KY
Kentucky DOT · Bid Tabulation
Contract 26-1510
WIDENING THREE SPRINGS RD (KY 884)
- County
- WARREN
- Letting
- April 23, 2026
- Bidders
- 2
Apparent low bid
SCOTTY'S CONTRACTING & STONE LLC
$14,589,688.92
Other bidders
CLEARY CONSTRUCTION INC
$18,330,000.00
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | SCOTTY'S CONTRACTING & STONE LLC $14,589,688.92 | CLEARY CONSTRUCTION INC $18,330,000.00 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| '02355 | G/R-STEEL W BEAM-S FACE | 362.5 | LF | $25.5700 | $9,269.13 | $45.0000 | $16,312.50 |
| 00003 | CRUSHED STONE BASE | 11,715 | TON | $36.2300 | $424,434.45 | $39.0000 | $456,885.00 |
| 00078 | CRUSHED AGGREGATE SIZE NO 2 | 12,292 | TON | $33.8800 | $416,452.96 | $38.0000 | $467,096.00 |
| 00100 | ASPHALT SEAL AGGREGATE | 9 | TON | $59.3000 | $533.70 | $300.0000 | $2,700.00 |
| 00103 | ASPHALT SEAL COAT | 1 | TON | $842.5000 | $842.50 | $1,600.0000 | $1,600.00 |
| 00190 | LEVELING & WEDGING PG64-22 | 1,341 | TON | $112.3000 | $150,594.30 | $150.0000 | $201,150.00 |
| 00214 | CL3 ASPH BASE 1.00D PG64-22 | 17,384 | TON | $91.9300 | $1,598,111.12 | $110.0000 | $1,912,240.00 |
| 00342 | CL4 ASPH SURF 0.38A PG76-22 | 185 | TON | $208.2000 | $38,517.00 | $165.0000 | $30,525.00 |
| 00388 | CL3 ASPH SURF 0.38B PG64-22 | 3,114 | TON | $122.0100 | $379,939.14 | $125.0000 | $389,250.00 |
| 00441 | ENTRANCE PIPE-18 IN | 60 | LF | $107.2700 | $6,436.20 | $130.0000 | $7,800.00 |
| 00443 | ENTRANCE PIPE-24 IN | 180 | LF | $130.7800 | $23,540.40 | $135.0000 | $24,300.00 |
| 00461 | CULVERT PIPE-15 IN | 48 | LF | $125.5800 | $6,027.84 | $155.0000 | $7,440.00 |
| 00520 | STORM SEWER PIPE-12 IN | 4 | LF | $306.9900 | $1,227.96 | $400.0000 | $1,600.00 |
| 00521 | STORM SEWER PIPE-15 IN | 2,464 | LF | $105.7200 | $260,494.08 | $125.0000 | $308,000.00 |
| 00522 | STORM SEWER PIPE-18 IN | 5,706 | LF | $110.0400 | $627,888.24 | $140.0000 | $798,840.00 |
| 00524 | STORM SEWER PIPE-24 IN | 1,474 | LF | $130.8700 | $192,902.38 | $150.0000 | $221,100.00 |
| 01000 | PERFORATED PIPE-4 IN | 565 | LF | $23.7700 | $13,430.05 | $38.0000 | $21,470.00 |
| 01010 | NON-PERFORATED PIPE-4 IN | 89 | LF | $23.9800 | $2,134.22 | $48.0000 | $4,272.00 |
| 01020 | PERF PIPE HEADWALL TY 1-4 IN | 2 | EACH | $788.2200 | $1,576.44 | $1,200.0000 | $2,400.00 |
| 01202 | PIPE CULVERT HEADWALL-15 IN | 2 | EACH | $1,400.0000 | $2,800.00 | $3,000.0000 | $6,000.00 |
| 01204 | PIPE CULVERT HEADWALL-18 IN | 5 | EACH | $1,800.0000 | $9,000.00 | $3,500.0000 | $17,500.00 |
| 01208 | PIPE CULVERT HEADWALL-24 IN | 1 | EACH | $2,000.0000 | $2,000.00 | $3,750.0000 | $3,750.00 |
| 01432 | SLOPED BOX OUTLET TYPE 1-15 IN | 1 | EACH | $2,500.0000 | $2,500.00 | $3,500.0000 | $3,500.00 |
| 01451 | S & F BOX INLET-OUTLET-24 IN | 1 | EACH | $3,200.0000 | $3,200.00 | $5,000.0000 | $5,000.00 |
| 01456 | CURB BOX INLET TYPE A | 68 | EACH | $7,200.0000 | $489,600.00 | $9,000.0000 | $612,000.00 |
| 01496 | DROP BOX INLET TYPE 3 | 11 | EACH | $5,400.0000 | $59,400.00 | $9,500.0000 | $104,500.00 |
| 01544 | DROP BOX INLET TYPE 11 | 1 | EACH | $4,800.0000 | $4,800.00 | $4,750.0000 | $4,750.00 |
| 01547 | DROP BOX INLET TYPE 12 | 40 | LF | $585.0000 | $23,400.00 | $635.0000 | $25,400.00 |
| 01559 | DROP BOX INLET TYPE 13G | 7 | EACH | $4,800.0000 | $33,600.00 | $5,500.0000 | $38,500.00 |
| 01568 | DROP BOX INLET TYPE 13S | 1 | EACH | $8,500.0000 | $8,500.00 | $9,500.0000 | $9,500.00 |
| 01577 | DROP BOX INLET TYPE 14 | 15 | EACH | $4,000.0000 | $60,000.00 | $4,500.0000 | $67,500.00 |
| 01740 | CORED HOLE DRAINAGE BOX CON-4 IN | 75 | EACH | $200.0000 | $15,000.00 | $800.0000 | $60,000.00 |
| 01756 | MANHOLE TYPE A | 1 | EACH | $5,000.0000 | $5,000.00 | $5,500.0000 | $5,500.00 |
| 01810 | STANDARD CURB AND GUTTER | 16,150 | LF | $24.5800 | $396,967.00 | $24.5800 | $396,967.00 |
| 01811 | STANDARD CURB AND GUTTER MOD | 446 | LF | $69.5700 | $31,028.22 | $69.5700 | $31,028.22 |
| 01820 | LIP CURB AND GUTTER | 301 | LF | $36.1200 | $10,872.12 | $36.1200 | $10,872.12 |
| 01830 | STANDARD INTEGRAL CURB | 138 | LF | $32.2100 | $4,444.98 | $32.2100 | $4,444.98 |
| 01875 | STANDARD HEADER CURB | 920 | LF | $26.6500 | $24,518.00 | $26.6500 | $24,518.00 |
| 01890 | ISLAND HEADER CURB TYPE 1 | 86 | LF | $44.2000 | $3,801.20 | $44.2000 | $3,801.20 |
| 02003 | RELOCATE TEMP CONC BARRIER | 5,030 | LF | $8.4300 | $42,402.90 | $13.0000 | $65,390.00 |
| 02084 | JPC PAVEMENT-8 IN | 359 | SQYD | $125.4500 | $45,036.55 | $125.4500 | $45,036.55 |
| 02091 | REMOVE PAVEMENT | 700 | SQYD | $18.8900 | $13,223.00 | $40.0000 | $28,000.00 |
| 02101 | CEM CONC ENT PAVEMENT-8 IN | 1,884 | SQYD | $101.5700 | $191,357.88 | $101.5700 | $191,357.88 |
| 02157 | PAVED DITCH TYPE 1 | 25 | SQYD | $261.7100 | $6,542.75 | $261.7100 | $6,542.75 |
| 02159 | TEMP DITCH | 4,123 | LF | $0.0100 | $41.23 | $1.0000 | $4,123.00 |
| 02160 | CLEAN TEMP DITCH | 2,062 | LF | $0.0100 | $20.62 | $0.0100 | $20.62 |
| 02165 | REMOVE PAVED DITCH | 22 | SQYD | $54.2800 | $1,194.16 | $50.0000 | $1,100.00 |
| 02230 40026 | EMBANKMENT IN PLACE | 34,092 | CUYD | $22.4600 | $765,706.32 | $59.0000 | $2,011,428.00 |
| 02231 | STRUCTURE GRANULAR BACKFILL | 242 | CUYD | $97.0000 | $23,474.00 | $97.0000 | $23,474.00 |
| 02242 | WATER | 312 | MGAL | $0.0100 | $3.12 | $0.0100 | $3.12 |
| 02265 | REMOVE FENCE | 1,036 | LF | $3.9100 | $4,050.76 | $5.0000 | $5,180.00 |
| 02275 | FENCE-8 FT CHAIN LINK | 924 | LF | $82.1700 | $75,925.08 | $100.0000 | $92,400.00 |
| 02367 | G/R END TREATMENT TYPE 1 | 2 | EACH | $3,014.8400 | $6,029.68 | $5,000.0000 | $10,000.00 |
| 02370 | G/R END TREATMENT TYPE 2M | 3 | EACH | $1,371.5000 | $4,114.50 | $2,000.0000 | $6,000.00 |
| 02381 | REMOVE G/R | 1,555 | LF | $1.7900 | $2,783.45 | $2.0000 | $3,110.00 |
| 02403 | REMOVE CONCRETE MASONRY | 18.9 | CUYD | $285.0000 | $5,386.50 | $285.0000 | $5,386.50 |
| 02429 | RIGHT-OF-WAY MONUMENT TYPE 1 | 65 | EACH | $243.7000 | $15,840.50 | $150.0000 | $9,750.00 |
| 02432 | WITNESS POST | 33 | EACH | $145.4000 | $4,798.20 | $150.0000 | $4,950.00 |
| 02483 | CHANNEL LINING CLASS II | 3,395 | TON | $58.9600 | $200,169.20 | $68.0000 | $230,860.00 |
| 02484 | CHANNEL LINING CLASS III | 3,335 | TON | $62.8400 | $209,571.40 | $65.0000 | $216,775.00 |
| 02545 | CLEARING AND GRUBBING | 1 | LS | $62,711.2400 | $62,711.24 | $200,000.0000 | $200,000.00 |
| 02562 | TEMPORARY SIGNS | 354 | SQFT | $10.2500 | $3,628.50 | $8.4800 | $3,001.92 |
| 02568 40178 | MOBILIZATION | 1 | LS | $543,985.0000 | $543,985.00 | $855,000.0000 | $855,000.00 |
| 02569 | DEMOBILIZATION | 1 | LS | $209,625.0000 | $209,625.00 | $257,078.2100 | $257,078.21 |
| 02585 | EDGE KEY | 20 | LF | $43.8700 | $877.40 | $325.0000 | $6,500.00 |
| 02602 40176 | FABRIC-GEOTEXTILE CLASS 1 | 2,320 | SQYD | $4.3500 | $10,092.00 | $3.2500 | $7,540.00 |
| 02603 | FABRIC-GEOTEXTILE CLASS 2 | 12,850 | SQYD | $2.1500 | $27,627.50 | $2.5000 | $32,125.00 |
| 02607 | FABRIC-GEOTEXTILE CLASS 2 FOR PIPE | 15,135 | SQYD | $2.0000 | $30,270.00 | $2.0000 | $30,270.00 |
| 02650 | MAINTAIN & CONTROL TRAFFIC | 2 | LS | $151,419.8850 | $302,839.77 | $355,000.0000 | $710,000.00 |
| 02671 | PORTABLE CHANGEABLE MESSAGE SIGN | 6 | EACH | $11,403.6000 | $68,421.60 | $8,904.0000 | $53,424.00 |
| 02676 | MOBILIZATION FOR MILL & TEXT | 1 | LS | $5,944.4700 | $5,944.47 | $3,500.0000 | $3,500.00 |
| 02677 | ASPHALT PAVE MILLING & TEXTURING | 280 | TON | $62.4100 | $17,474.80 | $140.0000 | $39,200.00 |
| 02690 | SAFELOADING | 10 | CUYD | $500.0000 | $5,000.00 | $450.0000 | $4,500.00 |
| 02701 | TEMP SILT FENCE | 6,477 | LF | $2.1600 | $13,990.32 | $3.5000 | $22,669.50 |
| 02703 | SILT TRAP TYPE A | 15 | EACH | $283.3400 | $4,250.10 | $345.0000 | $5,175.00 |
| 02704 40037 | SILT TRAP TYPE B | 15 | EACH | $266.0600 | $3,990.90 | $195.0000 | $2,925.00 |
| 02705 40031 | SILT TRAP TYPE C | 15 | EACH | $228.7900 | $3,431.85 | $325.0000 | $4,875.00 |
| 02706 | CLEAN SILT TRAP TYPE A | 15 | EACH | $70.4400 | $1,056.60 | $0.0100 | $0.15 |
| 02707 | CLEAN SILT TRAP TYPE B | 15 | EACH | $70.4400 | $1,056.60 | $0.0100 | $0.15 |
| 02708 | CLEAN SILT TRAP TYPE C | 15 | EACH | $72.2800 | $1,084.20 | $0.0100 | $0.15 |
| 02720 | SIDEWALK-4 IN CONCRETE | 7,459 | SQYD | $49.7400 | $371,010.66 | $51.0000 | $380,409.00 |
| 02726 | STAKING | 1 | LS | $126,366.2500 | $126,366.25 | $250,000.0000 | $250,000.00 |
| 02731 | REMOVE STRUCTURE | 1 | LS | $131,390.0000 | $131,390.00 | $131,390.0000 | $131,390.00 |
| 02898 | RELOCATE CRASH CUSHION | 6 | EACH | $2,300.4500 | $13,802.70 | $3,000.0000 | $18,000.00 |
| 02900 | INSTALL TEMP CRASH CUSHION | 8 | EACH | $4,324.8300 | $34,598.64 | $9,000.0000 | $72,000.00 |
| 03171 | CONC BARRIER WALL TYPE 9T | 2,860 | LF | $23.3400 | $66,752.40 | $110.0000 | $314,600.00 |
| 03299 | ARMORED EDGE FOR CONCRETE | 76.2 | LF | $103.9000 | $7,917.18 | $103.9000 | $7,917.18 |
| 04700 | POLE 30 FT MTG HT | 10 | EACH | $2,650.0000 | $26,500.00 | $2,650.0000 | $26,500.00 |
| 04720 | BRACKET 4 FT | 2 | EACH | $508.0000 | $1,016.00 | $508.0000 | $1,016.00 |
| 04723 | BRACKET 10 FT | 7 | EACH | $975.0000 | $6,825.00 | $975.0000 | $6,825.00 |
| 04725 | BRACKET 15 FT | 1 | EACH | $1,018.0000 | $1,018.00 | $1,018.0000 | $1,018.00 |
| 04740 | POLE BASE | 10 | EACH | $3,217.0000 | $32,170.00 | $3,217.0000 | $32,170.00 |
| 04750 | TRANSFORMER BASE | 10 | EACH | $1,717.0000 | $17,170.00 | $1,717.0000 | $17,170.00 |
| 04761 | LIGHTING CONTROL EQUIPMENT | 1 | EACH | $21,950.0000 | $21,950.00 | $21,950.0000 | $21,950.00 |
| 04780 | FUSED CONNECTOR KIT | 20 | EACH | $261.0000 | $5,220.00 | $261.0000 | $5,220.00 |
| 04795 | CONDUIT-2 IN | 250 | LF | $21.9100 | $5,477.50 | $21.9100 | $5,477.50 |
| 04820 | TRENCHING AND BACKFILLING | 1,267 | LF | $4.4200 | $5,600.14 | $4.4200 | $5,600.14 |
| 04832 | WIRE-NO. 12 | 1,209 | LF | $1.6300 | $1,970.67 | $1.6300 | $1,970.67 |
| 05950 40032 | EROSION CONTROL BLANKET | 6,500 | SQYD | $1.8500 | $12,025.00 | $1.8500 | $12,025.00 |
| 05952 | TEMP MULCH | 57,482 | SQYD | $0.2000 | $11,496.40 | $0.2000 | $11,496.40 |
| 05953 | TEMP SEEDING AND PROTECTION | 42,897 | SQYD | $0.3000 | $12,869.10 | $0.3000 | $12,869.10 |
| 05963 | INITIAL FERTILIZER | 1.3 | TON | $1,500.0000 | $1,950.00 | $1,500.0000 | $1,950.00 |
| 05964 | MAINTENANCE FERTILIZER | 2.1 | TON | $1,500.0000 | $3,150.00 | $1,500.0000 | $3,150.00 |
| 05985 | SEEDING AND PROTECTION | 6,222 | SQYD | $0.4200 | $2,613.24 | $0.4200 | $2,613.24 |
| 05990 40047 | SODDING | 27,619 | SQYD | $8.0000 | $220,952.00 | $8.0000 | $220,952.00 |
| 05992 | AGRICULTURAL LIMESTONE | 25 | TON | $75.0000 | $1,875.00 | $75.0000 | $1,875.00 |
| 06406 | SBM ALUM SHEET SIGNS .080 IN | 297 | SQFT | $33.9700 | $10,089.09 | $15.0000 | $4,455.00 |
| 06410 | STEEL POST TYPE 1 | 400 | LF | $17.3600 | $6,944.00 | $40.0000 | $16,000.00 |
| 06511 | PAVE STRIPING-TEMP PAINT-6 IN | 122,860 | LF | $0.3100 | $38,086.60 | $0.3100 | $38,086.60 |
| 06515 | PAVE STRIPING-PERM PAINT-6 IN | 39,989 | LF | $0.3300 | $13,196.37 | $0.3300 | $13,196.37 |
| 06517 | PAVE STRIPING-PERM PAINT-12 IN | 77 | LF | $5.0000 | $385.00 | $5.0000 | $385.00 |
| 06546 | PAVE STRIPING-THERMO-12 IN W | 603 | LF | $6.0000 | $3,618.00 | $6.0000 | $3,618.00 |
| 06547 | PAVE STRIPING-THERMO-12 IN Y | 77 | LF | $6.0000 | $462.00 | $6.0000 | $462.00 |
| 06568 | PAVE MARKING-THERMO STOP BAR-24IN | 62 | LF | $15.0000 | $930.00 | $15.0000 | $930.00 |
| 06574 | PAVE MARKING-THERMO CURV ARROW | 34 | EACH | $150.0000 | $5,100.00 | $150.0000 | $5,100.00 |
| 06575 | PAVE MARKING-THERMO COMB ARROW | 8 | EACH | $300.0000 | $2,400.00 | $300.0000 | $2,400.00 |
| 06578 | PAVE MARKING-THERMO MERGE ARROW | 1 | EACH | $500.0000 | $500.00 | $500.0000 | $500.00 |
| 06610 | INLAID PAVEMENT MARKER-MW | 18 | EACH | $25.0000 | $450.00 | $25.0000 | $450.00 |
| 06612 | INLAID PAVEMENT MARKER-BY | 379 | EACH | $25.0000 | $9,475.00 | $25.0000 | $9,475.00 |
| 08003 | FOUNDATION PREPARATION | 2 | LS | $237,319.3150 | $474,638.63 | $237,319.3150 | $474,638.63 |
| 08020 | CRUSHED AGGREGATE SLOPE PROT | 1,217 | TON | $37.6500 | $45,820.05 | $37.6500 | $45,820.05 |
| 08033 | TEST PILES | 108 | LF | $100.0000 | $10,800.00 | $100.0000 | $10,800.00 |
| 08046 | PILES-STEEL HP12X53 | 956 | LF | $90.0000 | $86,040.00 | $90.0000 | $86,040.00 |
| 08094 | PILE POINTS-12 IN | 22 | EACH | $275.0000 | $6,050.00 | $275.0000 | $6,050.00 |
| 08100 | CONCRETE-CLASS A | 660.99 | CUYD | $1,240.3333 | $568,956.10 | $973.6667 | $567,364.10 |
| 08104 | CONCRETE-CLASS AA | 630.7 | CUYD | $1,030.0000 | $649,621.00 | $1,030.0000 | $649,621.00 |
| 08136 | MECHANICAL REINF COUPLER #11 | 36 | EACH | $290.0000 | $10,440.00 | $290.0000 | $10,440.00 |
| 08150 | STEEL REINFORCEMENT | 81,664 | LB | $2.0250 | $161,184.00 | $2.0250 | $161,184.00 |
| 08151 | STEEL REINFORCEMENT-EPOXY COATED | 139,496 | LB | $2.0000 | $278,992.00 | $2.0000 | $278,992.00 |
| 08670 | PRECAST PC BOX BEAM SB27 | 1,592.5 | LF | $495.0000 | $788,287.50 | $495.0000 | $788,287.50 |
| 08709 | BRIDGE CHAIN LINK FENCE-7 FT | 456 | LF | $178.0000 | $81,168.00 | $178.0000 | $81,168.00 |
| 10020NS | FUEL ADJUSTMENT | 21,374 | DOLL | $1.0000 | $21,374.00 | $1.0000 | $21,374.00 |
| 10030NS | ASPHALT ADJUSTMENT | 83,017 | DOLL | $1.0000 | $83,017.00 | $1.0000 | $83,017.00 |
| 20071EC | JOINT ADHESIVE | 28,600 | LF | $0.5000 | $14,300.00 | $0.5000 | $14,300.00 |
| 20191ED | OBJECT MARKER TY 3 | 2 | EACH | $26.1800 | $52.36 | $75.0000 | $150.00 |
| 20314ED | MILLED RUMBLE STRIPS | 1,600 | LF | $2.8500 | $4,560.00 | $2.8500 | $4,560.00 |
| 20391NS835 | ELECTRICAL JUNCTION BOX TYPE A | 8 | EACH | $1,757.0000 | $14,056.00 | $1,757.0000 | $14,056.00 |
| 20411ED | LAW ENFORCEMENT OFFICER | 300 | HOUR | $96.7500 | $29,025.00 | $90.0000 | $27,000.00 |
| 20629NS719 | THRIE BEAM TO W BEAM CONNECTOR | 2 | EACH | $319.1100 | $638.22 | $2,000.0000 | $4,000.00 |
| 20743ED | DRILLED SHAFT 54 IN-SOLID ROCK | 135 | LF | $3,359.0000 | $453,465.00 | $3,359.0000 | $453,465.00 |
| 20744ED | DRILLED SHAFT 60 IN-COMMON | 459 | LF | $1,300.0000 | $596,700.00 | $1,300.0000 | $596,700.00 |
| 20745ED | ROCK SOUNDINGS | 488.3 | LF | $58.6000 | $28,614.38 | $58.6000 | $28,614.38 |
| 20746ED | ROCK CORINGS | 354 | LF | $93.7500 | $33,187.50 | $93.7500 | $33,187.50 |
| 21289ED | LONGITUDINAL EDGE KEY | 7,397 | LF | $4.3100 | $31,881.07 | $3.2500 | $24,040.25 |
| 21321NC | CSL TESTING (4 TUBES) | 15 | EACH | $3,090.0000 | $46,350.00 | $3,090.0000 | $46,350.00 |
| 21543EN | BORE AND JACK CONDUIT | 250 | LF | $62.3500 | $15,587.50 | $62.3500 | $15,587.50 |
| 21799EN | BORE AND JACK PIPE-24 IN | 113 | LF | $638.5100 | $72,151.63 | $850.0000 | $96,050.00 |
| 21802EN | G/R STEEL W BEAM-S FACE (7 FT POST) | 2,137.5 | LF | $28.8500 | $61,666.88 | $38.0000 | $81,225.00 |
| 22520EN | PAVE MARKING-THERMO YIELD BAR-36 IN | 56 | LF | $40.0000 | $2,240.00 | $40.0000 | $2,240.00 |
| 23158ES505 | DETECTABLE WARNINGS | 428 | SQFT | $43.9400 | $18,806.32 | $43.9400 | $18,806.32 |
| 23378EC | CONCRETE SEALING | 30,303 | SQFT | $2.2100 | $66,969.63 | $2.2100 | $66,969.63 |
| 23778EC | WIRE-NO. 10 | 5,169 | LF | $1.6300 | $8,425.47 | $1.6300 | $8,425.47 |
| 23813EC | DECK DRAIN | 8 | EACH | $935.0000 | $7,480.00 | $935.0000 | $7,480.00 |
| 24114EC | PAVE MARK-THERMO-YIELD | 4 | EACH | $400.0000 | $1,600.00 | $400.0000 | $1,600.00 |
| 24496ED | PRECAST BOX CULVERT 6'X3' | 95 | LF | $1,285.0000 | $122,075.00 | $1,285.0000 | $122,075.00 |
| 24589ED | LED LUMINAIRE | 10 | EACH | $703.0000 | $7,030.00 | $703.0000 | $7,030.00 |
| 24631EC | BARCODE SIGN INVENTORY | 67 | EACH | $23.4300 | $1,569.81 | $20.0000 | $1,340.00 |
| 24695ED | BOX CULVERT HEADWALL | 2 | EACH | $11,145.0000 | $22,290.00 | $11,145.0000 | $22,290.00 |
| 24814EC | PIPELINE INSPECTION | 5,643 | LF | $2.3500 | $13,261.05 | $2.3500 | $13,261.05 |
| 24845EC | UTILITY COORDINATION | 1 | LS | $32,250.0000 | $32,250.00 | $75,000.0000 | $75,000.00 |
| 24900EC | PVC CONDUIT-1 1/4 IN-SCHEDULE 80 | 1,267 | LF | $8.9200 | $11,301.64 | $8.9200 | $11,301.64 |
| 24970EC | ASPHALT MATERIAL FOR TACK NON-TRACKING | 40.17 | TON | $664.3200 | $26,685.73 | $725.0000 | $29,123.25 |
| 25079ED | THRIE BEAM G/R TRANSITION TL-2 | 4 | EACH | $2,190.0200 | $8,760.08 | $3,000.0000 | $12,000.00 |
| 26233EC | MOBILIZATION FOR CONCRETE SURF TREATMENT | 1 | LS | $13,070.0000 | $13,070.00 | $13,070.0000 | $13,070.00 |
| 26236EC | THRIE BEAM BULLNOSE TERMINAL | 2 | EACH | $21,057.5700 | $42,115.14 | $22,000.0000 | $44,000.00 |
| 26248EC | ELECTRONIC DELIVERY MGMT SYSTEM - AGG | 1 | LS | $0.0100 | $0.01 | $0.0100 | $0.01 |
Source: public Kentucky DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.