MS Mississippi DOT · Bid Tabulation

Contract 108392301

Bridge Replacement on SR 15 over Cypress Branch on Bridge No. 15.7

County
Harrison
District
6
Letting
May 27, 2026
Bidders
5
Apparent low bid Holliday Construction, LLC $2,409,307.40
Other bidders Chris Albritton Construction Company, Inc. $2,738,473.17 Hemphill Construction Company, Inc. $2,868,807.40 T. L. Wallace Construction, Inc. $3,241,275.22 JLB Contractors, LLC $3,259,253.00

Bid Items - unit price and extension by bidder

Item Description Qty UOM Holliday Construction, LLC $2,409,307.40 Chris Albritton Construction Company, Inc. $2,738,473.17 Hemphill Construction Company, Inc. $2,868,807.40 T. L. Wallace Construction, Inc. $3,241,275.22 JLB Contractors, LLC $3,259,253.00
Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
201-A001 Clearing and Grubbing 1 LS $17,967.0000 $17,967.00 $159,300.0000 $159,300.00 $169,500.0000 $169,500.00 $83,350.0000 $83,350.00 $60,000.0000 $60,000.00
202-B007 Removal of Asphalt Pavement, All Depths 4,602 SY $4.5000 $20,709.00 $7.0800 $32,582.16 $11.7500 $54,073.50 $31.7000 $145,883.40 $11.0000 $50,622.00
202-B023 Removal of Bridge 1 EA $5,989.0000 $5,989.00 $11,800.0000 $11,800.00 $42,500.0000 $42,500.00 $16,300.0000 $16,300.00 $95,000.0000 $95,000.00
202-B151 Removal of Guard Rail Only 744 LF $5.5000 $4,092.00 $5.9000 $4,389.60 $11.5000 $8,556.00 $5.9500 $4,426.80 $7.0000 $5,208.00
202-B191 Removal of Pipe, 8" And Above 193 LF $5.5000 $1,061.50 $11.8000 $2,277.40 $27.0000 $5,211.00 $38.1000 $7,353.30 $15.0000 $2,895.00
202-B240 Removal of Traffic Stripe 5,200 LF $3.5000 $18,200.00 $3.5400 $18,408.00 $3.5500 $18,460.00 $3.4000 $17,680.00 $7.5000 $39,000.00
203-A001 Unclassified Excavation, FM, AH 155 CY $11.5000 $1,782.50 $29.5000 $4,572.50 $14.1500 $2,193.25 $22.8500 $3,541.75 $15.0000 $2,325.00
203-EX017 Borrow Excavation, AH, FME, Class B7 14,364 CY $23.0000 $330,372.00 $23.1300 $332,239.32 $23.7500 $341,145.00 $27.0000 $387,828.00 $23.0000 $330,372.00
203-G001 Excess Excavation, FM, AH 7,830 CY $7.0000 $54,810.00 $14.1600 $110,872.80 $16.2500 $127,237.50 $21.6500 $169,519.50 $12.0000 $93,960.00
206-A001 Structure Excavation 660 CY $9.5000 $6,270.00 $11.8000 $7,788.00 $23.5000 $15,510.00 $32.7000 $21,582.00 $18.0000 $11,880.00
206-B001 Select Material for Undercuts, Contractor Furnished, FM 293 CY $91.5000 $26,809.50 $29.5000 $8,643.50 $119.7500 $35,086.75 $124.2500 $36,405.25 $35.0000 $10,255.00
209-A005 Geotextile Stabilization, Type V, Non-Woven 3,481 SY $4.5000 $15,664.50 $3.5400 $12,322.74 $2.9500 $10,268.95 $3.0000 $10,443.00 $5.0000 $17,405.00
211-A001 Topsoil for Slope Treatment, From Right-of-Way 24,129 SY $2.0000 $48,258.00 $2.3600 $56,944.44 $0.5000 $12,064.50 $4.0000 $96,516.00 $2.0000 $48,258.00
213-C001 Superphosphate 5 TON $1,711.5000 $8,557.50 $590.0000 $2,950.00 $2,950.0000 $14,750.00 $1,112.0000 $5,560.00 $1,800.0000 $9,000.00
215-A001 Vegetative Materials for Mulch 20 TON $285.0000 $5,700.00 $236.0000 $4,720.00 $600.0000 $12,000.00 $252.0000 $5,040.00 $200.0000 $4,000.00
216-A001 Solid Sodding 100 SY $11.0000 $1,100.00 $9.4400 $944.00 $23.5000 $2,350.00 $16.6000 $1,660.00 $15.0000 $1,500.00
219-A001 Watering 2 KGAL $20.0000 $40.00 $20.0000 $40.00 $20.0000 $40.00 $20.0000 $40.00 $20.0000 $40.00
220-A001 Insect Pest Control 10 ACRE $30.0000 $300.00 $30.0000 $300.00 $30.0000 $300.00 $30.0000 $300.00 $30.0000 $300.00
225-A001 Grassing 10 ACRE $2,282.5000 $22,825.00 $1,416.0000 $14,160.00 $4,000.0000 $40,000.00 $1,359.0000 $13,590.00 $4,500.0000 $45,000.00
225-B001 Agricultural Limestone 5 TON $570.5000 $2,852.50 $1,180.0000 $5,900.00 $1,775.0000 $8,875.00 $137.0000 $685.00 $750.0000 $3,750.00
225-C001 Mulch, Vegetative Mulch 20 TON $285.0000 $5,700.00 $236.0000 $4,720.00 $550.0000 $11,000.00 $252.0000 $5,040.00 $200.0000 $4,000.00
226-A001 Temporary Grassing 10 ACRE $1,255.0000 $12,550.00 $1,180.0000 $11,800.00 $1,775.0000 $17,750.00 $1,180.0000 $11,800.00 $2,000.0000 $20,000.00
237-A002 Wattles, 20" 100 LF $11.0000 $1,100.00 $7.0800 $708.00 $23.5000 $2,350.00 $11.1000 $1,110.00 $10.0000 $1,000.00
239-A001 Temporary Slope Drains 292 LF $19.0000 $5,548.00 $11.8000 $3,445.60 $50.0000 $14,600.00 $0.0100 $2.92 $35.0000 $10,220.00
246-B002 Rockbags 30 LF $14.5000 $435.00 $29.5000 $885.00 $50.0000 $1,500.00 $27.6000 $828.00 $175.0000 $5,250.00
247-A001 Temporary Stream Diversion 3 EA $27,948.0000 $83,844.00 $17,700.0000 $53,100.00 $19,500.0000 $58,500.00 $27,850.0000 $83,550.00 $45,000.0000 $135,000.00
249-A001 Riprap for Erosion Control 25 TON $109.5000 $2,737.50 $118.0000 $2,950.00 $175.0000 $4,375.00 $133.2500 $3,331.25 $125.0000 $3,125.00
304-D005 Granular Material, Size 67 109 TON $81.5000 $8,883.50 $73.1600 $7,974.44 $98.0000 $10,682.00 $121.7500 $13,270.75 $90.0000 $9,810.00
304-F002 Size 610 Crushed Stone Base 3,298 TON $79.5000 $262,191.00 $70.8000 $233,498.40 $88.7500 $292,697.50 $81.8000 $269,776.40 - -
304-F003 Size 825B Crushed Stone Base 3,298 TON - - - - - - - - $80.0000 $263,840.00
406-A002 Cold Milling of Bituminous Pavement, All Depths 1,360 SY $5.5000 $7,480.00 $5.9000 $8,024.00 $5.5000 $7,480.00 $9.6000 $13,056.00 $9.5000 $12,920.00
423-A001 Rumble Strips, Ground In 1 MI $359.0000 $359.00 $354.0000 $354.00 $4,500.0000 $4,500.00 $337.7500 $337.75 $5,000.0000 $5,000.00
603-PE003 18" Corrugated Polyethylene Pipe 200 LF $50.0000 $10,000.00 $29.5000 $5,900.00 $60.0000 $12,000.00 $177.0000 $35,400.00 $50.0000 $10,000.00
619-A1002 Temporary Traffic Stripe, Continuous White 2,367 LF $1.2000 $2,840.40 $1.1800 $2,793.06 $1.1500 $2,722.05 $1.1500 $2,722.05 $1.0000 $2,367.00
619-A2002 Temporary Traffic Stripe, Continuous Yellow 1,735 LF $1.2000 $2,082.00 $1.1800 $2,047.30 $1.1500 $1,995.25 $1.1500 $1,995.25 $1.0000 $1,735.00
619-A5003 Temporary Traffic Stripe, Detail, Type 1 Tape 1,050 LF $2.4000 $2,520.00 $2.3600 $2,478.00 $2.2500 $2,362.50 $2.2500 $2,362.50 $1.0000 $1,050.00
619-C6001 Red-Clear Reflective High Performance Raised Marker 65 EA $11.5000 $747.50 $11.8000 $767.00 $11.5000 $747.50 $11.3000 $734.50 $12.0000 $780.00
619-C7001 Two-Way Yellow Reflective High Performance Raised Marker 65 EA $11.5000 $747.50 $11.8000 $767.00 $11.5000 $747.50 $11.3000 $734.50 $12.0000 $780.00
619-D1001 Standard Roadside Construction Signs, Less than 10 Square Feet 72 SF $20.0000 $1,440.00 $8.0800 $581.76 $8.1000 $583.20 $19.2000 $1,382.40 $30.0000 $2,160.00
619-D2001 Standard Roadside Construction Signs, 10 Square Feet or More 268 SF $20.0000 $5,360.00 $8.0800 $2,165.44 $8.1000 $2,170.80 $19.2000 $5,145.60 $30.0000 $8,040.00
619-G4001 Barricades, Type III, Double Faced 72 LF $41.5000 $2,988.00 $18.2900 $1,316.88 $18.2500 $1,314.00 $39.4000 $2,836.80 $75.0000 $5,400.00
619-G5001 Free Standing Plastic Drums 74 EA $77.5000 $5,735.00 $35.4000 $2,619.60 $35.5000 $2,627.00 $73.2000 $5,416.80 $90.0000 $6,660.00
619-G7001 Warning Lights, Type "B" 10 EA $299.0000 $2,990.00 $177.0000 $1,770.00 $175.0000 $1,750.00 $281.5000 $2,815.00 $150.0000 $1,500.00
619-G8001 Warning Lights, Type "C" 22 EA $299.0000 $6,578.00 $23.6000 $519.20 $23.5000 $517.00 $281.5000 $6,193.00 $50.0000 $1,100.00
620-A001 Mobilization 1 LS $110,532.0000 $110,532.00 $271,400.0000 $271,400.00 $286,500.0000 $286,500.00 $310,000.0000 $310,000.00 $275,000.0000 $275,000.00
630-F013 Delineators, Post Mounted, Single Yellow 4 EA $143.5000 $574.00 $71.9800 $287.92 $72.2500 $289.00 $32.2000 $128.80 $60.0000 $240.00
630-G003 Type 3 Object Markers, OM-3L, Post Mounted 2 EA $119.5000 $239.00 $194.7000 $389.40 $195.0000 $390.00 $112.7500 $225.50 $150.0000 $300.00
630-G007 Type 3 Object Markers, OM-3R, Post Mounted 2 EA $119.5000 $239.00 $194.7000 $389.40 $195.0000 $390.00 $112.7500 $225.50 $150.0000 $300.00
699-A001 Roadway Construction Stakes 1 LS $5,989.0000 $5,989.00 $62,540.0000 $62,540.00 $22,250.0000 $22,250.00 $55,750.0000 $55,750.00 $35,000.0000 $35,000.00
805-A001 Reinforcement 132,770 LBS $2.0000 $265,540.00 $1.7700 $235,002.90 $1.8000 $238,986.00 $1.6500 $219,070.50 $1.8000 $238,986.00
815-A007 Loose Riprap, Size 300 204 TON $109.5000 $22,338.00 $118.0000 $24,072.00 $115.0000 $23,460.00 $114.2500 $23,307.00 $110.0000 $22,440.00
815-E001 Geotextile under Riprap 252 SY $4.5000 $1,134.00 $3.5400 $892.08 $2.9500 $743.40 $3.0000 $756.00 $10.0000 $2,520.00
907-234-A001 Temporary Silt Fence 4,802 LF $3.5000 $16,807.00 $3.5400 $16,999.08 $5.7500 $27,611.50 $4.5500 $21,849.10 $4.5000 $21,609.00
907-403-A003 12.5-mm, ST, Asphalt Pavement 284 TON $186.5000 $52,966.00 $185.6400 $52,721.76 $185.0000 $52,540.00 $166.6000 $47,314.40 $162.0000 $46,008.00
907-403-A006 19-mm, ST, Asphalt Pavement 879 TON $148.5000 $130,531.50 $151.2000 $132,904.80 $145.0000 $127,455.00 $146.2000 $128,509.80 $142.0000 $124,818.00
907-403-A015 9.5-mm, ST, Asphalt Pavement 554 TON $206.0000 $114,124.00 $190.7400 $105,669.96 $205.0000 $113,570.00 $185.0000 $102,490.00 $181.0000 $100,274.00
907-407-A001 Asphalt for Tack Coat 501 GAL $5.0000 $2,505.00 $4.1300 $2,069.13 $5.2500 $2,630.25 $4.8500 $2,429.85 $6.0000 $3,006.00
907-618-A001 Maintenance of Traffic 1 LS $35,934.0000 $35,934.00 $90,860.0000 $90,860.00 $11,050.0000 $11,050.00 $39,400.0000 $39,400.00 $95,000.0000 $95,000.00
907-626-C013 6" Thermoplastic Edge Stripe, Continuous White 2,600 LF $2.0000 $5,200.00 $2.3600 $6,136.00 $2.2500 $5,850.00 $2.2500 $5,850.00 $2.0000 $5,200.00
907-626-D004 6" Thermoplastic Double Drop Traffic Stripe, Skip Yellow 459 LF $2.0000 $918.00 $2.3600 $1,083.24 $2.2500 $1,032.75 $2.2500 $1,032.75 $4.0000 $1,836.00
907-626-E004 6" Thermoplastic Double Drop Traffic Stripe, Continuous Yellow 2,141 LF $2.0000 $4,282.00 $2.3600 $5,052.76 $2.2500 $4,817.25 $2.2500 $4,817.25 $4.0000 $8,564.00
907-627-L001 Two-Way Yellow Reflective High Performance Raised Markers 33 EA $11.5000 $379.50 $11.8000 $389.40 $11.5000 $379.50 $11.3000 $372.90 $15.0000 $495.00
907-804-B001 Box Bridge Concrete, Class B 634 CY $963.5000 $610,859.00 $926.3000 $587,274.20 $905.0000 $573,770.00 $1,230.6000 $780,200.40 $1,475.0000 $935,150.00