BRIDGE REPLACEMENT CR 1086
- County
- ROCKCASTLE
- Letting
- May 21, 2026
- Bidders
- 3
Apparent low bid
KAY & KAY CONTRACTING LLC
$719,611.94
Other bidders
HINKLE CONSTRUCTION SERVICES LLC
$729,512.93
JAVE LLC
$771,218.68
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | KAY & KAY CONTRACTING LLC $719,611.94 | HINKLE CONSTRUCTION SERVICES LLC $729,512.93 | JAVE LLC $771,218.68 | |||
|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 00001 | DGA BASE | 104 | TON | $85.0000 | $8,840.00 | $64.0000 | $6,656.00 | $84.6800 | $8,806.72 |
| 00100 | ASPHALT SEAL AGGREGATE | 2 | TON | $250.0000 | $500.00 | $410.0000 | $820.00 | $262.5000 | $525.00 |
| 00103 | ASPHALT SEAL COAT | 0.22 | TON | $2,500.0000 | $550.00 | $34,000.0000 | $7,480.00 | $2,625.0000 | $577.50 |
| 00212 | CL2 ASPH BASE 1.00D PG64-22 | 37 | TON | $400.0000 | $14,800.00 | $420.0000 | $15,540.00 | $420.0000 | $15,540.00 |
| 00301 | CL2 ASPH SURF 0.38D PG64-22 | 13 | TON | $700.0000 | $9,100.00 | $730.0000 | $9,490.00 | $735.0000 | $9,555.00 |
| 00356 | ASPHALT MATERIAL FOR TACK | 0.14 | TON | $10.0000 | $1.40 | $10.5000 | $1.47 | $10.5000 | $1.47 |
| 01987 | DELINEATOR FOR G/R BI DIRECTIONAL WHITE | 8 | EACH | $13.0000 | $104.00 | $10.0000 | $80.00 | $13.6500 | $109.20 |
| 02014 | BARRICADE-TYPE III | 2 | EACH | $162.0000 | $324.00 | $150.0000 | $300.00 | $116.0000 | $232.00 |
| 02200 | ROADWAY EXCAVATION | 48 | CUYD | $200.0000 | $9,600.00 | $30.0000 | $1,440.00 | $69.6000 | $3,340.80 |
| 02231 | STRUCTURE GRANULAR BACKFILL | 261.7 | CUYD | $91.1000 | $23,840.87 | $128.0000 | $33,497.60 | $89.3200 | $23,375.04 |
| 02360 | G/R TERMINAL SECTION NO 1 | 1 | EACH | $85.0000 | $85.00 | $78.0000 | $78.00 | $89.2500 | $89.25 |
| 02371 | G/R END TREATMENT TYPE 7 | 3 | EACH | $1,875.0000 | $5,625.00 | $2,170.0000 | $6,510.00 | $1,968.7500 | $5,906.25 |
| 02429 | RIGHT-OF-WAY MONUMENT TYPE 1 | 8 | EACH | $179.5000 | $1,436.00 | $155.0000 | $1,240.00 | $730.8000 | $5,846.40 |
| 02432 | WITNESS POST | 2 | EACH | $146.0000 | $292.00 | $124.0000 | $248.00 | $661.2000 | $1,322.40 |
| 02483 | CHANNEL LINING CLASS II | 200 | TON | $75.5000 | $15,100.00 | $41.0000 | $8,200.00 | $78.8800 | $15,776.00 |
| 02545 | CLEARING AND GRUBBING | 1 | LS | $31,350.0000 | $31,350.00 | $10,830.0000 | $10,830.00 | $46,260.7200 | $46,260.72 |
| 02562 | TEMPORARY SIGNS | 200 | SQFT | $19.5000 | $3,900.00 | $20.0000 | $4,000.00 | $7.3500 | $1,470.00 |
| 02569 | DEMOBILIZATION | 1 | LS | $10,634.6600 | $10,634.66 | $10,800.0000 | $10,800.00 | $11,397.3200 | $11,397.32 |
| 02585 | EDGE KEY | 16 | LF | $156.2500 | $2,500.00 | $165.0000 | $2,640.00 | $164.0600 | $2,624.96 |
| 02602 40176 | FABRIC-GEOTEXTILE CLASS 1 | 200 | SQYD | $6.7000 | $1,340.00 | $2.5000 | $500.00 | $3.6900 | $738.00 |
| 02650 | MAINTAIN & CONTROL TRAFFIC | 1 | LS | $27,000.0000 | $27,000.00 | $28,500.0000 | $28,500.00 | $3,459.1200 | $3,459.12 |
| 02671 | PORTABLE CHANGEABLE MESSAGE SIGN | 2 | EACH | $2,250.0000 | $4,500.00 | $2,515.0000 | $5,030.00 | $2,582.1600 | $5,164.32 |
| 02726 | STAKING | 1 | LS | $6,500.0000 | $6,500.00 | $5,400.0000 | $5,400.00 | $2,900.0000 | $2,900.00 |
| 02731 | REMOVE STRUCTURE | 1 | LS | $27,000.0000 | $27,000.00 | $29,310.0000 | $29,310.00 | $24,424.9600 | $24,424.96 |
| 03299 | ARMORED EDGE FOR CONCRETE | 47 | LF | $145.0000 | $6,815.00 | $70.0000 | $3,290.00 | $99.7600 | $4,688.72 |
| 08003 | FOUNDATION PREPARATION | 1 | LS | $27,000.0000 | $27,000.00 | $45,210.0000 | $45,210.00 | $18,435.8800 | $18,435.88 |
| 08019 | CYCLOPEAN STONE RIP RAP | 399.9 | TON | $58.5000 | $23,394.15 | $68.0000 | $27,193.20 | $64.3900 | $25,749.56 |
| 08033 | TEST PILES | 40 | LF | $136.5000 | $5,460.00 | $142.0000 | $5,680.00 | $167.4100 | $6,696.40 |
| 08039 | PRE-DRILLING FOR PILES | 160 | LF | $271.0000 | $43,360.00 | $368.0000 | $58,880.00 | $426.9800 | $68,316.80 |
| 08046 | PILES-STEEL HP12X53 | 210 | LF | $117.5000 | $24,675.00 | $190.0000 | $39,900.00 | $165.0900 | $34,668.90 |
| 08094 | PILE POINTS-12 IN | 16 | EACH | $160.0000 | $2,560.00 | $0.0100 | $0.16 | $1.1600 | $18.56 |
| 08100 | CONCRETE-CLASS A | 71.9 | CUYD | $1,150.0000 | $82,685.00 | $1,060.0000 | $76,214.00 | $1,313.1200 | $94,413.33 |
| 08104 | CONCRETE-CLASS AA | 43.5 | CUYD | $1,150.0000 | $50,025.00 | $1,750.0000 | $76,125.00 | $1,947.6400 | $84,722.34 |
| 08151 | STEEL REINFORCEMENT-EPOXY COATED | 8,706 | LB | $2.8600 | $24,899.16 | $2.0000 | $17,412.00 | $2.5300 | $22,026.18 |
| 08664 | PRECAST PC BOX BEAM CB27-48 | 330 | LF | $450.0000 | $148,500.00 | $435.0000 | $143,550.00 | $475.9700 | $157,070.10 |
| 21415ND | EROSION CONTROL | 1 | LS | $28,600.0000 | $28,600.00 | $5,000.0000 | $5,000.00 | $8,120.0000 | $8,120.00 |
| 21802EN | G/R STEEL W BEAM-S FACE (7 FT POST) | 137.5 | LF | $29.0000 | $3,987.50 | $41.0000 | $5,637.50 | $30.4500 | $4,186.88 |
| 23378EC | CONCRETE SEALING | 3,200 | SQFT | $2.0000 | $6,400.00 | $1.6000 | $5,120.00 | $2.0200 | $6,464.00 |
| 25099ED | DEEP BEAM BRIDGE G/R | 132 | LF | $263.8500 | $34,828.20 | $230.0000 | $30,360.00 | $306.0500 | $40,398.60 |
| 26233EC | MOBILIZATION FOR CONCRETE SURF TREATMENT | 1 | LS | $1,500.0000 | $1,500.00 | $1,350.0000 | $1,350.00 | $5,800.0000 | $5,800.00 |
Source: public Kentucky DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →