDEWALK | 748 | TON | $102.5300 | $76,692.44 | $116.0000 | $86,768.00 | $125.0000 | $93,500.00 | $101.3600 | $75,817.28 |
| 604-06070 | SIDEWALK, CONCRETE | 374 | SYS | $61.1200 | $22,858.88 | $95.0000 | $35,530.00 | $74.0000 | $27,676.00 | $105.0000 | $39,270.00 |
| 604-08086 | CURB RAMP, CONCRETE | 84 | SYS | $274.2400 | $23,036.16 | $290.0000 | $24,360.00 | $200.0000 | $16,800.00 | $299.0000 | $25,116.00 |
| 604-12083 | DETECTABLE WARNING SURFACES | 24 | SYS | $311.9400 | $7,486.56 | $145.0000 | $3,480.00 | $400.0000 | $9,600.00 | $356.0000 | $8,544.00 |
| 605-06120 | CURB, CONCRETE | 548 | LFT | $35.2800 | $19,333.44 | $65.0000 | $35,620.00 | $50.0000 | $27,400.00 | $75.0000 | $41,100.00 |
| 609-06259 | REINFORCED CONCRETE BRIDGE APPROACH, 12 IN. | 292 | SYS | $180.1700 | $52,609.64 | $250.0000 | $73,000.00 | $215.0000 | $62,780.00 | $269.0000 | $78,548.00 |
| 610-07487 | HMA FOR APPROACHES, TYPE B | 1,114 | TON | $192.0600 | $213,954.84 | $203.0000 | $226,142.00 | $155.0000 | $172,670.00 | $264.0000 | $294,096.00 |
| 610-09108 | PCCP FOR APPROACHES, 9 IN. | 138 | SYS | $101.7100 | $14,035.98 | $152.0000 | $20,976.00 | $125.0000 | $17,250.00 | $145.0000 | $20,010.00 |
| 611-06497 | MAILBOX ASSEMBLY, SINGLE | 60 | EACH | $295.0000 | $17,700.00 | $310.0000 | $18,600.00 | $295.0000 | $17,700.00 | $295.0000 | $17,700.00 |
| 611-06498 | MAILBOX ASSEMBLY, DOUBLE | 6 | EACH | $400.0000 | $2,400.00 | $421.0000 | $2,526.00 | $400.0000 | $2,400.00 | $400.0000 | $2,400.00 |
| 616-05689 | RIPRAP, CLASS 2 | 170 | TON | $187.3500 | $31,849.50 | $108.0000 | $18,360.00 | $150.0000 | $25,500.00 | $106.0000 | $18,020.00 |
| 616-06405 | RIPRAP, REVETMENT | 8 | TON | $119.8800 | $959.04 | $100.0000 | $800.00 | $135.0000 | $1,080.00 | $234.0000 | $1,872.00 |
| 616-12246 | GEOTEXTILE FOR RIPRAP, TYPE 1A | 156 | SYS | $6.9100 | $1,077.96 | $9.5000 | $1,482.00 | $7.5000 | $1,170.00 | $8.0000 | $1,248.00 |
| 621-01004 | MOBILIZATION AND DEMOBILIZATION FOR SEEDING | 2 | EACH | $800.0000 | $1,600.00 | $850.0000 | $1,700.00 | $450.0000 | $900.00 | $600.0000 | $1,200.00 |
| 621-06545 | FERTILIZER FOR PERMANENT SEEDING | 1 | TON | $800.0000 | $800.00 | $850.0000 | $850.00 | $1,100.0000 | $1,100.00 | $10.0000 | $10.00 |
| 621-06554 | SEED MIXTURE, TYPE U | 350 | LBS | $10.0000 | $3,500.00 | $11.0000 | $3,850.00 | $6.9000 | $2,415.00 | $10.0000 | $3,500.00 |
| 621-06565 | MULCHING MATERIAL | 3.56 | TON | $510.0000 | $1,815.60 | $540.0000 | $1,922.40 | $600.0000 | $2,136.00 | $600.0000 | $2,136.00 |
| 622-05650 | PLANT, DECIDUOUS TREE, SINGLE STEM, OVER 2 IN. TO 2.5 IN. | 20 | EACH | $435.0000 | $8,700.00 | $450.0000 | $9,000.00 | $675.0000 | $13,500.00 | $695.0000 | $13,900.00 |
| 628-09403 | FIELD OFFICE, TYPE C | 18 | MOS | $3,628.5500 | $65,313.90 | $3,800.0000 | $68,400.00 | $3,200.0000 | $57,600.00 | $1,500.0000 | $27,000.00 |
| 629-000149 | TOPSOIL PROCESSING AND DISTRIBUTION | 8,470 | SYS | $7.0200 | $59,459.40 | $11.0000 | $93,170.00 | $9.0000 | $76,230.00 | $1.5300 | $12,959.10 |
| 629-000150 | TOPSOIL AMENDMENT BUDGET | 16,940 | DOL | $1.0000 | $16,940.00 | $1.0000 | $16,940.00 | $1.0000 | $16,940.00 | $1.0000 | $16,940.00 |
| 702-04325 | TEMPORARY SHORING | 1 | LS | $0.6700 | $0.67 | $25,000.0000 | $25,000.00 | $15,000.0000 | $15,000.00 | $49,870.0000 | $49,870.00 |
| 702-12076 | GRATES, BASINS, AND FITTINGS, CAST IRON | 11 | EACH | $2,518.2200 | $27,700.42 | $5,100.0000 | $56,100.00 | $2,817.0000 | $30,987.00 | $4,375.0000 | $48,125.00 |
| 702-51863 | FIELD DRILLED HOLE IN CONCRETE | 380 | EACH | $42.3300 | $16,085.40 | $23.0000 | $8,740.00 | $19.0000 | $7,220.00 | $29.0000 | $11,020.00 |
| 703-06029 | REINFORCING BARS, EPOXY COATED | 57,784 | LBS | $1.4700 | $84,942.48 | $1.7000 | $98,232.80 | $1.5200 | $87,831.68 | $2.4900 | $143,882.16 |
| 703-97936 | THREADED TIE BAR ASSEMBLY, EPOXY COATED | 128 | EACH | $65.3400 | $8,363.52 | $42.0000 | $5,376.00 | $48.0000 | $6,144.00 | $74.0000 | $9,472.00 |
| 704-51002 | CONCRETE, C, SUPERSTRUCTURE | 142 | CYS | $1,361.5000 | $193,333.00 | $1,650.0000 | $234,300.00 | $1,148.0000 | $163,016.00 | $2,279.0000 | $323,618.00 |
| 706-06351 | CONCRETE BRIDGE RAILING TRANSITION, TYPE TPF-1 | 2 | EACH | $4,771.4300 | $9,542.86 | $11,000.0000 | $22,000.00 | $4,850.0000 | $9,700.00 | $9,000.0000 | $18,000.00 |
| 706-06353 | CONCRETE BRIDGE RAILING TRANSITION, TYPE TPS-1 | 2 | EACH | $4,771.4300 | $9,542.86 | $11,000.0000 | $22,000.00 | $4,890.0000 | $9,780.00 | $9,000.0000 | $18,000.00 |
| 706-09961 | RAILING, CONCRETE TYPE PS-1 | 155 | LFT | $207.7500 | $32,201.25 | $140.0000 | $21,700.00 | $200.0000 | $31,000.00 | $249.0000 | $38,595.00 |
| 706-09962 | RAILING, CONCRETE TYPE PF-1 | 123 | LFT | $212.5100 | $26,138.73 | $165.0000 | $20,295.00 | $195.0000 | $23,985.00 | $249.0000 | $30,627.00 |
| 706-11404 | RAILING, STEEL TYPE PF-1 | 131 | LFT | $94.0000 | $12,314.00 | $95.0000 | $12,445.00 | $94.0000 | $12,314.00 | $99.4300 | $13,025.33 |
| 706-11418 | RAILING, STEEL TYPE PS-1 | 163 | LFT | $94.0000 | $15,322.00 | $100.0000 | $16,300.00 | $94.0000 | $15,322.00 | $98.3600 | $16,032.68 |
| 707-09862 | STRUCTURAL MEMBER, CONCRETE, BOX BEAM, 27 IN. X 48 IN. | 305 | LFT | $487.9400 | $148,821.70 | $490.0000 | $149,450.00 | $588.0000 | $179,340.00 | $718.0000 | $218,990.00 |
| 709-04647 | FIBER WRAP CONCRETE CASING SYSTEM | 1 | LS | $6,554.0000 | $6,554.00 | $18,000.0000 | $18,000.00 | $24,837.0000 | $24,837.00 | $23,628.6700 | $23,628.67 |
| 709-51821 | SURFACE SEAL , BRIDGE NO. | 1 | LS | $7,500.0000 | $7,500.00 | $100.0000 | $100.00 | $6,000.0000 | $6,000.00 | $9,644.0000 | $9,644.00 |
| 715-05048 | PIPE, TYPE 4, CIRCULAR, DIAMETER 6 IN. | 350 | LFT | $25.1300 | $8,795.50 | $28.0000 | $9,800.00 | $25.0000 | $8,750.00 | $16.0000 | $5,600.00 |
| 715-05407 | PIPE, END BENT DRAIN, DIAMETER 6 IN. | 122 | LFT | $34.0500 | $4,154.10 | $18.0000 | $2,196.00 | $12.5000 | $1,525.00 | $14.0000 | $1,708.00 |
| 720-12798 | CASTING, MANHOLE, ADJUST TO GRADE | 17 | EACH | $693.9300 | $11,796.81 | $1,300.0000 | $22,100.00 | $525.0000 | $8,925.00 | $68.0000 | $1,156.00 |
| 720-45235 | CATCH BASIN, TYPE E7 | 8 | EACH | $3,243.1100 | $25,944.88 | $3,200.0000 | $25,600.00 | $3,500.0000 | $28,000.00 | $2,219.0000 | $17,752.00 |
| 720-94840 | CASTING, WATER VALVE, ADJUST TO GRADE | 10 | EACH | $460.8200 | $4,608.20 | $800.0000 | $8,000.00 | $800.0000 | $8,000.00 | $1,474.0000 | $14,740.00 |
| 722-000134 | BRIDGE DECK OVERLAY, RIGID | 636 | SYS | $172.4700 | $109,690.92 | $200.0000 | $127,200.00 | $150.0000 | $95,400.00 | $118.0000 | $75,048.00 |
| 722-01066 | HYDRODEMOLITION | 636 | SYS | $148.9700 | $94,744.92 | $170.0000 | $108,120.00 | $180.0000 | $114,480.00 | $132.0000 | $83,952.00 |
| 722-12380 | BRIDGE DECK OVERLAY BUDGET | 17,400 | DOL | $1.0000 | $17,400.00 | $1.0000 | $17,400.00 | $1.0000 | $17,400.00 | $1.0000 | $17,400.00 |
| 722-12464 | BRIDGE DECK, REMOVE CONCRETE SURFACE | 636 | SYS | $19.9200 | $12,669.12 | $28.0000 | $17,808.00 | $2.5000 | $1,590.00 | $16.0000 | $10,176.00 |
| 722-12732 | LONGITUDINAL GROOVING | 868 | SYS | $6.7700 | $5,876.36 | $7.0000 | $6,076.00 | $14.5000 | $12,586.00 | $3.4600 | $3,003.28 |
| 722-51401 | BRIDGE DECK PATCHING, FULL DEPTH | 50 | SFT | $231.4200 | $11,571.00 | $144.0000 | $7,200.00 | $75.0000 | $3,750.00 | $10.0000 | $500.00 |
| 722-51874 | OVERLAY DAM | 79 | SFT | $93.1000 | $7,354.90 | $160.0000 | $12,640.00 | $80.0000 | $6,320.00 | $99.0000 | $7,821.00 |
| 726-11451 | BEARING ASSEMBLY, FIXED, TYPE 1 | 4 | EACH | $1,350.7900 | $5,403.16 | $2,200.0000 | $8,800.00 | $1,535.0000 | $6,140.00 | $2,963.0000 | $11,852.00 |
| 726-92406 | BEARING ASSEMBLY, ELASTOMERIC | 16 | EACH | $379.1800 | $6,066.88 | $540.0000 | $8,640.00 | $650.0000 | $10,400.00 | $499.0000 | $7,984.00 |
| 801-04308 | ROAD CLOSURE SIGN ASSEMBLY | 5 | EACH | $377.0000 | $1,885.00 | $288.0000 | $1,440.00 | $377.0000 | $1,885.00 | $377.0000 | $1,885.00 |
| 801-06206 | TEMPORARY PAVEMENT MARKING, 6 IN. | 47,484 | LFT | $0.2900 | $13,770.36 | $0.5000 | $23,742.00 | $0.4100 | $19,468.44 | $0.2900 | $13,770.36 |
| 801-06209 | TEMPORARY PAVEMENT MARKING, REMOVABLE, 6 IN. | 3,000 | LFT | $2.5600 | $7,680.00 | $2.0000 | $6,000.00 | $2.5600 | $7,680.00 | $2.5600 | $7,680.00 |
| 801-06640 | CONSTRUCTION SIGN, TYPE A | 25 | EACH | $314.0000 | $7,850.00 | $240.0000 | $6,000.00 | $314.0000 | $7,850.00 | $314.0000 | $7,850.00 |
| 801-06645 | CONSTRUCTION SIGN, TYPE B | 4 | EACH | $106.0000 | $424.00 | $121.0000 | $484.00 | $106.0000 | $424.00 | $106.0000 | $424.00 |
| 801-06775 | MAINTAINING TRAFFIC | 1 | LS | $86,246.2600 | $86,246.26 | $147,904.5000 | $147,904.50 | $185,000.0000 | $185,000.00 | $437,950.9300 | $437,950.93 |
| 801-07118 | BARRICADE, TYPE III-A | 44 | LFT | $18.0000 | $792.00 | $18.0000 | $792.00 | $18.0000 | $792.00 | $18.0000 | $792.00 |
| 801-07119 | BARRICADE, TYPE III-B | 72 | LFT | $21.0000 | $1,512.00 | $18.0000 | $1,296.00 | $21.0000 | $1,512.00 | $21.0000 | $1,512.00 |
| 801-07612 | TEMPORARY PAVEMENT MARKING, 24 IN. | 22 | LFT | $48.1400 | $1,059.08 | $11.0000 | $242.00 | $48.1400 | $1,059.08 | $48.1400 | $1,059.08 |
| 801-08401 | TEMPORARY TRAFFIC BARRIER, TYPE 2 | 522 | LFT | $40.5600 | $21,172.32 | $70.0000 | $36,540.00 | $40.0000 | $20,880.00 | $34.3200 | $17,915.04 |
| 801-11642 | PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EACH | $3,891.0000 | $7,782.00 | $3,500.0000 | $7,000.00 | $3,891.0000 | $7,782.00 | $3,891.0000 | $7,782.00 |
| 801-12930 | TEMPORARY WORKSITE SPEED LIMIT SIGN ASSEMBLY, INTERMITTENT | 2 | EACH | $2,915.0000 | $5,830.00 | $900.0000 | $1,800.00 | $2,915.0000 | $5,830.00 | $2,915.0000 | $5,830.00 |
| 802-05701 | SIGN POST, SQUARE, TYPE 1, REINFORCED ANCHOR BASE | 225 | LFT | $26.0000 | $5,850.00 | $27.0000 | $6,075.00 | $26.0000 | $5,850.00 | $26.0000 | $5,850.00 |
| 802-07059 | SIGN, SHEET, AND SUPPORTS, REMOVE | 22 | EACH | $200.0000 | $4,400.00 | $211.0000 | $4,642.00 | $200.0000 | $4,400.00 | $200.0000 | $4,400.00 |
| 802-09837 | SIGN, DOUBLE-FACED, SHEET, WITH LEGEND, 0.080 IN. THICKNESS | 2 | SFT | $30.0000 | $60.00 | $32.0000 | $64.00 | $30.0000 | $60.00 | $30.0000 | $60.00 |
| 802-09838 | SIGN, SHEET, WITH LEGEND, 0.080 IN. THICKNESS | 118 | SFT | $26.0000 | $3,068.00 | $27.0000 | $3,186.00 | $26.0000 | $3,068.00 | $26.0000 | $3,068.00 |
| 802-09839 | SIGN, DOUBLE-FACED, SHEET, WITH LEGEND, 0.100 IN. THICKNESS | 55 | SFT | $30.0000 | $1,650.00 | $32.0000 | $1,760.00 | $30.0000 | $1,650.00 | $30.0000 | $1,650.00 |
| 802-09840 | SIGN, SHEET, WITH LEGEND, 0.100 IN. THICKNESS | 24 | SFT | $28.0000 | $672.00 | $30.0000 | $720.00 | $28.0000 | $672.00 | $28.0000 | $672.00 |
| 805-01815 | SIGNAL POLE FOUNDATION, 36 IN. X 144 IN. | 4 | EACH | $5,000.0000 | $20,000.00 | $5,300.0000 | $21,200.00 | $5,000.0000 | $20,000.00 | $5,000.0000 | $20,000.00 |
| 805-01842 | HANDHOLE, SIGNAL, TYPE 1 | 4 | EACH | $2,200.0000 | $8,800.00 | $2,320.0000 | $9,280.00 | $2,200.0000 | $8,800.00 | $2,200.0000 | $8,800.00 |
| 805-02150 | PEDESTRIAN SIGNAL HEAD, COUNTDOWN, 18 IN. | 2 | EACH | $1,100.0000 | $2,200.00 | $1,160.0000 | $2,320.00 | $1,100.0000 | $2,200.00 | $1,100.0000 | $2,200.00 |
| 805-02445 | CONTROLLER AND CABINET, TYPE P1 | 1 | EACH | $22,000.0000 | $22,000.00 | $22,400.0000 | $22,400.00 | $22,000.0000 | $22,000.00 | $22,000.0000 | $22,000.00 |
| 805-09539 | LOOP DETECTOR DELAY AMPLIFIER, COUNTING, NO. 2 CHANNEL | 2 | EACH | $700.0000 | $1,400.00 | $750.0000 | $1,500.00 | $700.0000 | $1,400.00 | $700.0000 | $1,400.00 |
| 805-11813 | CONDUIT, PVC, 2 IN. SCHEDULE 80 | 647 | LFT | $30.0000 | $19,410.00 | $32.0000 | $20,704.00 | $30.0000 | $19,410.00 | $30.0000 | $19,410.00 |
| 805-11817 | PEDESTRIAN PUSH BUTTON, APS | 2 | EACH | $1,350.0000 | $2,700.00 | $1,420.0000 | $2,840.00 | $1,350.0000 | $2,700.00 | $1,350.0000 | $2,700.00 |
| 805-78205 | TRAFFIC SIGNAL HEAD, NO. 3 SECTION, 12 IN. | 10 | EACH | $950.0000 | $9,500.00 | $1,000.0000 | $10,000.00 | $950.0000 | $9,500.00 | $950.0000 | $9,500.00 |
| 805-78415 | SPAN, CATENARY, AND TETHER | 4 | EACH | $3,700.0000 | $14,800.00 | $3,900.0000 | $15,600.00 | $3,700.0000 | $14,800.00 | $3,700.0000 | $14,800.00 |
| 805-78420 | DISCONNECT HANGER | 4 | EACH | $500.0000 | $2,000.00 | $526.0000 | $2,104.00 | $500.0000 | $2,000.00 | $500.0000 | $2,000.00 |
| 805-78445 | SIGNAL SERVICE | 1 | EACH | $2,000.0000 | $2,000.00 | $2,110.0000 | $2,110.00 | $2,000.0000 | $2,000.00 | $2,000.0000 | $2,000.00 |
| 805-78467 | SIGNAL CABLE, SERVICE, COPPER, 3C/8 GAUGE | 14 | LFT | $4.0000 | $56.00 | $4.5000 | $63.00 | $4.0000 | $56.00 | $4.0000 | $56.00 |
| 805-78470 | SIGNAL CABLE, ROADWAY LOOP, COPPER, 1C/14 GAUGE | 1,936 | LFT | $1.4000 | $2,710.40 | $1.5000 | $2,904.00 | $1.4000 | $2,710.40 | $1.4000 | $2,710.40 |
| 805-78485 | SIGNAL CABLE, CONTROL, COPPER, 5C/14 GAUGE | 587 | LFT | $4.0000 | $2,348.00 | $4.2500 | $2,494.75 | $4.0000 | $2,348.00 | $4.0000 | $2,348.00 |
| 805-78490 | SIGNAL CABLE, CONTROL, COPPER, 7C/14 GAUGE | 502 | LFT | $5.0000 | $2,510.00 | $5.5000 | $2,761.00 | $5.0000 | $2,510.00 | $5.0000 | $2,510.00 |
| 805-78495 | SIGNAL CABLE, CONTROL, COPPER, 9C/14 GAUGE | 360 | LFT | $5.5000 | $1,980.00 | $6.0000 | $2,160.00 | $5.5000 | $1,980.00 | $5.5000 | $1,980.00 |
| 805-78510 | SIGNAL CABLE, DETECTOR LEAD-IN, COPPER, 2C/16 GAUGE | 729 | LFT | $1.8500 | $1,348.65 | $2.0000 | $1,458.00 | $1.8500 | $1,348.65 | $1.8500 | $1,348.65 |
| 805-78785 | SIGNAL DETECTOR HOUSING | 4 | EACH | $2,050.0000 | $8,200.00 | $2,150.0000 | $8,600.00 | $2,050.0000 | $8,200.00 | $2,050.0000 | $8,200.00 |
| 805-78795 | SAW CUT FOR ROADWAY LOOP DETECTOR AND SEALANT | 784 | LFT | $10.0000 | $7,840.00 | $11.0000 | $8,624.00 | $10.0000 | $7,840.00 | $10.0000 | $7,840.00 |
| 805-78925 | CONTROLLER CABINET FOUNDATION, TYPE P1 | 1 | EACH | $3,500.0000 | $3,500.00 | $3,700.0000 | $3,700.00 | $3,500.0000 | $3,500.00 | $3,500.0000 | $3,500.00 |
| 805-81032 | SIGNAL POLE, STEEL STRAIN, 30 FT | 4 | EACH | $10,000.0000 | $40,000.00 | $10,300.0000 | $41,200.00 | $10,000.0000 | $40,000.00 | $10,000.0000 | $40,000.00 |
| 805-90005 | SIGNAL POLE, PEDESTAL, 10 FT | 1 | EACH | $2,000.0000 | $2,000.00 | $2,110.0000 | $2,110.00 | $2,000.0000 | $2,000.00 | $2,000.0000 | $2,000.00 |
| 808-06703 | LINE, THERMOPLASTIC, SOLID, WHITE, 4 IN. | 11,698 | LFT | $0.5600 | $6,550.88 | $0.8000 | $9,358.40 | $0.5600 | $6,550.88 | $0.5600 | $6,550.88 |
| 808-06716 | LINE, REMOVE | 12,000 | LFT | $0.3600 | $4,320.00 | $0.8000 | $9,600.00 | $0.3600 | $4,320.00 | $0.3600 | $4,320.00 |
| 808-09381 | RETRO-REFLECTIVITY TESTING | 1 | LS | $3,850.0000 | $3,850.00 | $3,145.0000 | $3,145.00 | $3,850.0000 | $3,850.00 | $3,850.0000 | $3,850.00 |
| 808-10033 | LINE, MULTI-COMPONENT, SOLID, WHITE, 4 IN. | 421 | LFT | $9.0000 | $3,789.00 | $0.6500 | $273.65 | $2.0000 | $842.00 | $2.0000 | $842.00 |
| 808-10034 | LINE, MULTI-COMPONENT, SOLID, YELLOW, 4 IN. | 421 | LFT | $9.0000 | $3,789.00 | $0.6500 | $273.65 | $2.0000 | $842.00 | $2.0000 | $842.00 |
| 808-75240 | LINE, THERMOPLASTIC, BROKEN, YELLOW, 4 IN. | 1,814 | LFT | $1.2100 | $2,194.94 | $1.0000 | $1,814.00 | $1.2100 | $2,194.94 | $1.2100 | $2,194.94 |
| 808-75245 | LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN. | 9,254 | LFT | $0.5700 | $5,274.78 | $1.0000 | $9,254.00 | $0.5700 | $5,274.78 | $0.5700 | $5,274.78 |
| 808-75274 | TRANSVERSE MARKING, THERMOPLASTIC, CROSSHATCH LINE, YELLOW, 8 IN. | 1,663 | LFT | $3.1600 | $5,255.08 | $4.1000 | $6,818.30 | $3.1600 | $5,255.08 | $3.1600 | $5,255.08 |
| 808-75278 | TRANSVERSE MARKING, THERMOPLASTIC, CROSSHATCH LINE, YELLOW, 12 IN. | 250 | LFT | $4.7400 | $1,185.00 | $7.5000 | $1,875.00 | $4.7400 | $1,185.00 | $4.7400 | $1,185.00 |
| 808-75297 | TRANSVERSE MARKING, THERMOPLASTIC, STOP LINE, WHITE, 24 IN. | 158 | LFT | $9.4100 | $1,486.78 | $14.0000 | $2,212.00 | $9.4100 | $1,486.78 | $9.4100 | $1,486.78 |
| 808-75300 | TRANSVERSE MARKING, THERMOPLASTIC, CROSSWALK LINE, WHITE, 6 IN. | 237 | LFT | $2.3600 | $559.32 | $3.7500 | $888.75 | $2.3600 | $559.32 | $2.3600 | $559.32 |
| 808-75320 | PAVEMENT MESSAGE MARKING, THERMOPLASTIC, LANE INDICATION ARROW | 21 | EACH | $163.0000 | $3,423.00 | $210.0000 | $4,410.00 | $163.0000 | $3,423.00 | $163.0000 | $3,423.00 |
| 808-75325 | PAVEMENT MESSAGE MARKING, THERMOPLASTIC, 'ONLY' | 21 | EACH | $208.0000 | $4,368.00 | $250.0000 | $5,250.00 | $208.0000 | $4,368.00 | $208.0000 | $4,368.00 |
Source: public Indiana DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →