Mississippi DOT · Bid Tabulation
Contract 102372302
Bridge Replacement on SR 427 (Bridge No. 4.4) between SR 488 & SR 16
- County
- Leake
- District
- 5
- Letting
- May 27, 2026
- Bidders
- 8
Apparent low bid
Joe McGee Construction Company, Inc.
$3,133,332.92
Other bidders
Cook & Son, LLC
$3,148,856.65
Chris Albritton Construction Company, Inc.
$3,363,802.91
Ste-Bil Grading Inc.
$3,516,064.87
Cotton Creek Transport, Inc.
$3,852,794.19
Hemphill Construction Company, Inc.
$4,054,915.70
Key, LLC
$4,487,710.90
N. L. Carson Construction Company, Inc.
$4,590,160.81
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | Joe McGee Construction Company, Inc. $3,133,332.92 | Cook & Son, LLC $3,148,856.65 | Chris Albritton Construction Company, Inc. $3,363,802.91 | Ste-Bil Grading Inc. $3,516,064.87 | Cotton Creek Transport, Inc. $3,852,794.19 | Hemphill Construction Company, Inc. $4,054,915.70 | Key, LLC $4,487,710.90 | N. L. Carson Construction Company, Inc. $4,590,160.81 | ||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201-A001 | Clearing and Grubbing | 1 | LS | $135,000.0000 | $135,000.00 | $25,000.0000 | $25,000.00 | $137,500.0000 | $137,500.00 | $75,000.0000 | $75,000.00 | $250,000.0000 | $250,000.00 | $47,500.0000 | $47,500.00 | $75,000.0000 | $75,000.00 | $200,000.0000 | $200,000.00 |
| 202-B004 | Removal of Asphalt Driveways, All Depths | 47 | SY | $11.3500 | $533.45 | $15.0000 | $705.00 | $10.6200 | $499.14 | $25.0000 | $1,175.00 | $18.0000 | $846.00 | $9.1000 | $427.70 | $12.0000 | $564.00 | $40.0000 | $1,880.00 |
| 202-B007 | Removal of Asphalt Pavement, All Depths | 3,195 | SY | $13.8500 | $44,250.75 | $10.0000 | $31,950.00 | $10.6200 | $33,930.90 | $25.0000 | $79,875.00 | $8.0000 | $25,560.00 | $9.1000 | $29,074.50 | $12.0000 | $38,340.00 | $15.0000 | $47,925.00 |
| 202-B023 | Removal of Bridge | 1 | EA | $100,000.0000 | $100,000.00 | $50,000.0000 | $50,000.00 | $88,500.0000 | $88,500.00 | $25,000.0000 | $25,000.00 | $200,000.0000 | $200,000.00 | $127,550.0000 | $127,550.00 | $75,000.0000 | $75,000.00 | $190,000.0000 | $190,000.00 |
| 202-B125 | Removal of Fence Gate, All Types, All Sizes | 1 | EA | $200.0000 | $200.00 | $250.0000 | $250.00 | $1,180.0000 | $1,180.00 | $500.0000 | $500.00 | $300.0000 | $300.00 | $950.0000 | $950.00 | $275.0000 | $275.00 | $5,000.0000 | $5,000.00 |
| 202-B126 | Removal of Fence, All Types | 927 | LF | $1.8700 | $1,733.49 | $5.0000 | $4,635.00 | $2.3600 | $2,187.72 | $10.0000 | $9,270.00 | $11.0000 | $10,197.00 | $10.0000 | $9,270.00 | $9.0000 | $8,343.00 | $10.0000 | $9,270.00 |
| 202-B158 | Removal of Guard Rail, Including Rails, Posts and Terminal Ends | 274 | LF | $4.5000 | $1,233.00 | $4.0000 | $1,096.00 | $4.7200 | $1,293.28 | $10.0000 | $2,740.00 | $4.0000 | $1,096.00 | $4.5000 | $1,233.00 | $4.5000 | $1,233.00 | $5.0000 | $1,370.00 |
| 202-B215 | Removal of Sign Including Post & Footing | 4 | EA | $73.2500 | $293.00 | $65.0000 | $260.00 | $59.0000 | $236.00 | $100.0000 | $400.00 | $65.0000 | $260.00 | $75.0000 | $300.00 | $75.0000 | $300.00 | $70.0000 | $280.00 |
| 203-A001 | Unclassified Excavation, FM, AH | 1,359 | CY | $8.8500 | $12,027.15 | $11.3200 | $15,383.88 | $11.8000 | $16,036.20 | $20.0000 | $27,180.00 | $14.0000 | $19,026.00 | $13.6500 | $18,550.35 | $17.2500 | $23,442.75 | $19.0000 | $25,821.00 |
| 203-EX010 | Borrow Excavation, AH, FME, Class B17 | 6,915 | CY | $13.8000 | $95,427.00 | $16.0200 | $110,778.30 | $20.6500 | $142,794.75 | $25.0000 | $172,875.00 | $23.0000 | $159,045.00 | $26.5000 | $183,247.50 | $34.5000 | $238,567.50 | $35.0000 | $242,025.00 |
| 203-G001 | Excess Excavation, FM, AH | 1,781 | CY | $9.2500 | $16,474.25 | $9.0000 | $16,029.00 | $14.1600 | $25,218.96 | $25.0000 | $44,525.00 | $14.0000 | $24,934.00 | $20.5000 | $36,510.50 | $15.0000 | $26,715.00 | $12.0000 | $21,372.00 |
| 209-A005 | Geotextile Stabilization, Type V, Non-Woven | 4,329 | SY | $3.3000 | $14,285.70 | $2.5000 | $10,822.50 | $2.3600 | $10,216.44 | $4.0000 | $17,316.00 | $3.4000 | $14,718.60 | $3.2000 | $13,852.80 | $5.0000 | $21,645.00 | $3.5000 | $15,151.50 |
| 211-B001 | Topsoil for Slope Treatment, Contractor Furnished | 1,367 | CY | $0.0100 | $13.67 | $1.0000 | $1,367.00 | $17.7000 | $24,195.90 | $0.0100 | $13.67 | $0.1200 | $164.04 | $10.0000 | $13,670.00 | $1.0000 | $1,367.00 | $25.0000 | $34,175.00 |
| 213-C001 | Superphosphate | 2 | TON | $1,145.0000 | $2,290.00 | $1,000.0000 | $2,000.00 | $1,180.0000 | $2,360.00 | $800.0000 | $1,600.00 | $1,200.0000 | $2,400.00 | $1,750.0000 | $3,500.00 | $1,080.0000 | $2,160.00 | $1,050.0000 | $2,100.00 |
| 216-A001 | Solid Sodding | 30 | SY | $18.1000 | $543.00 | $20.0000 | $600.00 | $23.6000 | $708.00 | $8.0000 | $240.00 | $15.0000 | $450.00 | $23.2300 | $696.90 | $22.0000 | $660.00 | $21.0000 | $630.00 |
| 219-A001 | Watering | 1 | KGAL | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 |
| 220-A001 | Insect Pest Control | 4 | ACRE | $30.0000 | $120.00 | $30.0000 | $120.00 | $30.0000 | $120.00 | $30.0000 | $120.00 | $30.0000 | $120.00 | $30.0000 | $120.00 | $30.0000 | $120.00 | $30.0000 | $120.00 |
| 221-A001 | Concrete Paved Ditch | 6 | CY | $1,000.0000 | $6,000.00 | $1,185.0000 | $7,110.00 | $1,947.0000 | $11,682.00 | $2,000.0000 | $12,000.00 | $2,000.0000 | $12,000.00 | $1,750.0000 | $10,500.00 | $2,160.0000 | $12,960.00 | $1,905.0000 | $11,430.00 |
| 223-A001 | Mowing | 7 | ACRE | $70.0000 | $490.00 | $70.0000 | $490.00 | $70.0000 | $490.00 | $70.0000 | $490.00 | $70.0000 | $490.00 | $70.0000 | $490.00 | $70.0000 | $490.00 | $70.0000 | $490.00 |
| 225-A001 | Grassing | 4 | ACRE | $1,810.0000 | $7,240.00 | $1,100.0000 | $4,400.00 | $1,298.0000 | $5,192.00 | $2,000.0000 | $8,000.00 | $1,500.0000 | $6,000.00 | $4,050.0000 | $16,200.00 | $1,190.0000 | $4,760.00 | $1,155.0000 | $4,620.00 |
| 225-B001 | Agricultural Limestone | 2 | TON | $420.0000 | $840.00 | $100.0000 | $200.00 | $118.0000 | $236.00 | $300.0000 | $600.00 | $350.0000 | $700.00 | $1,750.0000 | $3,500.00 | $110.0000 | $220.00 | $105.0000 | $210.00 |
| 225-C001 | Mulch, Vegetative Mulch | 7 | TON | $300.0000 | $2,100.00 | $200.0000 | $1,400.00 | $236.0000 | $1,652.00 | $350.0000 | $2,450.00 | $250.0000 | $1,750.00 | $550.0000 | $3,850.00 | $220.0000 | $1,540.00 | $210.0000 | $1,470.00 |
| 226-A001 | Temporary Grassing | 4 | ACRE | $1,205.0000 | $4,820.00 | $900.0000 | $3,600.00 | $1,062.0000 | $4,248.00 | $2,000.0000 | $8,000.00 | $1,000.0000 | $4,000.00 | $1,750.0000 | $7,000.00 | $1,000.0000 | $4,000.00 | $945.0000 | $3,780.00 |
| 237-A002 | Wattles, 20" | 400 | LF | $10.0000 | $4,000.00 | $6.0000 | $2,400.00 | $5.9000 | $2,360.00 | $8.0000 | $3,200.00 | $6.0000 | $2,400.00 | $23.2300 | $9,292.00 | $6.5000 | $2,600.00 | $6.3000 | $2,520.00 |
| 239-A001 | Temporary Slope Drains | 700 | LF | $15.0000 | $10,500.00 | $10.0000 | $7,000.00 | $41.3000 | $28,910.00 | $1.0000 | $700.00 | $8.2000 | $5,740.00 | $55.0000 | $38,500.00 | $18.0000 | $12,600.00 | $13.0000 | $9,100.00 |
| 246-B002 | Rockbags | 100 | LF | $30.0000 | $3,000.00 | $15.0000 | $1,500.00 | $14.1600 | $1,416.00 | $1.0000 | $100.00 | $5.0000 | $500.00 | $55.0000 | $5,500.00 | $17.5000 | $1,750.00 | $15.7500 | $1,575.00 |
| 249-A001 | Riprap for Erosion Control | 1,000 | TON | $84.1500 | $84,150.00 | $120.0000 | $120,000.00 | $114.4600 | $114,460.00 | $125.0000 | $125,000.00 | $116.7000 | $116,700.00 | $125.0000 | $125,000.00 | $138.0000 | $138,000.00 | $95.0000 | $95,000.00 |
| 304-D002 | Granular Material, Crushed Stone | 86 | TON | $76.3500 | $6,566.10 | $65.0000 | $5,590.00 | $112.1000 | $9,640.60 | $92.0000 | $7,912.00 | $100.0000 | $8,600.00 | $90.0000 | $7,740.00 | $100.0000 | $8,600.00 | $105.0000 | $9,030.00 |
| 304-F002 | Size 610 Crushed Stone Base | 1,163 | TON | $77.5000 | $90,132.50 | $65.0000 | $75,595.00 | $99.1200 | $115,276.56 | $92.0000 | $106,996.00 | - | - | $90.0000 | $104,670.00 | - | - | $87.0000 | $101,181.00 |
| 304-F003 | Size 825B Crushed Stone Base | 1,163 | TON | - | - | - | - | - | - | - | - | $126.0000 | $146,538.00 | - | - | $98.0000 | $113,974.00 | - | - |
| 406-D001 | Fine Milling of Bituminous Pavement, All Depths | 578 | SY | $18.6500 | $10,779.70 | $31.7500 | $18,351.50 | $6.2700 | $3,624.06 | $22.0000 | $12,716.00 | $18.9000 | $10,924.20 | $20.0000 | $11,560.00 | $33.0000 | $19,074.00 | $25.9500 | $14,999.10 |
| 423-A001 | Rumble Strips, Ground In | 1 | MI | $3,945.0000 | $3,945.00 | $300.0000 | $300.00 | $354.0000 | $354.00 | $3,800.0000 | $3,800.00 | $300.0000 | $300.00 | $4,500.0000 | $4,500.00 | $325.0000 | $325.00 | $315.0000 | $315.00 |
| 501-K001 | Transverse Grooving | 826 | SY | $2.8000 | $2,312.80 | $2.5000 | $2,065.00 | $2.9500 | $2,436.70 | $5.0000 | $4,130.00 | $2.5000 | $2,065.00 | $7.2500 | $5,988.50 | $2.7250 | $2,231.15 | $2.8900 | $2,387.14 |
| 603-ALT003 | 18" Type A Alternate Pipe | 48 | LF | $51.0000 | $2,448.00 | $75.0000 | $3,600.00 | $43.6600 | $2,095.68 | $100.0000 | $4,800.00 | $120.0000 | $5,760.00 | $72.5000 | $3,480.00 | $125.0000 | $6,000.00 | $60.0000 | $2,880.00 |
| 605-AA001 | Geotextile for Subsurface Drainage, Type III | 38 | SY | $7.0000 | $266.00 | $2.5000 | $95.00 | $2.1800 | $82.84 | $4.0000 | $152.00 | $63.0000 | $2,394.00 | $2.9000 | $110.20 | $5.0000 | $190.00 | $10.0000 | $380.00 |
| 605-O002 | 4" Perforated Sewer Pipe for Underdrains, SDR 23.5 | 67 | LF | $18.0000 | $1,206.00 | $35.0000 | $2,345.00 | $23.6000 | $1,581.20 | $30.0000 | $2,010.00 | $65.0000 | $4,355.00 | $25.0000 | $1,675.00 | $30.0000 | $2,010.00 | $25.0000 | $1,675.00 |
| 605-P002 | 4" Non-perforated Sewer Pipe for Underdrains, SDR 23.5 | 5 | LF | $50.0000 | $250.00 | $35.0000 | $175.00 | $23.6000 | $118.00 | $30.0000 | $150.00 | $85.0000 | $425.00 | $25.0000 | $125.00 | $30.0000 | $150.00 | $25.0000 | $125.00 |
| 605-W001 | Filter Material for Combination Storm Drain and/or Underdrains,Type A, FM | 3 | CY | $137.0000 | $411.00 | $300.0000 | $900.00 | $118.0000 | $354.00 | $1,000.0000 | $3,000.00 | $245.0000 | $735.00 | $250.0000 | $750.00 | $340.0000 | $1,020.00 | $250.0000 | $750.00 |
| 605-W002 | Filter Material for Combination Storm Drain and/or Underdrains,Type B, FM | 37 | CY | $97.8500 | $3,620.45 | $100.0000 | $3,700.00 | $43.6600 | $1,615.42 | $100.0000 | $3,700.00 | - | - | - | - | - | - | $170.0000 | $6,290.00 |
| 605-W003 | Filter Material for Combination Storm Drain and/or Underdrains,Type C, FM | 37 | CY | - | - | - | - | - | - | - | - | $170.0000 | $6,290.00 | $250.0000 | $9,250.00 | $115.0000 | $4,255.00 | - | - |
| 606-B001 | Guard Rail, Class A, Type 1 | 188 | LF | $31.5500 | $5,931.40 | $28.0000 | $5,264.00 | $33.0400 | $6,211.52 | $31.0000 | $5,828.00 | $28.0000 | $5,264.00 | $32.5000 | $6,110.00 | $30.2500 | $5,687.00 | $30.4500 | $5,724.60 |
| 606-D022 | Guard Rail, Bridge End Section, Type I | 4 | EA | $3,325.0000 | $13,300.00 | $2,950.0000 | $11,800.00 | $3,481.0000 | $13,924.00 | $3,500.0000 | $14,000.00 | $2,950.0000 | $11,800.00 | $3,400.0000 | $13,600.00 | $3,185.0000 | $12,740.00 | $3,206.7000 | $12,826.80 |
| 606-E001 | Guard Rail, Terminal End Section | 4 | EA | $3,945.0000 | $15,780.00 | $3,500.0000 | $14,000.00 | $4,130.0000 | $16,520.00 | $3,850.0000 | $15,400.00 | $3,500.0000 | $14,000.00 | $4,000.0000 | $16,000.00 | $3,775.0000 | $15,100.00 | $3,804.1500 | $15,216.60 |
| 615-A024 | Concrete Bridge End Barrier, 37.5" | 40 | LF | $91.8500 | $3,674.00 | $79.0000 | $3,160.00 | $93.2200 | $3,728.80 | $95.0000 | $3,800.00 | $79.0000 | $3,160.00 | $90.0000 | $3,600.00 | $100.0000 | $4,000.00 | $85.9500 | $3,438.00 |
| 617-A001 | Right-of-Way Marker | 28 | EA | $590.0000 | $16,520.00 | $250.0000 | $7,000.00 | $448.4000 | $12,555.20 | $450.0000 | $12,600.00 | $500.0000 | $14,000.00 | $400.0000 | $11,200.00 | $675.0000 | $18,900.00 | $393.7500 | $11,025.00 |
| 619-A1003 | Temporary Traffic Stripe, Continuous White, Paint | 2,944 | LF | $2.8200 | $8,302.08 | $2.5000 | $7,360.00 | $2.9500 | $8,684.80 | $2.5000 | $7,360.00 | $2.5000 | $7,360.00 | $2.9000 | $8,537.60 | $2.7000 | $7,948.80 | $2.6300 | $7,742.72 |
| 619-A2003 | Temporary Traffic Stripe, Continuous Yellow, Paint | 2,944 | LF | $2.8200 | $8,302.08 | $2.5000 | $7,360.00 | $2.9500 | $8,684.80 | $2.5000 | $7,360.00 | $2.5000 | $7,360.00 | $2.9000 | $8,537.60 | $2.7000 | $7,948.80 | $2.6300 | $7,742.72 |
| 619-D1001 | Standard Roadside Construction Signs, Less than 10 Square Feet | 263 | SF | $9.0000 | $2,367.00 | $8.0000 | $2,104.00 | $9.4400 | $2,482.72 | $8.0000 | $2,104.00 | $8.0000 | $2,104.00 | $9.3000 | $2,445.90 | $8.7500 | $2,301.25 | $8.4000 | $2,209.20 |
| 619-D2001 | Standard Roadside Construction Signs, 10 Square Feet or More | 346 | SF | $9.0000 | $3,114.00 | $8.0000 | $2,768.00 | $9.4400 | $3,266.24 | $8.0000 | $2,768.00 | $8.0000 | $2,768.00 | $9.3000 | $3,217.80 | $8.7500 | $3,027.50 | $8.4000 | $2,906.40 |
| 619-G4001 | Barricades, Type III, Double Faced | 84 | LF | $25.9000 | $2,175.60 | $23.0000 | $1,932.00 | $18.8800 | $1,585.92 | $23.0000 | $1,932.00 | $23.0000 | $1,932.00 | $26.7500 | $2,247.00 | $25.0000 | $2,100.00 | $24.1500 | $2,028.60 |
| 619-G4005 | Barricades, Type III, Single Faced | 48 | LF | $23.6500 | $1,135.20 | $21.0000 | $1,008.00 | $16.5200 | $792.96 | $21.0000 | $1,008.00 | $21.0000 | $1,008.00 | $24.5000 | $1,176.00 | $23.0000 | $1,104.00 | $22.0500 | $1,058.40 |
| 619-G7001 | Warning Lights, Type "B" | 12 | EA | $152.0000 | $1,824.00 | $135.0000 | $1,620.00 | $159.3000 | $1,911.60 | $150.0000 | $1,800.00 | $135.0000 | $1,620.00 | $155.0000 | $1,860.00 | $145.0000 | $1,740.00 | $141.7500 | $1,701.00 |
| 620-A001 | Mobilization | 1 | LS | $150,000.0000 | $150,000.00 | $549,113.6200 | $549,113.62 | $254,800.0000 | $254,800.00 | $250,000.0000 | $250,000.00 | $350,000.0000 | $350,000.00 | $544,250.0000 | $544,250.00 | $450,000.0000 | $450,000.00 | $443,849.0500 | $443,849.05 |
| 630-A003 | Standard Roadside Signs, Sheet Aluminum, 0.125" Thickness | 18 | SF | $21.4000 | $385.20 | $19.0000 | $342.00 | $22.4200 | $403.56 | $22.0000 | $396.00 | $19.0000 | $342.00 | $22.0000 | $396.00 | $21.0000 | $378.00 | $21.0000 | $378.00 |
| 630-C005 | Square Tube Posts, 2.0 lb/ft | 30 | LF | $14.6500 | $439.50 | $13.0000 | $390.00 | $15.3400 | $460.20 | $15.0000 | $450.00 | $13.0000 | $390.00 | $15.0000 | $450.00 | $14.0000 | $420.00 | $14.1800 | $425.40 |
| 630-F006 | Delineators, Guard Rail, White | 18 | EA | $29.3000 | $527.40 | $26.0000 | $468.00 | $27.1400 | $488.52 | $30.0000 | $540.00 | $26.0000 | $468.00 | $30.0000 | $540.00 | $28.2500 | $508.50 | $28.3500 | $510.30 |
| 630-G005 | Type 3 Object Markers, OM-3R or OM-3L, Post Mounted | 4 | EA | $95.7500 | $383.00 | $85.0000 | $340.00 | $100.3000 | $401.20 | $100.0000 | $400.00 | $85.0000 | $340.00 | $100.0000 | $400.00 | $92.0000 | $368.00 | $92.4000 | $369.60 |
| 699-A001 | Roadway Construction Stakes | 1 | LS | $50,000.0000 | $50,000.00 | $1.0000 | $1.00 | $29,500.0000 | $29,500.00 | $40,000.0000 | $40,000.00 | $75,000.0000 | $75,000.00 | $17,500.0000 | $17,500.00 | $100,000.0000 | $100,000.00 | $59,600.0000 | $59,600.00 |
| 803-D005 | HP 14 x 117 Steel Piling | 3,670 | LF | $144.3500 | $529,764.50 | $128.3700 | $471,117.90 | $137.6100 | $505,028.70 | $140.0000 | $513,800.00 | $120.0000 | $440,400.00 | $160.0000 | $587,200.00 | $120.0000 | $440,400.00 | $175.0000 | $642,250.00 |
| 804-C192 | 100' Prestressed Concrete Beam, Type FIB-36 | 1,492 | LF | $306.7500 | $457,671.00 | $357.0000 | $532,644.00 | $337.4800 | $503,520.16 | $400.0000 | $596,800.00 | $350.0000 | $522,200.00 | $350.0000 | $522,200.00 | $437.0000 | $652,004.00 | $416.0000 | $620,672.00 |
| 805-A001 | Reinforcement | 80,340 | LBS | $1.5000 | $120,510.00 | $0.8000 | $64,272.00 | $1.4300 | $114,886.20 | $1.6800 | $134,971.20 | $1.6000 | $128,544.00 | $1.7900 | $143,808.60 | $1.9500 | $156,663.00 | $1.8900 | $151,842.60 |
| 805-C001 | Reinforcement, Corrosion Resistant | 2,236 | LBS | $3.2500 | $7,267.00 | $0.8000 | $1,788.80 | $2.6600 | $5,947.76 | $4.0000 | $8,944.00 | $3.1000 | $6,931.60 | $4.9900 | $11,157.64 | $3.4500 | $7,714.20 | $3.1500 | $7,043.40 |
| 813-A004 | Concrete Railing, 36" | 605 | LF | $91.4000 | $55,297.00 | $79.0000 | $47,795.00 | $93.2200 | $56,398.10 | $95.0000 | $57,475.00 | $79.0000 | $47,795.00 | $90.0000 | $54,450.00 | $100.0000 | $60,500.00 | $85.9500 | $51,999.75 |
| 815-A007 | Loose Riprap, Size 300 | 1,465 | TON | $84.4750 | $123,657.40 | $110.0000 | $148,020.00 | $108.5600 | $151,293.70 | $105.0000 | $153,825.00 | $116.7000 | $170,965.50 | $92.5000 | $135,512.50 | $138.0000 | $202,170.00 | $115.0000 | $168,475.00 |
| 815-E001 | Geotextile under Riprap | 1,344 | SY | $3.8500 | $5,352.90 | $5.0000 | $6,720.00 | $2.3600 | $3,171.84 | $4.0000 | $5,376.00 | $3.4000 | $4,569.60 | $2.9000 | $3,897.60 | $5.0000 | $6,720.00 | $3.2500 | $4,368.00 |
| 815-F002 | Sediment Control Stone | 21 | TON | $87.3000 | $1,833.30 | $150.0000 | $3,150.00 | $112.1000 | $2,354.10 | $150.0000 | $3,150.00 | $113.0000 | $2,373.00 | $235.0000 | $4,935.00 | $180.0000 | $3,780.00 | $175.0000 | $3,675.00 |
| 907-234-A001 | Temporary Silt Fence | 3,000 | LF | $3.9500 | $11,850.00 | $3.5000 | $10,500.00 | $3.5400 | $10,620.00 | $5.0000 | $15,000.00 | $2.7500 | $8,250.00 | $5.5000 | $16,500.00 | $3.8000 | $11,400.00 | $5.6800 | $17,040.00 |
| 907-234-C001 | Super Silt Fence | 550 | LF | $15.3000 | $8,415.00 | $17.5000 | $9,625.00 | $11.8000 | $6,490.00 | $25.0000 | $13,750.00 | $12.0000 | $6,600.00 | $15.0000 | $8,250.00 | $19.0000 | $10,450.00 | $21.3800 | $11,759.00 |
| 907-234-F001 | Turbidity Barrier | 125 | LF | $30.0000 | $3,750.00 | $100.0000 | $12,500.00 | $11.9800 | $1,497.50 | $100.0000 | $12,500.00 | $16.5000 | $2,062.50 | $55.0000 | $6,875.00 | $25.0000 | $3,125.00 | $25.0000 | $3,125.00 |
| 907-403-A003 | 12.5-mm, ST, Asphalt Pavement | 618 | TON | $192.0000 | $118,656.00 | $157.5100 | $97,341.18 | $168.5900 | $104,188.62 | $200.0000 | $123,600.00 | $191.1000 | $118,099.80 | $215.0000 | $132,870.00 | $200.0000 | $123,600.00 | $200.5500 | $123,939.90 |
| 907-403-A015 | 9.5-mm, ST, Asphalt Pavement | 286 | TON | $203.0000 | $58,058.00 | $164.7300 | $47,112.78 | $181.7600 | $51,983.36 | $210.0000 | $60,060.00 | $201.6000 | $57,657.60 | $225.0000 | $64,350.00 | $211.0000 | $60,346.00 | $211.0500 | $60,360.30 |
| 907-403-B012 | 9.5-mm, ST, Asphalt Pavement, Leveling | 28 | TON | $435.0000 | $12,180.00 | $364.1000 | $10,194.80 | $403.0800 | $11,286.24 | $250.0000 | $7,000.00 | $225.7500 | $6,321.00 | $250.0000 | $7,000.00 | $236.0000 | $6,608.00 | $236.2500 | $6,615.00 |
| 907-403-C003 | 19-mm, ST, Asphalt Pavement, Trench Widening | 27 | TON | $290.0000 | $7,830.00 | $358.7700 | $9,686.79 | $398.3400 | $10,755.18 | $300.0000 | $8,100.00 | $288.7500 | $7,796.25 | $315.0000 | $8,505.00 | $301.0000 | $8,127.00 | $302.4000 | $8,164.80 |
| 907-407-A001 | Asphalt for Tack Coat | 482 | GAL | $5.6500 | $2,723.30 | $3.0000 | $1,446.00 | $3.6600 | $1,764.12 | $5.0000 | $2,410.00 | $4.7500 | $2,289.50 | $5.2500 | $2,530.50 | $5.0000 | $2,410.00 | $4.9900 | $2,405.18 |
| 907-413-E001 | Sawing and Sealing Transverse Joints in Asphalt Pavement | 67 | LF | $9.0000 | $603.00 | $10.0000 | $670.00 | $9.4400 | $632.48 | $46.0000 | $3,082.00 | $8.0000 | $536.00 | $55.0000 | $3,685.00 | $8.7500 | $586.25 | $15.7500 | $1,055.25 |
| 907-502-A001 | Reinforced Cement Concrete Bridge End Pavement | 124 | SY | $420.0000 | $52,080.00 | $200.0000 | $24,800.00 | $473.1800 | $58,674.32 | $400.0000 | $49,600.00 | $401.0000 | $49,724.00 | $465.0000 | $57,660.00 | $435.0000 | $53,940.00 | $521.0000 | $64,604.00 |
| 907-618-A001 | Maintenance of Traffic | 1 | LS | $14,750.0000 | $14,750.00 | $3,500.0000 | $3,500.00 | $4,130.0000 | $4,130.00 | $4,500.0000 | $4,500.00 | $50,000.0000 | $50,000.00 | $19,000.0000 | $19,000.00 | $50,000.0000 | $50,000.00 | $63,675.0000 | $63,675.00 |
| 907-619-E3001 | Changeable Message Sign | 2 | EA | $6,100.0000 | $12,200.00 | $5,400.0000 | $10,800.00 | $6,372.0000 | $12,744.00 | $6,000.0000 | $12,000.00 | $5,400.0000 | $10,800.00 | $6,250.0000 | $12,500.00 | $5,900.0000 | $11,800.00 | $5,670.0000 | $11,340.00 |
| 907-626-B005 | 6" Thermoplastic Traffic Stripe, Continuous White | 2,944 | LF | $5.6500 | $16,633.60 | $5.0000 | $14,720.00 | $5.9000 | $17,369.60 | $5.0000 | $14,720.00 | $5.0000 | $14,720.00 | $5.7500 | $16,928.00 | $5.4000 | $15,897.60 | $5.2500 | $15,456.00 |
| 907-626-E006 | 6" Thermoplastic Traffic Stripe, Continuous Yellow | 2,944 | LF | $5.6500 | $16,633.60 | $5.0000 | $14,720.00 | $5.9000 | $17,369.60 | $5.0000 | $14,720.00 | $5.0000 | $14,720.00 | $5.7500 | $16,928.00 | $5.4000 | $15,897.60 | $5.2500 | $15,456.00 |
| 907-627-J001 | Two-Way Clear Reflective High Performance Raised Markers | 58 | EA | $22.5500 | $1,307.90 | $20.0000 | $1,160.00 | $23.6000 | $1,368.80 | $20.0000 | $1,160.00 | $20.0000 | $1,160.00 | $23.2300 | $1,347.34 | $22.0000 | $1,276.00 | $21.0000 | $1,218.00 |
| 907-627-L001 | Two-Way Yellow Reflective High Performance Raised Markers | 29 | EA | $22.5500 | $653.95 | $20.0000 | $580.00 | $23.6000 | $684.40 | $20.0000 | $580.00 | $20.0000 | $580.00 | $23.2300 | $673.67 | $22.0000 | $638.00 | $21.0000 | $609.00 |
| 907-803-I003 | PDA Test Pile, HP Steel Pile | 2 | EA | $19,000.0000 | $38,000.00 | $13,039.3000 | $26,078.60 | $25,490.0100 | $50,980.02 | $25,000.0000 | $50,000.00 | $40,000.0000 | $80,000.00 | $25,000.0000 | $50,000.00 | $45,000.0000 | $90,000.00 | $20,000.0000 | $40,000.00 |
| 907-803-J001 | Pile Restrike | 2 | EA | $1,500.0000 | $3,000.00 | $5,000.0000 | $10,000.00 | $7,670.0000 | $15,340.00 | $500.0000 | $1,000.00 | $1,500.0000 | $3,000.00 | $2,750.0000 | $5,500.00 | $500.0000 | $1,000.00 | $2,000.0000 | $4,000.00 |
| 907-804-A001 | Bridge Concrete, Class BDX | 255 | CY | $1,245.0000 | $317,475.00 | $1,100.0000 | $280,500.00 | $1,280.4800 | $326,522.40 | $1,450.0000 | $369,750.00 | $1,500.0000 | $382,500.00 | $1,750.0000 | $446,250.00 | $2,775.0000 | $707,625.00 | $2,327.0000 | $593,385.00 |
| 907-804-A002 | Bridge Concrete, Class AA | 109 | CY | $1,630.0000 | $177,670.00 | $1,250.0000 | $136,250.00 | $1,405.8800 | $153,240.92 | $1,300.0000 | $141,700.00 | $1,500.0000 | $163,500.00 | $1,950.0000 | $212,550.00 | $2,700.0000 | $294,300.00 | $2,267.0000 | $247,103.00 |
| 907-823-A002 | Preformed Joint Seal, Type II | 66 | LF | $58.0000 | $3,828.00 | $50.0000 | $3,300.00 | $35.4000 | $2,336.40 | $15.0000 | $990.00 | $30.0000 | $1,980.00 | $55.0000 | $3,630.00 | $60.0000 | $3,960.00 | $36.7500 | $2,425.50 |
Source: public Mississippi DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.