KS Kansas DOT · Bid Tabulation

Contract 526022232

GRADING, BRIDGE AND SURFACING. US-24: BR 001 (LOST CREEK) LOC 0.53 MI E OF MC COLN IN CD CO. LGTH IS 0.237 MI.

County
CLOUD
Letting
February 18, 2026
Bidders
2
Apparent low bid BRIDGES INC. $3,264,534.14
Other bidders L & M CONTRACTORS INC $3,321,804.96

Bid Items - unit price and extension by bidder

Item Description Qty UOM BRIDGES INC. $3,264,534.14 L & M CONTRACTORS INC $3,321,804.96
Unit Price Extension Unit Price Extension
000097 SWPPP INSPECTION / 43 EACH $235.0000 $10,105.00 $250.0000 $10,750.00
000098 SWPPP DESIGN / 1 LS $2,200.0000 $2,200.00 $5,750.0000 $5,750.00
000103 WATER POLLUTION CONTROL MANAGER / 43 EACH $235.0000 $10,105.00 $250.0000 $10,750.00
010114 WATER (GRADING) (SET PRICE) / 1 MGAL $40.0000 $40.00 $40.0000 $40.00
010123 WATER (EROSION CONTROL) (SET PRICE) / 1 MGAL $40.0000 $40.00 $40.0000 $40.00
010598 SILT FENCE / 758 LNFT $1.5000 $1,137.00 $3.5000 $2,653.00
011478 WATER (EARTHWORK COMPACTION) (SET PRICE) / 1 MGAL $40.0000 $40.00 $40.0000 $40.00
011492 CHANNELIZER (PORTABLE) / 9,800 EADA $0.4000 $3,920.00 $0.1000 $980.00
011590 TEMPORARY SURFACING MATERIAL (AGGREGATE) (SET PRICE) / 1 CUYD $50.0000 $50.00 $50.0000 $50.00
011764 MILLING / 6,095 SQYD $2.9000 $17,675.50 $2.9000 $17,675.50
011899 CONCRETE (GRADE 4.0) (AE) (RCB) / 17.1 CUYD $2,264.9700 $38,730.99 $2,300.0000 $39,330.00
012073 CONCRETE (GRADE 4.0) (AE) (SW) / 356.6 CUYD $1,150.0000 $410,090.00 $1,015.0000 $361,949.00
012083 CONCRETE (GRADE 4.0) (RCB) / 46.5 CUYD $2,264.9700 $105,321.11 $2,300.0000 $106,950.00
012317 COMPACTION OF EARTHWORK (TYPE A) (MR-5-5) / 32,394 CUYD $1.0000 $32,394.00 $1.2500 $40,492.50
012319 COMPACTION OF EARTHWORK (TYPE AA) (MR-5-5) / 1,758 CUYD $2.0000 $3,516.00 $2.0000 $3,516.00
012340 FOUNDATION STABILIZATION (SET PRICE) / 1 CUYD $40.0000 $40.00 $40.0000 $40.00
012341 FOUNDATION STABILIZATION / 20 CUYD $160.4300 $3,208.60 $170.0000 $3,400.00
012400 CLASS I EXCAVATION / 255 CUYD $84.0000 $21,420.00 $40.0000 $10,200.00
012401 CLASS II EXCAVATION / 112 CUYD $475.0000 $53,200.00 $175.0000 $19,600.00
012410 COMMON EXCAVATION (RURAL SMALL) / 30,421 CUYD $3.9000 $118,641.90 $3.9800 $121,075.58
012415 COMMON EXCAVATION (CONTRACTOR FURNISHED) / 29,651 CUYD $8.3500 $247,585.85 $8.0300 $238,097.53
012420 ROCK EXCAVATION / 1,603 CUYD $16.2400 $26,032.72 $25.0000 $40,075.00
012896 CONCRETE HEADWALL / 2 EACH $20,000.0000 $40,000.00 $15,000.0000 $30,000.00
013019 PAVEMENT MARKING REMOVAL / 8,100 LNFT $1.0000 $8,100.00 $0.5000 $4,050.00
013333 BRIDGE DECK GROOVING / 490 SQYD $8.0000 $3,920.00 $10.0000 $4,900.00
013605 CONCRETE PAVEMENT (12" UNIFORM) (AE) (BR APP) / 296 SQYD $325.0000 $96,200.00 $290.0000 $85,840.00
014053 TEST PILES (SPECIAL) (HP10X42) / 135 LNFT $94.0000 $12,690.00 $80.0000 $10,800.00
014069 PILES (STEEL) (HP10X42) / 1,513 LNFT $81.0000 $122,553.00 $68.0000 $102,884.00
014176 SIGNING OBJECT MARKER (TYPE 2) / 4 EACH $100.0000 $400.00 $200.0000 $800.00
014184 ABUTMENT STRIP DRAIN / 42 SQYD $85.0000 $3,570.00 $115.0000 $4,830.00
020001 MAINTENANCE AND RESTORATION OF HAUL ROADS (SET PRICE) / NON PART 1 LS $4,000.0000 $4,000.00 $4,000.0000 $4,000.00
020100 CONTRACTOR CONSTRUCTION STAKING / 1 LS $15,000.0000 $15,000.00 $18,950.0000 $18,950.00
023456 GUARDRAIL, STEEL PLATE (MGS) / 425 LNFT $58.0000 $24,650.00 $63.0000 $26,775.00
025100 REINFORCING STEEL (GRADE 60) / 8,500 LBS. $1.7850 $17,376.60 $1.5100 $13,735.60
025103 REINFORCING STEEL (GRADE 60) (EPOXY COATED) / 104,070 LBS. $1.5750 $166,105.50 $1.6500 $180,496.50
025186 GRANULAR BACKFILL (WINGWALLS) / 36 CUYD $89.2500 $3,213.00 $100.0000 $3,600.00
025200 REMOVAL OF EXISTING STRUCTURES / 1 LS $35,540.0000 $35,540.00 $50,000.0000 $50,000.00
025323 MOBILIZATION / 1 LS $310,000.0000 $310,000.00 $460,350.0000 $460,350.00
025331 WORK ZONE SIGNS ( 0 TO 9.25 SQ.FT.) / 7,840 EADA $0.6500 $5,096.00 $0.1500 $1,176.00
025332 WORK ZONE SIGNS ( 9.26 TO 16.25 SQ.FT.) / 4,480 EADA $0.7500 $3,360.00 $0.2500 $1,120.00
025343 WORK ZONE WARNING LIGHT (TYPE "A" LOW INTENSITY) / 2,240 EADA $0.5000 $1,120.00 $0.4000 $896.00
025361 CLEARING AND GRUBBING / 1 LS $14,000.0000 $14,000.00 $25,000.0000 $25,000.00
025376 WORK ZONE BARRICADES (TYPE 3 - 4 TO 12 LIN. FT.) / 3,360 EADA $0.9000 $3,024.00 $0.4000 $1,344.00
025509 BRIDGE APPROACH SLAB FOOTING / 47.4 CUYD $725.0000 $34,365.00 $660.0000 $31,284.00
025600 FIELD OFFICE AND LABORATORY (TYPE A) / 2 EACH $3,655.8000 $7,311.60 $750.0000 $1,500.00
030189 SALVAGED TOPSOIL / 43,284 SQYD $0.7000 $30,298.80 $1.0000 $43,284.00
030537 SOIL EROSION MIX / 770.4 LBS. $14.0000 $10,785.60 $8.5000 $6,548.40
030567 GUARDRAIL END TERMINAL (MGS-FLEAT) / 4 EACH $4,571.0000 $18,284.00 $5,400.0000 $21,600.00
040707 CURING ENVIRONMENT / 1 LS $750.0000 $750.00 $300.0000 $300.00
041003 HMA-COMMERCIAL GRADE (CLASS A) / 5,691 TON $130.3500 $741,821.85 $130.3500 $741,821.85
050775 ENTRANCE PIPE ( 24") / 181 LNFT $49.1000 $8,887.10 $50.0000 $9,050.00
051300 CROSS ROAD PIPE ( 48") / 186 LNFT $127.6900 $23,750.34 $110.0000 $20,460.00
051900 CROSS ROAD PIPE ( 84") / 250 LNFT $210.3800 $52,595.00 $210.0000 $52,500.00
054600 END SECTION ( 24") / 6 EACH $309.2400 $1,855.44 $250.0000 $1,500.00
070580 FLAGGER (SET PRICE) / 1 HOUR $30.0000 $30.00 $30.0000 $30.00
070619 RIGID RAISED PAVEMENT MARKER (TYPE I) / 65 EACH $20.0000 $1,300.00 $25.0000 $1,625.00
070828 FILTER SOCK (12") / 2,589 LNFT $2.3500 $6,084.15 $3.0000 $7,767.00
070916 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE I) / 152 STAL $98.0000 $14,896.00 $135.0000 $20,520.00
070917 PAVEMENT MARKING (TEMP) 4" SOLID (TYPE II) / 80 STAL $91.0000 $7,280.00 $52.0000 $4,160.00
070974 SLOPE PROTECTION (RIPRAP STONE) / 452 CUYD $108.0000 $48,816.00 $105.0000 $47,460.00
071021 BRIDGE BACKWALL PROTECTION SYSTEM / 126 SQYD $52.9700 $6,751.44 $52.5000 $6,810.00
071291 SEDIMENT REMOVAL (SET PRICE) / 1 CUYD $50.0000 $50.00 $50.0000 $50.00
071554 CONCRETE FOR SEAL COURSE (SET PRICE) / 1 CUYD $225.0000 $225.00 $225.0000 $225.00
072116 TRAFFIC CONTROL (INITIAL SETUP) / 1 LS $15,220.0000 $15,220.00 $40,000.0000 $40,000.00
072144 RIGHT-OF-WAY SURVEY MONUMENT / 13 EACH $200.0000 $2,600.00 $50.0000 $650.00
072222 TEMPORARY FERTILIZER (15-30-15) / 568 LBS. $1.5000 $852.00 $2.0000 $1,136.00
072286 EROSION CONTROL (CLASS 1) (TYPE D) / 33,059 SQYD $1.7500 $57,853.25 $2.0000 $66,118.00
072287 EROSION CONTROL (CLASS 2) (TYPE E) / 1,370 SQYD $2.8500 $3,904.50 $6.0000 $8,220.00
072350 CONCRETE (GRADE 4.0) (AE) / 105.5 CUYD $1,500.0000 $158,250.00 $1,015.0000 $107,082.50
072400 TEMPORARY BERM (SET PRICE) / 1 LNFT $2.0000 $2.00 $2.0000 $2.00
072411 GEOTEXTILE (EROSION CONTROL) / 500 SQYD $6.2500 $3,125.00 $5.0000 $2,500.00
081050 PAVEMENT EDGE WEDGE (ROCK) / 210 TON $53.2300 $11,178.30 $60.0000 $12,600.00

Source: public Kansas DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.

Want the analysis, not just the numbers? DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel. Explore DOTestimate →