Louisiana DOT · Bid Tabulation
Contract H.014058.6
LA 16: CURVE REALIGNMENT AT GOURDON LANE
- County
- Livingston
- District
- HQ
- Letting
- June 24, 2026
- Bidders
- 2
Apparent low bid
Barber Bros. Contracting Co., L.L.C
$1,517,571.75
Other bidders
Barriere Construction Co., LLC
$2,596,800.44
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | Barber Bros. Contracting Co., L.L.C $1,517,571.75 | Barriere Construction Co., LLC $2,596,800.44 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| 201-01-00100 | Clearing and Grubbing | 1.7 | LUMP | $92,000.0000 | $92,000.00 | $90,000.0000 | $90,000.00 |
| 202-01-00100 | Removal of Structures and Obstructions | 1 | LUMP | $7,000.0000 | $7,000.00 | $30,000.0000 | $30,000.00 |
| 202-02-02000 | Removal of Asphalt Drives | 280 | SQYD | $28.0000 | $7,840.00 | $35.0000 | $9,800.00 |
| 202-02-03000 | Removal of Base – Soil Cement, Asphalt, or BCS | 4,234.9 | SQYD | $14.0000 | $59,288.60 | $19.0000 | $80,463.10 |
| 202-02-06100 | Removal of Concrete Walks and Drives | 41 | SQYD | $49.0000 | $2,009.00 | $50.0000 | $2,050.00 |
| 202-02-38240 | Removal of Signs and Supports | 12 | EACH | $27.0000 | $324.00 | $25.0000 | $300.00 |
| 203-01-00100 | General Excavation | 2,837 | CUYD | $22.0000 | $62,414.00 | $40.0000 | $113,480.00 |
| 203-03-00100 | Embankment | 9,161 | CUYD | $38.0000 | $348,118.00 | $58.0000 | $531,338.00 |
| 204-06-00100 | Temporary Silt Fencing | 2,904 | LNFT | $2.5000 | $7,260.00 | $2.1000 | $6,098.40 |
| 302-02-06030 | Class II Base Course (6" Thick) (Asphalt Concrete Base) | 5,157.4 | SQYD | $45.0000 | $232,083.00 | $70.0000 | $361,018.00 |
| 402-01-00101 | Traffic Maintenance Surfacing (Aggregate) (Vehicular Measurement) | 250 | CUYD | $180.0000 | $45,000.00 | $250.0000 | $62,500.00 |
| 502-01-00100 | Asphalt Concrete | 1,637.3 | TON | $130.0000 | $212,849.00 | $250.0000 | $409,325.00 |
| 502-01-00200 | Asphalt Concrete, Drives, Turnouts and Miscellaneous | 226.9 | TON | $245.0000 | $55,590.50 | $400.0000 | $90,760.00 |
| 509-01-00100 | Milling Asphalt Pavement | 4,235 | SQYD | $9.0000 | $38,115.00 | $15.0000 | $63,525.00 |
| 509-02-00100 | Contractor Retained Reclaimed Asphalt Pavement | -706 | CUYD | $0.1000 | $-70.60 | $0.0100 | $-7.06 |
| 511-01-00100 | Saw Cutting Asphalt Concrete Pavement | 288 | INLF | $9.0000 | $2,592.00 | $10.0000 | $2,880.00 |
| 701-01-01001 | Cross Drain Pipe (24" RCP) | 160 | LNFT | $242.0000 | $38,720.00 | $200.0000 | $32,000.00 |
| 701-05-01066 | Side Drain Pipe (24" RCP) | 50 | LNFT | $271.0000 | $13,550.00 | $200.0000 | $10,000.00 |
| 701-06-01020 | Side Drain Pipe Arch (18" Equiv. RCPA/CMPA) | 158 | LNFT | $240.0000 | $37,920.00 | $160.0000 | $25,280.00 |
| 701-06-01040 | Side Drain Pipe Arch (24" Equiv. RCPA/CMPA) | 41 | LNFT | $290.0000 | $11,890.00 | $180.0000 | $7,380.00 |
| 701-17-00100 | Trench Excavation Safety Protection (Depth >5 feet) | 199.2 | LNFT | $0.0000 | $0.00 | $100.0000 | $19,920.00 |
| 706-02-00200 | Concrete Drive (6" Thick) | 80 | SQYD | $186.0000 | $14,880.00 | $200.0000 | $16,000.00 |
| 708-01-00100 | Right-of-Way Monument | 10 | EACH | $210.0000 | $2,100.00 | $46.0000 | $460.00 |
| 708-02-00100 | Right-of-Way Monument Witness Post | 10 | EACH | $184.0000 | $1,840.00 | $74.0000 | $740.00 |
| 713-01-00100 | Temporary Signs and Barricades | 1 | LUMP | $72,000.0000 | $72,000.00 | $258,000.0000 | $258,000.00 |
| 713-03-01000 | Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) | 1.8 | MILE | $1,053.0000 | $1,895.40 | $700.0000 | $1,260.00 |
| 713-04-01000 | Temporary Pavement Markings (Solid Line) (4" Width) | 3.3 | MILE | $1,264.0000 | $4,171.20 | $1,500.0000 | $4,950.00 |
| 713-11-00100 | Portable Changeable Message Signs | 2 | EACH | $5,000.0000 | $10,000.00 | $10,000.0000 | $20,000.00 |
| 724-01-00100 | Rumble Strips (Centerline) | 0.26 | MILE | $365.0000 | $94.90 | $400.0000 | $104.00 |
| 724-02-00100 | Rumble Strips (Shoulder/Edge) | 0.52 | MILE | $365.0000 | $189.80 | $400.0000 | $208.00 |
| 726-01-00100 | Bedding Material | 46.2 | CUYD | $255.0000 | $11,781.00 | $50.0000 | $2,310.00 |
| 727-01-00100 | Mobilization | 1 | LUMP | $87,000.0000 | $87,000.00 | $258,000.0000 | $258,000.00 |
| 729-01-00100 | Sign (Type A) | 81 | SQFT | $36.0000 | $2,916.00 | $40.0000 | $3,240.00 |
| 729-01-00200 | Mounting of Sign (Type A) | 17 | EACH | $16.0000 | $272.00 | $20.0000 | $340.00 |
| 729-16-00200 | Object Marker Assembly (Type 2) | 4 | EACH | $84.0000 | $336.00 | $80.0000 | $320.00 |
| 729-22-00100 | Perforated Square Tubing Post with 2-1/4" Anchor | 17 | EACH | $255.0000 | $4,335.00 | $380.0000 | $6,460.00 |
| 731-02-00100 | Reflectorized Raised Pavement Markers | 248 | EACH | $10.5000 | $2,604.00 | $8.0000 | $1,984.00 |
| 732-02-02000 | Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) | 1.1 | MILE | $5,800.0000 | $6,380.00 | $7,500.0000 | $8,250.00 |
| 735-01-00100 | Mailboxes | 7 | EACH | $31.0000 | $217.00 | $35.0000 | $245.00 |
| 735-02-00100 | Mailbox Supports (Single) | 7 | EACH | $260.0000 | $1,820.00 | $400.0000 | $2,800.00 |
| 739-01-00100 | Hydro-Seeding | 2.673 | ACRE | $2,150.0000 | $5,746.95 | $3,000.0000 | $8,019.00 |
| 740-01-00100 | Construction Layout | 1 | LUMP | $12,500.0000 | $12,500.00 | $55,000.0000 | $55,000.00 |
Source: public Louisiana DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.