MS
Mississippi DOT · Bid Tabulation
Contract 105530301
Pavement Restoration of US 49 from the Hinds County Line to the Yazoo County Line, and ITS Improvements on US 49 from Northside Drive to the Madison County Line, US 49 from the Hinds County Line to the Yazoo County Line, and US 49 from the Madison County
- County
- Madison
- District
- 5
- Letting
- May 27, 2026
- Bidders
- 4
Apparent low bid
APAC - Mississippi, Inc.
$18,599,130.40
Other bidders
Superior Asphalt, Inc.
$18,853,152.50
Dickerson & Bowen, Inc.
$19,271,093.60
A J Construction, Inc.
$20,576,807.32
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | APAC - Mississippi, Inc. $18,599,130.40 | Superior Asphalt, Inc. $18,853,152.50 | Dickerson & Bowen, Inc. $19,271,093.60 | A J Construction, Inc. $20,576,807.32 | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201-D001 | Random Clearing | 369 | STA | $1,250.0000 | $461,250.00 | $1,500.0000 | $553,500.00 | $1,265.0300 | $466,796.07 | $1,250.0000 | $461,250.00 |
| 202-B006 | Removal of Asphalt Paved Shoulders, All Depths | 792 | SY | $27.0000 | $21,384.00 | $25.0000 | $19,800.00 | $26.3300 | $20,853.36 | $25.0000 | $19,800.00 |
| 202-B009 | Removal of Asphalt Pavement, Failed Areas | 204 | SY | $187.5000 | $38,250.00 | $181.0000 | $36,924.00 | $189.7500 | $38,709.00 | $187.5000 | $38,250.00 |
| 202-B069 | Removal of Concrete Pavement w/ Variable Depth Overlay | 1,225 | SY | $128.4500 | $157,351.25 | $125.0000 | $153,125.00 | $129.9900 | $159,237.75 | $128.4500 | $157,351.25 |
| 202-B158 | Removal of Guard Rail, Including Rails, Posts and Terminal Ends | 2,160 | LF | $7.2500 | $15,660.00 | $7.0000 | $15,120.00 | $7.3700 | $15,919.20 | $7.3200 | $15,811.20 |
| 202-B168 | Removal of Island Pavement, All Types | 17 | SY | $300.0000 | $5,100.00 | $300.0000 | $5,100.00 | $303.6100 | $5,161.37 | $300.0000 | $5,100.00 |
| 202-B169 | Removal of Joint Material | 752 | LF | $1.0000 | $752.00 | $1.0000 | $752.00 | $1.0100 | $759.52 | $1.0000 | $752.00 |
| 203-G001 | Excess Excavation, FM, AH | 33,024 | CY | $22.4900 | $742,709.76 | $19.6500 | $648,921.60 | $22.7700 | $751,956.48 | $22.5000 | $743,040.00 |
| 209-A005 | Geotextile Stabilization, Type V, Non-Woven | 78,113 | SY | $2.7900 | $217,935.27 | $3.0000 | $234,339.00 | $2.8200 | $220,278.66 | $6.0000 | $468,678.00 |
| 304-B003 | Granular Material, Class 5, Group C | 6,709 | TON | $29.1300 | $195,433.17 | $60.0000 | $402,540.00 | $67.0000 | $449,503.00 | $43.1300 | $289,359.17 |
| 304-B004 | Granular Material, Class 5, Group D | 11,918 | TON | $57.9000 | $690,052.20 | $60.0000 | $715,080.00 | $67.0000 | $798,506.00 | $50.0000 | $595,900.00 |
| 304-D002 | Granular Material, Crushed Stone | 29,404 | TON | $84.9700 | $2,498,457.88 | $80.0000 | $2,352,320.00 | $87.0000 | $2,558,148.00 | $90.0000 | $2,646,360.00 |
| 305-B001 | Size I Stabilizer Aggregate, Coarse | 20 | TON | $56.0300 | $1,120.60 | $125.0000 | $2,500.00 | $530.0000 | $10,600.00 | $107.0000 | $2,140.00 |
| 406-D001 | Fine Milling of Bituminous Pavement, All Depths | 357,405 | SY | $1.3400 | $478,922.70 | $1.9000 | $679,069.50 | $1.7100 | $611,162.55 | $2.0000 | $714,810.00 |
| 423-A001 | Rumble Strips, Ground In | 36 | MI | $290.0000 | $10,440.00 | $300.0000 | $10,800.00 | $648.1000 | $23,331.60 | $290.0000 | $10,440.00 |
| 503-C010 | Saw Cut, Full Depth | 3,348 | LF | $7.3800 | $24,708.24 | $10.0000 | $33,480.00 | $9.6100 | $32,174.28 | $9.5000 | $31,806.00 |
| 603-RA002 | 18" Pipe Removed and Relaid | 32 | LF | $500.0000 | $16,000.00 | $500.0000 | $16,000.00 | $506.0100 | $16,192.32 | $500.0000 | $16,000.00 |
| 603-RB002 | 18" End Section Removed and Relaid | 2 | EA | $5,000.0000 | $10,000.00 | $5,000.0000 | $10,000.00 | $5,060.1200 | $10,120.24 | $5,000.0000 | $10,000.00 |
| 606-B003 | Guard Rail, Class A, Type 1, 'W' Beam, Metal Post | 1,660 | LF | $30.0500 | $49,883.00 | $29.0000 | $48,140.00 | $30.5500 | $50,713.00 | $30.3100 | $50,314.60 |
| 606-D012 | Guard Rail, Bridge End Section, Type D Modified | 4 | EA | $2,538.8600 | $10,155.44 | $2,450.0000 | $9,800.00 | $2,580.7200 | $10,322.88 | $2,560.2500 | $10,241.00 |
| 606-D023 | Guard Rail, Bridge End Section, Type I, Metal Post | 6 | EA | $3,626.9400 | $21,761.64 | $3,500.0000 | $21,000.00 | $3,686.7300 | $22,120.38 | $3,657.5000 | $21,945.00 |
| 606-E005 | Guard Rail, Terminal End Section, Flared | 10 | EA | $3,626.9400 | $36,269.40 | $3,500.0000 | $35,000.00 | $3,686.7300 | $36,867.30 | $3,657.5000 | $36,575.00 |
| 616-A001 | Concrete Median and/or Island Pavement, 10-inch | 17 | SY | $500.0000 | $8,500.00 | $500.0000 | $8,500.00 | $506.0100 | $8,602.17 | $522.5000 | $8,882.50 |
| 619-A1001 | Temporary Traffic Stripe, Continuous White | 40 | MI | $1,500.0000 | $60,000.00 | $1,500.0000 | $60,000.00 | $1,518.0400 | $60,721.60 | $1,567.5000 | $62,700.00 |
| 619-A2001 | Temporary Traffic Stripe, Continuous Yellow | 40 | MI | $1,500.0000 | $60,000.00 | $1,500.0000 | $60,000.00 | $1,518.0400 | $60,721.60 | $1,567.5000 | $62,700.00 |
| 619-A3001 | Temporary Traffic Stripe, Skip White | 40 | MI | $1,500.0000 | $60,000.00 | $1,500.0000 | $60,000.00 | $1,518.0400 | $60,721.60 | $1,567.5000 | $62,700.00 |
| 619-A5001 | Temporary Traffic Stripe, Detail | 11,803 | LF | $0.1000 | $1,180.30 | $0.1000 | $1,180.30 | $0.1000 | $1,180.30 | $0.1000 | $1,180.30 |
| 619-A6001 | Temporary Traffic Stripe, Legend | 72 | SF | $2.0000 | $144.00 | $2.0000 | $144.00 | $2.0200 | $145.44 | $2.0900 | $150.48 |
| 619-A6002 | Temporary Traffic Stripe, Legend | 1,234 | LF | $1.0000 | $1,234.00 | $1.0000 | $1,234.00 | $1.0100 | $1,246.34 | $1.0500 | $1,295.70 |
| 619-D1001 | Standard Roadside Construction Signs, Less than 10 Square Feet | 32 | SF | $8.2100 | $262.72 | $8.0000 | $256.00 | $11.6600 | $373.12 | $12.1800 | $389.76 |
| 619-D2001 | Standard Roadside Construction Signs, 10 Square Feet or More | 600 | SF | $8.2100 | $4,926.00 | $8.0000 | $4,800.00 | $11.6600 | $6,996.00 | $12.1800 | $7,308.00 |
| 619-D3001 | Remove and Reset Signs, All Sizes | 15 | EA | $305.7000 | $4,585.50 | $300.0000 | $4,500.00 | $310.7400 | $4,661.10 | $295.0000 | $4,425.00 |
| 619-G4005 | Barricades, Type III, Single Faced | 24 | LF | $16.4100 | $393.84 | $18.0000 | $432.00 | $21.1900 | $508.56 | $21.2000 | $508.80 |
| 620-A001 | Mobilization | 1 | LS | $1,037,301.3400 | $1,037,301.34 | $1,250,000.0000 | $1,250,000.00 | $1,025,000.0000 | $1,025,000.00 | $1,424,442.1100 | $1,424,442.11 |
| 630-C001 | Square Tube Posts, 4.0 lb/ft | 30 | LF | $47.6700 | $1,430.10 | $48.0000 | $1,440.00 | $48.4500 | $1,453.50 | $46.0000 | $1,380.00 |
| 630-F002 | Delineators, Flexible Post Mounted, Crossover, Type I, Yellow | 136 | EA | $129.5300 | $17,616.08 | $125.0000 | $17,000.00 | $131.6700 | $17,907.12 | $125.0000 | $17,000.00 |
| 630-F006 | Delineators, Guard Rail, White | 35 | EA | $26.9400 | $942.90 | $27.0000 | $945.00 | $27.3900 | $958.65 | $26.0000 | $910.00 |
| 630-F007 | Delineators, Guard Rail, Yellow | 35 | EA | $26.9400 | $942.90 | $27.0000 | $945.00 | $27.3900 | $958.65 | $26.0000 | $910.00 |
| 630-G004 | Type 3 Object Markers, OM-3R or OM-3L | 10 | EA | $129.5300 | $1,295.30 | $130.0000 | $1,300.00 | $131.6700 | $1,316.70 | $125.0000 | $1,250.00 |
| 647-A001 | Removal of Existing Traffic Signal Equipment | 1 | LS | $11,818.1800 | $11,818.18 | $12,000.0000 | $12,000.00 | $12,398.6300 | $12,398.63 | $11,700.0000 | $11,700.00 |
| 907-403-A003 | 12.5-mm, ST, Asphalt Pavement | 6,796 | TON | $121.8400 | $828,024.64 | $123.2500 | $837,607.00 | $122.0000 | $829,112.00 | $145.0000 | $985,420.00 |
| 907-403-A006 | 19-mm, ST, Asphalt Pavement | 11,893 | TON | $118.1300 | $1,404,920.09 | $109.8500 | $1,306,446.05 | $116.7500 | $1,388,507.75 | $123.0000 | $1,462,839.00 |
| 907-403-A013 | 9.5-mm, HT, Asphalt Pavement | 31,844 | TON | $125.8100 | $4,006,293.64 | $128.1000 | $4,079,216.40 | $123.5000 | $3,932,734.00 | $126.0000 | $4,012,344.00 |
| 907-403-A015 | 9.5-mm, ST, Asphalt Pavement | 10,561 | TON | $135.2400 | $1,428,269.64 | $136.6500 | $1,443,160.65 | $145.0000 | $1,531,345.00 | $138.0000 | $1,457,418.00 |
| 907-403-B001 | 12.5-mm, HT, Asphalt Pavement, Leveling | 1,695 | TON | $166.6300 | $282,437.85 | $156.0000 | $264,420.00 | $164.7500 | $279,251.25 | $192.0000 | $325,440.00 |
| 907-407-A001 | Asphalt for Tack Coat | 51,600 | GAL | $3.8700 | $199,692.00 | $4.0000 | $206,400.00 | $4.6000 | $237,360.00 | $4.0000 | $206,400.00 |
| 907-413-E001 | Sawing and Sealing Transverse Joints in Asphalt Pavement | 21,811 | LF | $3.0000 | $65,433.00 | $3.0000 | $65,433.00 | $3.0400 | $66,305.44 | $3.0000 | $65,433.00 |
| 907-420-A001 | Undersealing | 500 | LBS | $6.0000 | $3,000.00 | $6.0000 | $3,000.00 | $6.0700 | $3,035.00 | $6.0000 | $3,000.00 |
| 907-601-B001 | Class "B" Structural Concrete, Minor Structures | 1 | CY | $10,000.0000 | $10,000.00 | $1,000.0000 | $1,000.00 | $10,120.2500 | $10,120.25 | $10,000.0000 | $10,000.00 |
| 907-618-A001 | Maintenance of Traffic | 1 | LS | $612,647.1200 | $612,647.12 | $325,000.0000 | $325,000.00 | $525,000.0000 | $525,000.00 | $1,179,365.0000 | $1,179,365.00 |
| 907-626-A010 | 6" Thermoplastic Traffic Stripe, Skip White | 20 | MI | $6,000.0000 | $120,000.00 | $6,000.0000 | $120,000.00 | $6,072.1500 | $121,443.00 | $6,000.0000 | $120,000.00 |
| 907-626-B006 | 6" Thermoplastic Traffic Stripe, Continuous White | 20 | MI | $9,000.0000 | $180,000.00 | $9,000.0000 | $180,000.00 | $9,108.2200 | $182,164.40 | $9,000.0000 | $180,000.00 |
| 907-626-E005 | 6" Thermoplastic Traffic Stripe, Continuous Yellow | 20 | MI | $8,900.0000 | $178,000.00 | $8,900.0000 | $178,000.00 | $9,007.0200 | $180,140.40 | $8,900.0000 | $178,000.00 |
| 907-626-G004 | Thermoplastic Detail Stripe, White | 14,087 | LF | $5.0000 | $70,435.00 | $5.0000 | $70,435.00 | $5.0600 | $71,280.22 | $5.0000 | $70,435.00 |
| 907-626-G005 | Thermoplastic Detail Stripe, Yellow | 10,281 | LF | $5.0000 | $51,405.00 | $5.0000 | $51,405.00 | $5.0600 | $52,021.86 | $5.0000 | $51,405.00 |
| 907-626-H009 | Thermoplastic Legend, White | 338 | SF | $14.0000 | $4,732.00 | $14.0000 | $4,732.00 | $14.1700 | $4,789.46 | $14.0000 | $4,732.00 |
| 907-626-H010 | Thermoplastic Legend, White | 1,234 | LF | $7.0000 | $8,638.00 | $7.0000 | $8,638.00 | $7.0800 | $8,736.72 | $7.0000 | $8,638.00 |
| 907-627-J001 | Two-Way Clear Reflective High Performance Raised Markers | 243 | EA | $15.0000 | $3,645.00 | $15.0000 | $3,645.00 | $15.1800 | $3,688.74 | $15.0000 | $3,645.00 |
| 907-627-K001 | Red-Clear Reflective High Performance Raised Markers | 3,201 | EA | $15.0000 | $48,015.00 | $15.0000 | $48,015.00 | $15.1800 | $48,591.18 | $15.0000 | $48,015.00 |
| 907-627-L001 | Two-Way Yellow Reflective High Performance Raised Markers | 51 | EA | $15.0000 | $765.00 | $15.0000 | $765.00 | $15.1800 | $774.18 | $15.0000 | $765.00 |
| 907-630-PP002 | Roadside Directional Signs | 26 | SF | $25.9100 | $673.66 | $25.0000 | $650.00 | $26.3300 | $684.58 | $25.0000 | $650.00 |
| 907-632-C001 | Modify Existing Traffic Signal Cabinet Assembly | 7 | EA | $1,010.1000 | $7,070.70 | $1,050.0000 | $7,350.00 | $1,059.7100 | $7,417.97 | $1,045.0000 | $7,315.00 |
| 907-634-E001 | Camera Pole with Foundation, 50' Pole | 2 | EA | $28,363.6400 | $56,727.28 | $29,000.0000 | $58,000.00 | $29,756.7100 | $59,513.42 | $29,343.6000 | $58,687.20 |
| 907-634-E004 | Camera Pole with Foundation, 80' Pole | 1 | EA | $52,727.2700 | $52,727.27 | $53,000.0000 | $53,000.00 | $55,316.9700 | $55,316.97 | $54,549.0000 | $54,549.00 |
| 907-634-I001 | Wood Pole, Class II Height 40' | 3 | EA | $16,262.6300 | $48,787.89 | $17,000.0000 | $51,000.00 | $17,061.3600 | $51,184.08 | $16,824.5000 | $50,473.50 |
| 907-634-K001 | Camera Lowering Device | 1 | EA | $12,398.9900 | $12,398.99 | $13,000.0000 | $13,000.00 | $13,007.9700 | $13,007.97 | $12,827.3800 | $12,827.38 |
| 907-636-B053 | Electric Cable, Underground in Conduit, THHN, AWG #6, 3 Conductor | 660 | LF | $5.7600 | $3,801.60 | $6.0000 | $3,960.00 | $6.0400 | $3,986.40 | $5.9600 | $3,933.60 |
| 907-637-A002 | Pullbox Enclosure, Type 2 | 3 | EA | $1,045.4500 | $3,136.35 | $1,100.0000 | $3,300.00 | $1,096.8000 | $3,290.40 | $1,081.5800 | $3,244.74 |
| 907-637-A004 | Pullbox Enclosure, Type 4 | 101 | EA | $1,500.0000 | $151,500.00 | $1,560.0000 | $157,560.00 | $1,573.6700 | $158,940.67 | $1,551.8300 | $156,734.83 |
| 907-637-A005 | Pullbox Enclosure, Type 5 | 22 | EA | $2,287.8800 | $50,333.36 | $2,380.0000 | $52,360.00 | $2,400.2500 | $52,805.50 | $2,366.9300 | $52,072.46 |
| 907-637-E001 | Traffic Signal Conduit, Structural Conduit, Type 1, 1 1/2" | 660 | LF | $7.5300 | $4,969.80 | $7.6000 | $5,016.00 | $8.2100 | $5,418.60 | $7.7900 | $5,141.40 |
| 907-637-H001 | Traffic Signal Conduit Bank, Underground, Rolled Pipe, 2 @ 2" | 107,120 | LF | $9.3900 | $1,005,856.80 | $9.5000 | $1,017,640.00 | $9.8600 | $1,056,203.20 | $9.7200 | $1,041,206.40 |
| 907-637-H002 | Traffic Signal Conduit Bank, Underground, Rolled Pipe, 2" | 3,270 | LF | $11.3600 | $37,147.20 | $11.5000 | $37,605.00 | $11.9200 | $38,978.40 | $11.7600 | $38,455.20 |
| 907-637-K001 | Traffic Signal Conduit Bank, Aerial Supported, Type 1, 2 @ 2" | 2,060 | LF | $26.2100 | $53,992.60 | $27.2500 | $56,135.00 | $27.5000 | $56,650.00 | $27.1200 | $55,867.20 |
| 907-650-A002 | On Street Video Equipment, Fixed Type | 8 | EA | $2,888.8900 | $23,111.12 | $3,000.0000 | $24,000.00 | $3,030.7700 | $24,246.16 | $2,988.7000 | $23,909.60 |
| 907-650-A003 | On Street Video Equipment, PTZ Type | 4 | EA | $4,308.0800 | $17,232.32 | $4,400.0000 | $17,600.00 | $4,519.6700 | $18,078.68 | $4,456.9300 | $17,827.72 |
| 907-650-A004 | On Street Video Equipment, PTZ Type, Signal Monitoring | 6 | EA | $3,641.4100 | $21,848.46 | $3,800.0000 | $22,800.00 | $3,820.2600 | $22,921.56 | $3,767.2300 | $22,603.38 |
| 907-659-A001 | Traffic Management Center Modifications | 1 | LS | $123,196.9700 | $123,196.97 | $130,000.0000 | $130,000.00 | $129,247.7700 | $129,247.77 | $127,453.4300 | $127,453.43 |
| 907-660-A002 | Equipment Cabinet, Type B | 2 | EA | $5,873.7400 | $11,747.48 | $6,000.0000 | $12,000.00 | $6,162.2300 | $12,324.46 | $6,076.6800 | $12,153.36 |
| 907-660-A003 | Equipment Cabinet, Type C | 1 | EA | $13,151.5200 | $13,151.52 | $13,500.0000 | $13,500.00 | $13,797.4500 | $13,797.45 | $13,605.9000 | $13,605.90 |
| 907-661-A004 | Fiber Optic Cable, 72 SM | 115,750 | LF | $2.5100 | $290,532.50 | $2.6000 | $300,950.00 | $2.6300 | $304,422.50 | $2.5900 | $299,792.50 |
| 907-661-A006 | Fiber Optic Cable, Aerial, 72 SM | 2,080 | LF | $3.5900 | $7,467.20 | $3.7500 | $7,800.00 | $3.7600 | $7,820.80 | $3.7100 | $7,716.80 |
| 907-661-B002 | Fiber Optic Drop Cable, 12 SM | 2,800 | LF | $2.5800 | $7,224.00 | $2.7500 | $7,700.00 | $2.7000 | $7,560.00 | $2.6600 | $7,448.00 |
| 907-663-A001 | Network Switch, Type A | 9 | EA | $2,141.4100 | $19,272.69 | $2,200.0000 | $19,800.00 | $2,246.5900 | $20,219.31 | $2,215.4000 | $19,938.60 |
| 907-663-A005 | Network Switch, Type E | 1 | EA | $36,454.5500 | $36,454.55 | $37,000.0000 | $37,000.00 | $38,245.0000 | $38,245.00 | $37,714.0500 | $37,714.05 |
| 907-663-D001 | Category 6 Cable, Installed in Conduit | 2,120 | LF | $2.4200 | $5,130.40 | $2.5500 | $5,406.00 | $2.5400 | $5,384.80 | $2.5100 | $5,321.20 |
| 907-808-A002 | Joint Repair | 1,504 | LF | $1.0000 | $1,504.00 | $1.0000 | $1,504.00 | $1.0100 | $1,519.04 | $1.0000 | $1,504.00 |
| 907-823-A001 | Preformed Joint Seal, Type I | 596 | LF | $30.0000 | $17,880.00 | $30.0000 | $17,880.00 | $30.3600 | $18,094.56 | $30.0000 | $17,880.00 |
| 907-823-A002 | Preformed Joint Seal, Type II | 39 | LF | $40.0000 | $1,560.00 | $40.0000 | $1,560.00 | $40.4800 | $1,578.72 | $40.0000 | $1,560.00 |
| 907-823-A003 | Preformed Joint Seal, Type III | 117 | LF | $55.0000 | $6,435.00 | $55.0000 | $6,435.00 | $55.6600 | $6,512.22 | $55.0000 | $6,435.00 |
| 907-823-B001 | Saw Cut, Type I | 1,192 | LF | $6.0000 | $7,152.00 | $6.0000 | $7,152.00 | $6.0700 | $7,235.44 | $6.0000 | $7,152.00 |
| 907-823-B002 | Saw Cut, Type II | 78 | LF | $7.0000 | $546.00 | $7.0000 | $546.00 | $7.0800 | $552.24 | $7.0000 | $546.00 |
| 907-823-B003 | Saw Cut, Type III | 234 | LF | $7.0000 | $1,638.00 | $7.0000 | $1,638.00 | $7.0800 | $1,656.72 | $7.0000 | $1,638.00 |
| 907-824-A003 | General Epoxy Repair | 16 | SF | $900.0000 | $14,400.00 | $1,000.0000 | $16,000.00 | $910.8200 | $14,573.12 | $900.0000 | $14,400.00 |
Source: public Mississippi DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.