LA Louisiana DOT · Bid Tabulation

Contract H.016438.6

US 171: PED IMPROVEMENTS (SHREVEPORT)

County
Caddo
District
HQ
Letting
June 24, 2026
Bidders
3
Apparent low bid Progressive Construction Co., LLC $2,768,264.08
Other bidders Benton & Brown, LLC. $3,160,396.30 JB JAMES CONSTRUCTION LLC $3,729,018.00

Bid Items - unit price and extension by bidder

Item Description Qty UOM Progressive Construction Co., LLC $2,768,264.08 Benton & Brown, LLC. $3,160,396.30 JB JAMES CONSTRUCTION LLC $3,729,018.00
Unit Price Extension Unit Price Extension Unit Price Extension
202-02-03030 Removal of Pavement Structure 1,213.6 SQYD $60.0000 $72,816.00 $48.0000 $58,252.80 $104.0000 $126,214.40
202-02-06100 Removal of Concrete Walks and Drives 152 SQYD $34.5000 $5,244.00 $36.0000 $5,472.00 $70.0000 $10,640.00
202-02-06102 Removal of Incidental Concrete Paving 37 SQYD $71.0000 $2,627.00 $60.0000 $2,220.00 $100.0000 $3,700.00
202-02-40100 Removal of Traffic Signal Equipment 1 LUMP $3,473.0000 $3,473.00 $20,550.0000 $20,550.00 $23,000.0000 $23,000.00
202-02-40120 Removal of Traffic Detectors and Associated Equipment 1 LUMP $7,575.0000 $7,575.00 $20,000.0000 $20,000.00 $2,000.0000 $2,000.00
203-01-00100 General Excavation 224 CUYD $80.0000 $17,920.00 $48.0000 $10,752.00 $220.0000 $49,280.00
203-03-00100 Embankment 153 CUYD $120.0000 $18,360.00 $78.0000 $11,934.00 $400.0000 $61,200.00
204-02-00100 Temporary Hay Bales 4 EACH $96.5000 $386.00 $60.0000 $240.00 $50.0000 $200.00
204-06-00100 Temporary Silt Fencing 1,200 LNFT $5.0000 $6,000.00 $4.8000 $5,760.00 $15.0000 $18,000.00
302-02-06030 Class II Base Course (6" Thick) (Asphalt Concrete Base) 1,214.7 SQYD $135.0000 $163,984.50 $66.0000 $80,170.20 $105.0000 $127,543.50
305-01-04020 Subgrade Layer (12" Thick) (Treated) 1,216 SQYD $100.0000 $121,600.00 $48.0000 $58,368.00 $300.0000 $364,800.00
402-02-00101 Traffic Maintenance Surfacing (Hard) 156.6 SQYD $125.0000 $19,575.00 $60.0000 $9,396.00 $90.0000 $14,094.00
502-01-00100 Asphalt Concrete 611.6 TON $375.0000 $229,350.00 $400.0000 $244,640.00 $300.0000 $183,480.00
509-01-00100 Milling Asphalt Pavement 5,528 SQYD $10.0000 $55,280.00 $25.0000 $138,200.00 $11.0000 $60,808.00
509-02-00100 Contractor Retained Reclaimed Asphalt Pavement -230 CUYD $0.0100 $-2.30 $0.0100 $-2.30 $0.0100 $-2.30
601-01-00300 Portland Cement Concrete Pavement (9" Thick) 975.4 SQYD $200.0000 $195,080.00 $222.0000 $216,538.80 $500.0000 $487,700.00
601-05-00100 Saw Cutting Portland Cement Concrete Pavement 1,550 INLF $7.0000 $10,850.00 $6.0000 $9,300.00 $1.3000 $2,015.00
602-05-02140 Full Depth Patching of Jointed Concrete Pavement (16.1 square yards to 48.0 square yards) (8-1/2" Thick) 250 SQYD $650.0000 $162,500.00 $330.0000 $82,500.00 $700.0000 $175,000.00
701-03-01022 Storm Drain Pipe (18" RCP/RPVCP) 8 LNFT $690.0000 $5,520.00 $900.0000 $7,200.00 $1,500.0000 $12,000.00
702-03-00500 Catch Basins (CB-06) 1 EACH $11,896.0000 $11,896.00 $12,000.0000 $12,000.00 $20,000.0000 $20,000.00
702-04-00210 Convert Catch Basins to Manholes 1 EACH $6,997.0000 $6,997.00 $9,000.0000 $9,000.00 $20,000.0000 $20,000.00
706-01-00100 Concrete Walk (4" Thick) 226.7 SQYD $177.5000 $40,239.25 $120.0000 $27,204.00 $200.0000 $45,340.00
706-03-00300 Incidental Concrete Paving (6" Thick) 24.9 SQYD $223.7500 $5,571.38 $180.0000 $4,482.00 $400.0000 $9,960.00
706-04-00110 Curb Ramps Type 6 193.2 SQYD $558.7500 $88,839.40 $420.0000 $81,144.00 $325.0000 $48,970.00
707-01-00100 Concrete Curb 1,476.6 LNFT $42.0000 $62,017.20 $48.0000 $70,876.80 $20.0000 $29,532.00
713-01-00100 Temporary Signs and Barricades 1 LUMP $150,000.0000 $150,000.00 $395,000.0000 $395,000.00 $550,000.0000 $550,000.00
713-02-00300 Temporary Pavement Markings (8" Width) 4,251 LNFT $0.6000 $2,550.60 $0.6000 $2,550.60 $0.5000 $2,125.50
713-02-00500 Temporary Pavement Markings (24" Width) 1,642 LNFT $1.2500 $2,052.50 $1.2000 $1,970.40 $1.0000 $1,642.00
713-03-01000 Temporary Pavement Markings (Broken Line) (4" Width) (4' Length) 1.212 MILE $5,000.0000 $6,060.00 $1,000.0000 $1,212.00 $5,000.0000 $6,060.00
713-03-02000 Temporary Pavement Markings (Broken Line) (4" Width) (10' Length) 0.418 MILE $2,500.0000 $1,045.00 $2,400.0000 $1,003.20 $2,000.0000 $836.00
713-04-01000 Temporary Pavement Markings (Solid Line) (4" Width) 1.044 MILE $2,500.0000 $2,610.00 $2,400.0000 $2,505.60 $2,000.0000 $2,088.00
713-05-00200 Temporary Pavement Legends & Symbols (Arrow - Double) 2 EACH $31.2500 $62.50 $30.0000 $60.00 $25.0000 $50.00
713-05-00220 Temporary Pavement Legends & Symbols (Arrow - Left Turn) 8 EACH $31.2500 $250.00 $30.0000 $240.00 $25.0000 $200.00
713-05-00230 Temporary Pavement Legends & Symbols (Arrow - Right Turn) 6 EACH $31.2500 $187.50 $30.0000 $180.00 $25.0000 $150.00
713-05-00300 Temporary Pavement Legends & Symbols (ONLY) 6 EACH $31.2500 $187.50 $30.0000 $180.00 $25.0000 $150.00
714-01-00100 Slab Sodding (Bermuda Grass) 500 SQYD $11.2500 $5,625.00 $10.8000 $5,400.00 $20.0000 $10,000.00
718-01-00100 Fertilizer 104 LB $3.7500 $390.00 $3.6000 $374.40 $3.0000 $312.00
726-01-00100 Bedding Material 2 CUYD $187.5000 $375.00 $1,200.0000 $2,400.00 $1,000.0000 $2,000.00
727-01-00100 Mobilization 1 LUMP $270,000.0000 $270,000.00 $395,000.0000 $395,000.00 $350,000.0000 $350,000.00
729-01-00100 Sign (Type A) 79.5 SQFT $50.0000 $3,975.00 $84.0000 $6,678.00 $25.0000 $1,987.50
729-01-00200 Mounting of Sign (Type A) 19 EACH $62.5000 $1,187.50 $570.0000 $10,830.00 $25.0000 $475.00
729-02-00100 Sign (Type B) 165.4 SQFT $68.7500 $11,371.25 $60.0000 $9,924.00 $35.0000 $5,789.00
729-19-00200 Dead End Road Installations (Type B) 1 EACH $3,437.5000 $3,437.50 $4,560.0000 $4,560.00 $3,500.0000 $3,500.00
729-22-00100 Perforated Square Tubing Post with 2-1/4" Anchor 15 EACH $187.5000 $2,812.50 $150.0000 $2,250.00 $200.0000 $3,000.00
731-02-00100 Reflectorized Raised Pavement Markers 84 EACH $12.5000 $1,050.00 $12.0000 $1,008.00 $10.0000 $840.00
732-01-02040 Plastic Pavement Striping (8" Width) (Thermoplastic 125 mil) 933 LNFT $6.2500 $5,831.25 $6.0000 $5,598.00 $5.0000 $4,665.00
732-01-02080 Plastic Pavement Striping (24" Width) (Thermoplastic 125 mil) 855 LNFT $37.5000 $32,062.50 $36.0000 $30,780.00 $30.0000 $25,650.00
732-02-02000 Plastic Pavement Striping (Solid Line) (4" Width) (Thermoplastic 90 mil) 0.522 MILE $25,000.0000 $13,050.00 $24,000.0000 $12,528.00 $20,000.0000 $10,440.00
732-03-02000 Plastic Pavement Striping (Broken Line) (4" Width) (Thermoplastic 90 mil) 0.209 MILE $7,500.0000 $1,567.50 $7,250.0000 $1,515.25 $6,000.0000 $1,254.00
732-03-02030 Plastic Pavement Striping (Dotted Line)(8" W)(2' L)(Thermo 90 mil) 0.169 MILE $25,000.0000 $4,225.00 $24,000.0000 $4,056.00 $20,000.0000 $3,380.00
732-04-01020 Plastic Pavement Legends and Symbols (Arrow - Straight) 1 EACH $625.0000 $625.00 $600.0000 $600.00 $500.0000 $500.00
732-04-01080 Plastic Pavement Legends and Symbols (Arrow - Left Turn) 4 EACH $625.0000 $2,500.00 $600.0000 $2,400.00 $500.0000 $2,000.00
732-04-01100 Plastic Pavement Legends and Symbols (Arrow - Right Turn) 3 EACH $625.0000 $1,875.00 $600.0000 $1,800.00 $500.0000 $1,500.00
732-04-15020 Plastic Pavement Legends and Symbols (ONLY) 3 EACH $1,000.0000 $3,000.00 $960.0000 $2,880.00 $800.0000 $2,400.00
732-05-00100 Removal of Existing Markings 0.205 MILE $62,500.0000 $12,812.50 $61,500.0000 $12,607.50 $50,000.0000 $10,250.00
736-01-00100 Trenching and Backfilling 670 LNFT $22.0000 $14,740.00 $15.0000 $10,050.00 $5.0000 $3,350.00
736-03-00100 Jacking or Boring for Conduit 810 LNFT $47.0000 $38,070.00 $51.6000 $41,796.00 $25.0000 $20,250.00
736-04-00001 Signal Pole (Pedestal Pole) 6 EACH $3,433.0000 $20,598.00 $4,200.0000 $25,200.00 $2,000.0000 $12,000.00
736-04-10300 Signal Pole (Single Mast Arm, 30ft) 2 EACH $24,075.0000 $48,150.00 $36,510.0000 $73,020.00 $16,750.0000 $33,500.00
736-04-10450 Signal Pole (Single Mast Arm, 45ft) 1 EACH $30,530.0000 $30,530.00 $42,100.0000 $42,100.00 $21,000.0000 $21,000.00
736-04-10500 Signal Pole (Single Mast Arm, 50ft) 1 EACH $33,821.0000 $33,821.00 $48,100.0000 $48,100.00 $23,500.0000 $23,500.00
736-04-10550 Signal Pole (Single Mast Arm, 55ft) 2 EACH $37,175.0000 $74,350.00 $53,030.0000 $106,060.00 $26,000.0000 $52,000.00
736-05-30000 Signal Heads (3 Section, 12 inch Led Lens, R, Y, G) 8 EACH $1,824.5000 $14,596.00 $1,320.0000 $10,560.00 $1,200.0000 $9,600.00
736-05-30004 Signal Heads (3 Section, 12 inch Led Lens, R, R, Y) 4 EACH $1,824.5000 $7,298.00 $1,320.0000 $5,280.00 $1,200.0000 $4,800.00
736-05-41200 Signal Heads (4 Section, 12 inch Led Lens, LT. R, LT. Y, FLT. Y, LT. G) 4 EACH $2,170.0000 $8,680.00 $1,800.0000 $7,200.00 $1,600.0000 $6,400.00
736-06-00100 Signal Service 1 EACH $7,005.0000 $7,005.00 $5,000.0000 $5,000.00 $1,500.0000 $1,500.00
736-06-00500 Signal Service Pedestal Disconnect 1 EACH $3,386.5000 $3,386.50 $6,060.0000 $6,060.00 $2,500.0000 $2,500.00
736-08-00102 Signal Controller (980 ATC, Type 2)(Furnish & Install) 1 EACH $7,003.0000 $7,003.00 $10,920.0000 $10,920.00 $5,000.0000 $5,000.00
736-10-00200 Underground Junction Box (Type E) 3 EACH $1,860.0000 $5,580.00 $2,700.0000 $8,100.00 $1,000.0000 $3,000.00
736-10-00300 Underground Junction Box (Type F) 11 EACH $1,953.0000 $21,483.00 $3,090.0000 $33,990.00 $1,200.0000 $13,200.00
736-10-00400 Underground Junction Box (Type G) 1 EACH $2,772.0000 $2,772.00 $5,150.0000 $5,150.00 $2,000.0000 $2,000.00
736-11-00100 Conduit (1" HDPE, Schedule 80) 20 LNFT $7.2000 $144.00 $7.2000 $144.00 $5.0000 $100.00
736-11-00200 Conduit (2" HDPE, Schedule 80) 450 LNFT $9.2500 $4,162.50 $10.2000 $4,590.00 $7.0000 $3,150.00
736-11-00300 Conduit (3" HDPE, Schedule 80) 1,450 LNFT $13.2500 $19,212.50 $12.0000 $17,400.00 $8.0000 $11,600.00
736-12-02014 Conductor (2c, #14 awg) 2,205 LNFT $3.8000 $8,379.00 $6.5000 $14,332.50 $2.5000 $5,512.50
736-12-03006 Conductor (3c, 6 gauge / #6 awg) 475 LNFT $11.3500 $5,391.25 $10.7000 $5,082.50 $5.0000 $2,375.00
736-12-06014 Conductor (6c, #14 awg) 3,210 LNFT $5.2000 $16,692.00 $5.9000 $18,939.00 $3.5000 $11,235.00
736-12-10014 Conductor (10c, #14 awg) 2,230 LNFT $7.0000 $15,610.00 $8.4000 $18,732.00 $4.0000 $8,920.00
736-15-02400 Signal Support (Foundation, 24 inch Minimum Diameter) 6 EACH $3,864.0000 $23,184.00 $7,800.0000 $46,800.00 $3,000.0000 $18,000.00
736-15-03600 Signal Support (Foundation, 36 inch Minimum Diameter) 6 EACH $14,153.0000 $84,918.00 $10,440.0000 $62,640.00 $7,000.0000 $42,000.00
736-21-00000 LED Pedestrian Countdown Signal Head 6 EACH $1,636.0000 $9,816.00 $1,880.0000 $11,280.00 $1,000.0000 $6,000.00
740-01-00100 Construction Layout 1 LUMP $65,000.0000 $65,000.00 $53,000.0000 $53,000.00 $250,000.0000 $250,000.00
NS-500-00360 Saw Cutting Asphalt Concrete Pavement Over Portland Cement Concrete Composite Pavement 20,263 INLF $1.6000 $32,420.80 $3.6000 $72,946.80 $1.3000 $26,341.90
NS-736-00125 Video Radar Vehicle Tracking and Detection System (Cabinet Components) 1 EACH $32,426.0000 $32,426.00 $33,390.0000 $33,390.00 $25,000.0000 $25,000.00
NS-736-00126 Video Radar Vehicle Tracking and Detection System (Sensor Unit) 4 EACH $13,097.0000 $52,388.00 $14,610.0000 $58,440.00 $11,000.0000 $44,000.00
NS-736-00127 Video Radar Vehicle Tracking and Detection System (Connection Conductors) 1,155 LF $4.8000 $5,544.00 $4.3500 $5,024.25 $3.0000 $3,465.00
NS-736-00128 Video Radar Vehicle Tracking and Detection System (Training) 1 LUMP $5,302.0000 $5,302.00 $7,200.0000 $7,200.00 $5,000.0000 $5,000.00
NS-736-00131 TS-2 Traffic Signal Cabinet (Pole Mounted) 1 EACH $31,596.0000 $31,596.00 $36,960.0000 $36,960.00 $21,000.0000 $21,000.00
NS-736-00135 2-Wire Accessible Pedestrian Pushbutton Detectors 10 EACH $1,639.7000 $16,397.00 $2,750.0000 $27,500.00 $1,200.0000 $12,000.00
NS-736-00136 2-Wire Accessible Pedestrian Pushbutton Cabinet Control 2 EACH $5,823.0000 $11,646.00 $6,960.0000 $13,920.00 $4,500.0000 $9,000.00
NS-736-00211 Rectangular Rapid Flashing Beacon Assembly Pair (Single Sided) (SOLAR POWER) 4 EACH $33,374.0000 $133,496.00 $27,300.0000 $109,200.00 $28,000.0000 $112,000.00