New York DOT · Bid Tabulation
Contract D265529
HIGHWAY PEDESTRIAN SAFETY IMPROVEMENTS - Various Locations
- County
- Westchester
- Letting
- January 22, 2026
- Bidders
- 4
Apparent low bid
VERDE ELECTRIC MAINTENANCE CORP
$6,754,552.26
Other bidders
NORTHBROOK CONTRACTING CORP
$6,938,000.01
MORANO BROTHERS CORP
$8,420,541.59
TRIUMPH CONSTRUCTION CORP
$9,774,242.51
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | VERDE ELECTRIC MAINTENANCE CORP $6,754,552.26 | NORTHBROOK CONTRACTING CORP $6,938,000.01 | MORANO BROTHERS CORP $8,420,541.59 | TRIUMPH CONSTRUCTION CORP $9,774,242.51 | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201.07010004 | CLEARING AND GRUBBING AND TREE TRIMMING | 7 | EACH | $5,850.0000 | $40,950.00 | $1,700.0000 | $11,900.00 | $5,500.0000 | $38,500.00 | $10,000.0000 | $70,000.00 |
| 203.02 | UNCLASSIFIED EXCAVATION AND DISPOSAL | 926 | CY | $365.0000 | $337,990.00 | $235.0000 | $217,610.00 | $300.0000 | $277,800.00 | $100.0000 | $92,600.00 |
| 203.03 | EMBANKMENT IN PLACE | 246 | CY | $135.0000 | $33,210.00 | $185.0000 | $45,510.00 | $196.0000 | $48,216.00 | $25.0000 | $6,150.00 |
| 203.07 | SELECT GRANULAR FILL | 109 | CY | $68.0000 | $7,412.00 | $180.0000 | $19,620.00 | $196.0000 | $21,364.00 | $40.0000 | $4,360.00 |
| 206.0201 | TRENCH AND CULVERT EXCAVATION | 144 | CY | $25.0000 | $3,600.00 | $370.0000 | $53,280.00 | $70.0000 | $10,080.00 | $500.0000 | $72,000.00 |
| 206.03 | CONDUIT EXCAV & BACKFL INC/SURFACE RESTR | 2,549 | LF | $95.0000 | $242,155.00 | $126.0000 | $321,174.00 | $182.0000 | $463,918.00 | $150.0000 | $382,350.00 |
| 206.05 | TEST PIT EXCAVATION | 102 | EACH | $1,500.0000 | $153,000.00 | $910.0000 | $92,820.00 | $2,375.0000 | $242,250.00 | $700.0000 | $71,400.00 |
| 209.100101 | MULCH - TEMPORARY | 1,166 | SY | $3.6500 | $4,255.90 | $1.0000 | $1,166.00 | $0.5500 | $641.30 | $16.0000 | $18,656.00 |
| 209.1003 | SEED AND MULCH - TEMPORARY | 626 | SY | $3.6500 | $2,284.90 | $6.0000 | $3,756.00 | $3.0000 | $1,878.00 | $20.0000 | $12,520.00 |
| 304.11000008 | SUBBASE COURSE (MODIFIED) | 714 | CY | $125.0000 | $89,250.00 | $350.0000 | $249,900.00 | $150.0000 | $107,100.00 | $200.0000 | $142,800.00 |
| 404.0983 | 9.5 F3 Top Cour Asph 80 Ser Comp | 65 | TON | $425.0000 | $27,625.00 | $875.0000 | $56,875.00 | $253.0000 | $16,445.00 | $250.0000 | $16,250.00 |
| 404.1989 | 19 F9 Binder Cour Asph 80 Ser Comp | 36 | TON | $400.0000 | $14,400.00 | $415.0000 | $14,940.00 | $349.0000 | $12,564.00 | $250.0000 | $9,000.00 |
| 404.3789 | 37.5 F9 Base Cour Asph 80 Ser Comp | 72 | TON | $395.0000 | $28,440.00 | $300.0000 | $21,600.00 | $306.0000 | $22,032.00 | $250.0000 | $18,000.00 |
| 407.0103 | STRAIGHT TACK COAT | 54 | GAL | $60.0000 | $3,240.00 | $56.0000 | $3,024.00 | $33.0000 | $1,782.00 | $30.0000 | $1,620.00 |
| 418.7603 | ASPHALT PAVEMENT JOINT ADHESIVE | 3,612 | LF | $2.7500 | $9,933.00 | $2.0000 | $7,224.00 | $3.6000 | $13,003.20 | $35.0000 | $126,420.00 |
| 503.1013 | PCC Foundation for Pavement, PEM | 120 | CY | $1,070.0000 | $128,400.00 | $350.0000 | $42,000.00 | $359.0000 | $43,080.00 | $1,500.0000 | $180,000.00 |
| 520.50000004 | SAWING CONCRETE | 66 | LF | $7.2500 | $478.50 | $41.0000 | $2,706.00 | $7.3000 | $481.80 | $11.0000 | $726.00 |
| 552.17 | SHIELDS AND SHORING | 224 | SF | $85.0000 | $19,040.00 | $9.0000 | $2,016.00 | $53.0000 | $11,872.00 | $5.0000 | $1,120.00 |
| 555.0021 | Concrete for Structures, Performance | 1.11 | CY | $2,420.0000 | $2,686.20 | $1,200.0000 | $1,332.00 | $1,963.0000 | $2,178.93 | $7,000.0000 | $7,770.00 |
| 555.9902 | Performance Concrete Quality F Struct | 1 | QU | $15.0000 | $15.00 | $15.0000 | $15.00 | $15.0000 | $15.00 | $15.0000 | $15.00 |
| 557.30 | SIDEWALKS AND SAFETY WALKS | 61 | SY | $310.0000 | $18,910.00 | $200.0000 | $12,200.00 | $472.0000 | $28,792.00 | $1,500.0000 | $91,500.00 |
| 557.9902 | Performance Concrete Quality Adjustment | 1 | QU | $27.0100 | $27.01 | $27.0100 | $27.01 | $27.0100 | $27.01 | $27.0100 | $27.01 |
| 580.01 | REMOVAL OF STRUCTURAL CONCRETE | 20 | CY | $730.0000 | $14,600.00 | $1,500.0000 | $30,000.00 | $1,250.0000 | $25,000.00 | $300.0000 | $6,000.00 |
| 586.0201 | DRILL GROUT BOLTS OR REINFORMENT BARS | 30 | EACH | $100.0000 | $3,000.00 | $140.0000 | $4,200.00 | $103.0000 | $3,090.00 | $130.0000 | $3,900.00 |
| 603.6001 | REINF CONC PIPE CLASS III, 12 DIA | 26 | LF | $1,080.0000 | $28,080.00 | $45.0000 | $1,170.00 | $270.0000 | $7,020.00 | $50.0000 | $1,300.00 |
| 603.6002 | REINF CONC PIPE CLASS III, 15 DIA | 83 | LF | $425.0000 | $35,275.00 | $40.0000 | $3,320.00 | $250.0000 | $20,750.00 | $50.0000 | $4,150.00 |
| 603.77 | CONCRETE COLLARS | 1 | EACH | $2,180.0000 | $2,180.00 | $2,600.0000 | $2,600.00 | $1,100.0000 | $1,100.00 | $4,500.0000 | $4,500.00 |
| 604.070801 | ALTER DRAIN STRUC, LEACH BASINS AND MHS | 8 | EACH | $4,360.0000 | $34,880.00 | $1,300.0000 | $10,400.00 | $1,500.0000 | $12,000.00 | $5,000.0000 | $40,000.00 |
| 604.300103 | RECT DRAIN STRUC (TY A) #3 WELDED FRM | 21 | LF | $1,620.0000 | $34,020.00 | $500.0000 | $10,500.00 | $2,200.0000 | $46,200.00 | $500.0000 | $10,500.00 |
| 604.300203 | RECT DRAIN STRUC TY B FOR #3 WELDED FRM | 4 | LF | $1,690.0000 | $6,760.00 | $550.0000 | $2,200.00 | $1,900.0000 | $7,600.00 | $550.0000 | $2,200.00 |
| 604.310132 | RECT DRAIN STRU TY A -RND OPT RND MH FRM | 4 | LF | $2,590.0000 | $10,360.00 | $400.0000 | $1,600.00 | $1,900.0000 | $7,600.00 | $475.0000 | $1,900.00 |
| 606.10 | BOX BEAM GUIDE RAILING | 165 | LF | $135.0000 | $22,275.00 | $130.0000 | $21,450.00 | $220.0000 | $36,300.00 | $80.0000 | $13,200.00 |
| 606.100003 | BOX BEAM GUIDE RAILING (SHOP MITERED) | 7 | LF | $250.0000 | $1,750.00 | $165.0000 | $1,155.00 | $330.0000 | $2,310.00 | $400.0000 | $2,800.00 |
| 606.120101 | BOX BEAM END PIECE | 1 | EACH | $2,200.0000 | $2,200.00 | $1,500.0000 | $1,500.00 | $1,000.0000 | $1,000.00 | $1,250.0000 | $1,250.00 |
| 606.22 | ANCHORAGE UNITS FOR CORR BM GUIDERAILING | 1 | EACH | $3,850.0000 | $3,850.00 | $15,000.0000 | $15,000.00 | $3,300.0000 | $3,300.00 | $6,500.0000 | $6,500.00 |
| 606.270101 | HPBO MOD CORG BEAM GUIDE RAIL SHOP CURVE | 47 | LF | $82.0000 | $3,854.00 | $87.0000 | $4,089.00 | $270.0000 | $12,690.00 | $250.0000 | $11,750.00 |
| 606.2703 | ANCH UNITS HPBO MOD CORG BEAM GUIDE RAIL | 1 | EACH | $4,290.0000 | $4,290.00 | $7,500.0000 | $7,500.00 | $3,900.0000 | $3,900.00 | $6,500.0000 | $6,500.00 |
| 606.3062 | SNGL-SLOPE CONC HALF SEC BARR (PRECAST) | 66 | LF | $440.0000 | $29,040.00 | $225.0000 | $14,850.00 | $344.0000 | $22,704.00 | $120.0000 | $7,920.00 |
| 606.53 | RESETTING BOX BEAM GUIDE RAILING | 60 | LF | $172.0000 | $10,320.00 | $77.0000 | $4,620.00 | $976.0000 | $58,560.00 | $180.0000 | $10,800.00 |
| 606.71 | REMOVING AND DISP CORR BEAM GUIDERAILING | 101 | LF | $9.0000 | $909.00 | $34.0000 | $3,434.00 | $40.0000 | $4,040.00 | $16.0000 | $1,616.00 |
| 606.73 | REMOVING AND DISP BOX BEAM GUIDERAILING | 243 | LF | $9.0000 | $2,187.00 | $27.0000 | $6,561.00 | $42.0000 | $10,206.00 | $9.0000 | $2,187.00 |
| 606.8803 | TRANS BX BM GR TO SNGL SLP 1/2 SEC CON B | 1 | EACH | $17,600.0000 | $17,600.00 | $20,000.0000 | $20,000.00 | $17,000.0000 | $17,000.00 | $13,000.0000 | $13,000.00 |
| 606.8903 | TRNS HPBO MOD COR BM GR SNG-SL CON HF SB | 1 | EACH | $14,850.0000 | $14,850.00 | $10,000.0000 | $10,000.00 | $13,000.0000 | $13,000.00 | $10,000.0000 | $10,000.00 |
| 607.96000008 | REMOVE AND DISPOSE OF EXISTING FENCE | 9 | LF | $200.0000 | $1,800.00 | $35.0000 | $315.00 | $137.0000 | $1,233.00 | $100.0000 | $900.00 |
| 607.97000008 | REMOVE AND RESET EXISTING FENCE | 20 | LF | $200.0000 | $4,000.00 | $125.0000 | $2,500.00 | $221.0000 | $4,420.00 | $200.0000 | $4,000.00 |
| 608.0101 | CONCRETE SIDEWALKS AND DRIVEWAYS | 202 | CY | $1,100.0000 | $222,200.00 | $2,100.0000 | $424,200.00 | $1,500.0000 | $303,000.00 | $5,000.0000 | $1,010,000.00 |
| 608.020102 | ASP SIDE W, DRVWAY, BICY PATH, VEG CON S | 63 | TON | $440.0000 | $27,720.00 | $350.0000 | $22,050.00 | $309.0000 | $19,467.00 | $350.0000 | $22,050.00 |
| 608.21000003 | CAST IRON EMBEDDED DETECTABLE WARN UNITS | 157 | SY | $425.0000 | $66,725.00 | $500.0000 | $78,500.00 | $374.0000 | $58,718.00 | $300.0000 | $47,100.00 |
| 609.0212 | Stone Curb Near Vertical Face (NVF) | 1,190 | LF | $225.5000 | $268,345.00 | $225.0000 | $267,750.00 | $110.0000 | $130,900.00 | $400.0000 | $476,000.00 |
| 609.0401 | CAST-IN-PLACE CONCRETE CURB TYPE VF6 | 1,992 | LF | $121.0000 | $241,032.00 | $190.0000 | $378,480.00 | $74.0000 | $147,408.00 | $350.0000 | $697,200.00 |
| 610.1605 | Turf Estabment Performance | 555 | SY | $27.0000 | $14,985.00 | $40.0000 | $22,200.00 | $3.0000 | $1,665.00 | $26.0000 | $14,430.00 |
| 614.060204 | TREE REMV >6" - 12" DIA BREAST HEIGHT | 1 | EACH | $2,790.0000 | $2,790.00 | $3,200.0000 | $3,200.00 | $3,200.0000 | $3,200.00 | $4,000.0000 | $4,000.00 |
| 619.01 | BASIC WORK ZONE TRAFFIC CONTROL | 1 | LS | $785,000.0000 | $785,000.00 | $550,681.0000 | $550,681.00 | $900,000.0000 | $900,000.00 | $2,000,000.0000 | $2,000,000.00 |
| 619.0804 | COVER EXIST PVMT MARK LTRS OR SYM (TAPE) | 10 | EACH | $155.0000 | $1,550.00 | $200.0000 | $2,000.00 | $785.0000 | $7,850.00 | $160.0000 | $1,600.00 |
| 619.1612 | MAINTAIN TRAF SIG EQUIP (REQUIREMENT B) | 60 | INTM | $200.0000 | $12,000.00 | $400.0000 | $24,000.00 | $270.0000 | $16,200.00 | $550.0000 | $33,000.00 |
| 621.04 | CLEANING DRAINAGE STRUCTURES | 1 | EACH | $485.0000 | $485.00 | $1,100.0000 | $1,100.00 | $460.0000 | $460.00 | $7,500.0000 | $7,500.00 |
| 625.01 | SURVEY OPERATIONS | 1 | LS | $215,050.0000 | $215,050.00 | $98,000.0000 | $98,000.00 | $305,000.0000 | $305,000.00 | $200,000.0000 | $200,000.00 |
| 625.04 | CONCRETE RIGHT-OF-WAY MARKER TYPE L (LOW | 16 | EACH | $1,460.0000 | $23,360.00 | $2,000.0000 | $32,000.00 | $765.0000 | $12,240.00 | $1,000.0000 | $16,000.00 |
| 625.05 | STEEL PIN AND CAP RIGHT-OF-WAY MARKER | 13 | EACH | $730.0000 | $9,490.00 | $200.0000 | $2,600.00 | $850.0000 | $11,050.00 | $1,500.0000 | $19,500.00 |
| 627.50140008 | CUTTING PAVEMENT | 398 | LF | $5.5000 | $2,189.00 | $30.0000 | $11,940.00 | $5.0000 | $1,990.00 | $13.0000 | $5,174.00 |
| 635.0103 | CLEANING AND PREP OF PAVE SURFS - LINES | 24,449 | LF | $1.6500 | $40,340.85 | $3.0000 | $73,347.00 | $1.6500 | $40,340.85 | $4.0000 | $97,796.00 |
| 635.0203 | CLEANING AND PREP OF PAVE SURFS - LETS | 24 | EACH | $165.0000 | $3,960.00 | $175.0000 | $4,200.00 | $55.0000 | $1,320.00 | $150.0000 | $3,600.00 |
| 635.0303 | CLN AND PREP OF PAVE SURFS - SYMBOLS | 6 | EACH | $165.0000 | $990.00 | $250.0000 | $1,500.00 | $55.0000 | $330.00 | $175.0000 | $1,050.00 |
| 637.04 | Concrete Cylinder Curing Equipment | 1 | EACH | $11,500.0000 | $11,500.00 | $2,000.0000 | $2,000.00 | $7,088.0000 | $7,088.00 | $3,500.0000 | $3,500.00 |
| 637.11 | ENGINEER'S FIELD OFFICE - TYPE 1 | 24 | MNTH | $5,765.0000 | $138,360.00 | $2,500.0000 | $60,000.00 | $8,700.0000 | $208,800.00 | $3,250.0000 | $78,000.00 |
| 637.34 | OFFICE TECHNOLOGY AND SUPPLIES | 5,000 | DC | $1.0000 | $5,000.00 | $1.0000 | $5,000.00 | $1.0000 | $5,000.00 | $1.0000 | $5,000.00 |
| 637.36 | CONSTRUCTION TESTING SUPPLY CONSUMABLES | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 637.41000115 | DIGITAL INSPECTION DEVICE | 24 | MNTH | $200.0000 | $4,800.00 | $1,500.0000 | $36,000.00 | $200.0000 | $4,800.00 | $750.0000 | $18,000.00 |
| 645.5102 | GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR | 80 | SF | $70.0000 | $5,600.00 | $25.0000 | $2,000.00 | $112.0000 | $8,960.00 | $80.0000 | $6,400.00 |
| 645.81 | TYPE A SIGN POSTS | 41 | EACH | $485.0000 | $19,885.00 | $200.0000 | $8,200.00 | $275.0000 | $11,275.00 | $400.0000 | $16,400.00 |
| 647.31 | RELOC SIGN PANEL ASEMB SZ I UNDER 30SF | 25 | EACH | $275.0000 | $6,875.00 | $135.0000 | $3,375.00 | $175.0000 | $4,375.00 | $127.0000 | $3,175.00 |
| 647.51 | REMV DISP SIGN PANEL ASEMB SZ I UND 30SF | 8 | EACH | $55.0000 | $440.00 | $135.0000 | $1,080.00 | $175.0000 | $1,400.00 | $380.0000 | $3,040.00 |
| 647.61 | REMV DISP GR MT TY A SUP FND SIGN SZ I | 32 | EACH | $110.0000 | $3,520.00 | $135.0000 | $4,320.00 | $154.0000 | $4,928.00 | $440.0000 | $14,080.00 |
| 654.5020 | EXPEND IMPCT ATTNUOR TL 2, <=2 FT OBS WI | 2 | EACH | $40,150.0000 | $80,300.00 | $20,000.0000 | $40,000.00 | $43,000.0000 | $86,000.00 | $50,000.0000 | $100,000.00 |
| 655.1103 | WELDED FRAME AND RETICULINE GRATE 3 | 9 | EACH | $2,200.0000 | $19,800.00 | $1,500.0000 | $13,500.00 | $2,400.0000 | $21,600.00 | $610.0000 | $5,490.00 |
| 655.1201 | MANHOLE FRAME AND GRATE | 1 | EACH | $2,200.0000 | $2,200.00 | $1,500.0000 | $1,500.00 | $2,000.0000 | $2,000.00 | $675.0000 | $675.00 |
| 655.1202 | MANHOLE FRAME AND COVER | 5 | EACH | $2,420.0000 | $12,100.00 | $900.0000 | $4,500.00 | $1,700.0000 | $8,500.00 | $700.0000 | $3,500.00 |
| 662.60000108 | FURNISHING ELECTRICAL SERVICE | 3,000 | DC | $1.0000 | $3,000.00 | $1.0000 | $3,000.00 | $1.0000 | $3,000.00 | $1.0000 | $3,000.00 |
| 662.60030008 | ALTERING ELEVATION OF GAS VALVE BOXES | 1 | EACH | $415.0000 | $415.00 | $300.0000 | $300.00 | $350.0000 | $350.00 | $2,000.0000 | $2,000.00 |
| 663.31 | RELOCATE EXISTING HYDRANT | 1 | EACH | $14,000.0000 | $14,000.00 | $15,000.0000 | $15,000.00 | $9,800.0000 | $9,800.00 | $7,500.0000 | $7,500.00 |
| 680.05010007 | 360 Degree Camera Video Detection System | 11 | EACH | $26,525.0000 | $291,775.00 | $35,000.0000 | $385,000.00 | $36,000.0000 | $396,000.00 | $35,000.0000 | $385,000.00 |
| 680.05020007 | 360 Degree Camera Assembly | 11 | EACH | $4,500.0000 | $49,500.00 | $5,000.0000 | $55,000.00 | $6,400.0000 | $70,400.00 | $5,500.0000 | $60,500.00 |
| 680.10040001 | POWDER COATING TRAFFIC SIGNAL POLE - PED | 9 | EACH | $490.0000 | $4,410.00 | $525.0000 | $4,725.00 | $1,000.0000 | $9,000.00 | $550.0000 | $4,950.00 |
| 680.5001 | POLE EXCAVATION AND CONCRETE FOUNDATION | 136 | CY | $3,800.0000 | $516,800.00 | $4,200.0000 | $571,200.00 | $5,800.0000 | $788,800.00 | $3,000.0000 | $408,000.00 |
| 680.5002 | CONCRETE BASE FOR CONTROLLER CABINET | 2 | EACH | $2,500.0000 | $5,000.00 | $4,500.0000 | $9,000.00 | $5,000.0000 | $10,000.00 | $5,000.0000 | $10,000.00 |
| 680.5003 | Concrete Work Pad 5'x5'x4" | 2 | EACH | $1,500.0000 | $3,000.00 | $800.0000 | $1,600.00 | $5,000.0000 | $10,000.00 | $2,000.0000 | $4,000.00 |
| 680.51000010 | ALTER ELEVATION OF PULL BOXES | 6 | EACH | $750.0000 | $4,500.00 | $600.0000 | $3,600.00 | $2,400.0000 | $14,400.00 | $600.0000 | $3,600.00 |
| 680.510501 | PULLBOX-RECT, 26 X 18 INCH, REINF CONC | 42 | EACH | $2,400.0000 | $100,800.00 | $3,000.0000 | $126,000.00 | $3,700.0000 | $155,400.00 | $3,000.0000 | $126,000.00 |
| 680.51100010 | CLEAN EXISTING PULLBOX | 33 | EACH | $200.0000 | $6,600.00 | $170.0000 | $5,610.00 | $450.0000 | $14,850.00 | $175.0000 | $5,775.00 |
| 680.51200208 | REMOVE JUNCTION BOX FOR DETECTOR LOOPS | 14 | EACH | $1,750.0000 | $24,500.00 | $400.0000 | $5,600.00 | $273.0000 | $3,822.00 | $1,200.0000 | $16,800.00 |
| 680.520106 | CONDUIT, METAL STEEL, ZINC CTD, 2" | 1,086 | LF | $34.0000 | $36,924.00 | $21.0000 | $22,806.00 | $55.0000 | $59,730.00 | $22.0000 | $23,892.00 |
| 680.520108 | CONDUIT, METAL STEEL, ZINC COATED, 3" | 1,358 | LF | $50.0000 | $67,900.00 | $47.0000 | $63,826.00 | $53.0000 | $71,974.00 | $45.0000 | $61,110.00 |
| 680.520110 | CONDUIT, METAL STEEL, ZINC CTD, 4" | 110 | LF | $90.0000 | $9,900.00 | $72.0000 | $7,920.00 | $137.0000 | $15,070.00 | $70.0000 | $7,700.00 |
| 680.53010010 | CLEAN EXISTING CONDUIT | 904 | LF | $7.0000 | $6,328.00 | $10.0000 | $9,040.00 | $13.0000 | $11,752.00 | $10.0000 | $9,040.00 |
| 680.600830 | T.S. POLE-SPAN WIRE 8,000 LBS, 30 FT | 2 | EACH | $15,000.0000 | $30,000.00 | $18,000.0000 | $36,000.00 | $21,000.0000 | $42,000.00 | $18,000.0000 | $36,000.00 |
| 680.600831 | T.S. POLE-SPAN WIRE 8,000 LBS, 31 FT | 1 | EACH | $15,000.0000 | $15,000.00 | $18,000.0000 | $18,000.00 | $21,000.0000 | $21,000.00 | $18,500.0000 | $18,500.00 |
| 680.600832 | T.S. POLE-SPAN WIRE 8,000 LBS, 32 FT | 1 | EACH | $15,000.0000 | $15,000.00 | $18,000.0000 | $18,000.00 | $21,000.0000 | $21,000.00 | $19,000.0000 | $19,000.00 |
| 680.601231 | T.S. POLE-SPAN WIRE 12,000 LBS, 31 FT | 1 | EACH | $18,500.0000 | $18,500.00 | $21,000.0000 | $21,000.00 | $26,000.0000 | $26,000.00 | $21,000.0000 | $21,000.00 |
| 680.601232 | T.S. POLE-SPAN WIRE 12,000 LBS, 32 FT | 1 | EACH | $18,500.0000 | $18,500.00 | $21,000.0000 | $21,000.00 | $26,000.0000 | $26,000.00 | $21,500.0000 | $21,500.00 |
| 680.621960 | T.S. POLE-MAST ARM 19' HT, 60' LONG | 1 | EACH | $30,500.0000 | $30,500.00 | $44,000.0000 | $44,000.00 | $43,000.0000 | $43,000.00 | $42,000.0000 | $42,000.00 |
| 680.622040 | T.S. POLE-MAST ARM 20' HT, 40' LONG | 1 | EACH | $20,900.0000 | $20,900.00 | $23,000.0000 | $23,000.00 | $30,000.0000 | $30,000.00 | $22,000.0000 | $22,000.00 |
| 680.681202 | P.S. POLE-BKET MNT 12 F OV HT ALL | 82 | EACH | $1,725.0000 | $141,450.00 | $2,000.0000 | $164,000.00 | $2,800.0000 | $229,600.00 | $1,950.0000 | $159,900.00 |
| 680.682002 | P.S. POLE-BKET MNT 20 F OV HT ALUMINIUM | 10 | EACH | $1,850.0000 | $18,500.00 | $2,300.0000 | $23,000.00 | $3,000.0000 | $30,000.00 | $2,300.0000 | $23,000.00 |
| 680.7002 | DUAL SP WIRE ASSEMB WI UPPER TETHER WIRE | 5 | EACH | $1,650.0000 | $8,250.00 | $5,100.0000 | $25,500.00 | $2,800.0000 | $14,000.00 | $5,200.0000 | $26,000.00 |
| 680.7004 | MESSENGER ASSEMBLY | 313 | LF | $8.0000 | $2,504.00 | $10.0000 | $3,130.00 | $16.0000 | $5,008.00 | $10.0000 | $3,130.00 |
| 680.700603 | RISER ASSEMBLY, 1" DIAMETER | 1 | EACH | $1,500.0000 | $1,500.00 | $600.0000 | $600.00 | $2,000.0000 | $2,000.00 | $600.0000 | $600.00 |
| 680.730214 | SIGNAL CABLE 2 CONDUCTORS, 14 AWG | 673 | LF | $5.0000 | $3,365.00 | $3.0000 | $2,019.00 | $8.0000 | $5,384.00 | $3.5000 | $2,355.50 |
| 680.730514 | SIGNAL CABLE 5 CONDUCTORS, 14 AWG | 22,600 | LF | $5.2500 | $118,650.00 | $5.0000 | $113,000.00 | $8.0000 | $180,800.00 | $5.0000 | $113,000.00 |
| 680.731014 | SIGNAL CABLE 10 CONDUCTORS, 14 AWG | 1,250 | LF | $7.5000 | $9,375.00 | $10.0000 | $12,500.00 | $11.0000 | $13,750.00 | $9.0000 | $11,250.00 |
| 680.78000001 | MODIFY AND REMOVE TRAF SIGNAL EQUIPMENT | 1 | LS | $3,500.0000 | $3,500.00 | $265.0000 | $265.00 | $8,900.0000 | $8,900.00 | $275.0000 | $275.00 |
| 680.79000001 | REMOVE TRAFFIC SIGNAL EQUIPMENT | 1 | LS | $25,000.0000 | $25,000.00 | $21,000.0000 | $21,000.00 | $144,000.0000 | $144,000.00 | $50,000.0000 | $50,000.00 |
| 680.79300010 | REM TRAF SIG HEAD OR PEDESTRIAN SIG HEAD | 13 | EACH | $135.0000 | $1,755.00 | $150.0000 | $1,950.00 | $190.0000 | $2,470.00 | $150.0000 | $1,950.00 |
| 680.80324515 | INSTALL MICROCOMPUTER CABINET | 17 | EACH | $3,250.0000 | $55,250.00 | $3,500.0000 | $59,500.00 | $6,800.0000 | $115,600.00 | $3,500.0000 | $59,500.00 |
| 680.80324708 | MICROCOMPUTER CABINET BASE (ALUMINUM) | 2 | EACH | $1,275.0000 | $2,550.00 | $1,700.0000 | $3,400.00 | $1,900.0000 | $3,800.00 | $1,750.0000 | $3,500.00 |
| 680.810101 | T.S. MODULE - 12 INCH, RED BALL, LED | 28 | EACH | $155.0000 | $4,340.00 | $100.0000 | $2,800.00 | $222.0000 | $6,216.00 | $100.0000 | $2,800.00 |
| 680.810102 | T.S. MODULE - 12 INCH, RED ARROW, LED | 5 | EACH | $150.0000 | $750.00 | $100.0000 | $500.00 | $213.0000 | $1,065.00 | $100.0000 | $500.00 |
| 680.810103 | T.S. MODULE- 12 INCH, YELLOW BALL LED | 29 | EACH | $160.0000 | $4,640.00 | $100.0000 | $2,900.00 | $233.0000 | $6,757.00 | $100.0000 | $2,900.00 |
| 680.810104 | T.S. MODULE- 12 INCH, YELLOW ARROW LED | 11 | EACH | $155.0000 | $1,705.00 | $100.0000 | $1,100.00 | $219.0000 | $2,409.00 | $100.0000 | $1,100.00 |
| 680.810105 | T.S. MODULE - 12 INCH GREEN BALL, LED | 31 | EACH | $160.0000 | $4,960.00 | $100.0000 | $3,100.00 | $233.0000 | $7,223.00 | $100.0000 | $3,100.00 |
| 680.810106 | T.S. MODULE - 12 INCH GREEN ARROW, LED | 6 | EACH | $155.0000 | $930.00 | $100.0000 | $600.00 | $222.0000 | $1,332.00 | $100.0000 | $600.00 |
| 680.810107 | TRAFFIC SIGNAL SECTION - TYPE I, 12 INCH | 106 | EACH | $290.0000 | $30,740.00 | $500.0000 | $53,000.00 | $457.0000 | $48,442.00 | $500.0000 | $53,000.00 |
| 680.8111 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 1 WAY | 17 | EACH | $600.0000 | $10,200.00 | $350.0000 | $5,950.00 | $908.0000 | $15,436.00 | $350.0000 | $5,950.00 |
| 680.8112 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 2 WAY | 2 | EACH | $850.0000 | $1,700.00 | $800.0000 | $1,600.00 | $1,300.0000 | $2,600.00 | $800.0000 | $1,600.00 |
| 680.81230008 | TRAF SIG BRK ASSEM 1 WAY MST ARM CBL TYP | 11 | EACH | $650.0000 | $7,150.00 | $500.0000 | $5,500.00 | $920.0000 | $10,120.00 | $500.0000 | $5,500.00 |
| 680.813103 | PEDESTRIAN SIG SECTION - TYPE I, 12 INCH | 202 | EACH | $435.0000 | $87,870.00 | $572.0000 | $115,544.00 | $635.0000 | $128,270.00 | $550.0000 | $111,100.00 |
| 680.813105 | PED SIG MOD-12'' BI-MDL HND/MAN SYMB LED | 101 | EACH | $400.0000 | $40,400.00 | $200.0000 | $20,200.00 | $600.0000 | $60,600.00 | $200.0000 | $20,200.00 |
| 680.813108 | PED SIGN SECT,TYP I-16''X18'' LED MODULE | 8 | EACH | $500.0000 | $4,000.00 | $530.0000 | $4,240.00 | $709.0000 | $5,672.00 | $550.0000 | $4,400.00 |
| 680.8141 | PEDESTRIAN SIGNAL BRACKET MOUNT ASSEMBLY | 109 | EACH | $500.0000 | $54,500.00 | $700.0000 | $76,300.00 | $751.0000 | $81,859.00 | $650.0000 | $70,850.00 |
| 680.815001 | Ped Sign Mod 12" Count Timer LED | 101 | EACH | $400.0000 | $40,400.00 | $200.0000 | $20,200.00 | $600.0000 | $60,600.00 | $200.0000 | $20,200.00 |
| 680.815002 | Ped Sign Mod Bi-Modal Hand/Man LED | 8 | EACH | $450.0000 | $3,600.00 | $300.0000 | $2,400.00 | $682.0000 | $5,456.00 | $300.0000 | $2,400.00 |
| 680.8151 | Acces Ped Sign w/o Post | 110 | EACH | $1,625.0000 | $178,750.00 | $1,400.0000 | $154,000.00 | $2,625.0000 | $288,750.00 | $1,500.0000 | $165,000.00 |
| 680.8152 | Acces Ped Sign w Post | 2 | EACH | $3,000.0000 | $6,000.00 | $4,800.0000 | $9,600.00 | $5,600.0000 | $11,200.00 | $5,000.0000 | $10,000.00 |
| 680.8199 | Backplates for Traffic Signal Heads | 31 | EACH | $350.0000 | $10,850.00 | $225.0000 | $6,975.00 | $580.0000 | $17,980.00 | $220.0000 | $6,820.00 |
| 680.8201 | OVERHEAD SIGN ASSEMBLY, TYPE A | 11 | EACH | $780.0000 | $8,580.00 | $1,400.0000 | $15,400.00 | $1,100.0000 | $12,100.00 | $1,300.0000 | $14,300.00 |
| 680.8207 | OVERHEAD SIGN ASSEMBLY, TYPE G | 6 | EACH | $1,000.0000 | $6,000.00 | $1,300.0000 | $7,800.00 | $1,500.0000 | $9,000.00 | $1,200.0000 | $7,200.00 |
| 680.8223 | Breakaway Transformer Base | 92 | EACH | $900.0000 | $82,800.00 | $1,000.0000 | $92,000.00 | $1,400.0000 | $128,800.00 | $1,000.0000 | $92,000.00 |
| 680.82250101 | REM PED PSHBUTN AND SIGN ASSEMB | 19 | EACH | $135.0000 | $2,565.00 | $210.0000 | $3,990.00 | $191.0000 | $3,629.00 | $200.0000 | $3,800.00 |
| 680.82250608 | REM AND DISP PEDESTRIAN POLE AND FOUNDTN | 13 | EACH | $270.0000 | $3,510.00 | $1,900.0000 | $24,700.00 | $376.0000 | $4,888.00 | $1,200.0000 | $15,600.00 |
| 680.82250801 | REMOVE TRAFFIC SIGNAL PULLBOXES | 11 | EACH | $1,200.0000 | $13,200.00 | $1,800.0000 | $19,800.00 | $1,700.0000 | $18,700.00 | $1,500.0000 | $16,500.00 |
| 680.94000008 | TRAFFIC SIGNAL SERVICE ENTRANCE | 3 | EACH | $1,400.0000 | $4,200.00 | $1,700.0000 | $5,100.00 | $2,000.0000 | $6,000.00 | $1,750.0000 | $5,250.00 |
| 680.9499 | Inst Elect Disc/Gen Trans Sw | 10 | EACH | $1,400.0000 | $14,000.00 | $130.0000 | $1,300.00 | $2,000.0000 | $20,000.00 | $125.0000 | $1,250.00 |
| 680.950206 | Electrical Service Cable | 190 | LF | $5.7500 | $1,092.50 | $8.0000 | $1,520.00 | $9.0000 | $1,710.00 | $7.0000 | $1,330.00 |
| 680.99 | Performance Concrete Quality Adjustment | 1 | QU | $10.0000 | $10.00 | $10.0000 | $10.00 | $10.0000 | $10.00 | $10.0000 | $10.00 |
| 680.99050010 | REMOVE POLE MOUNTED SIG CONTROL CABINET | 9 | EACH | $400.0000 | $3,600.00 | $600.0000 | $5,400.00 | $573.0000 | $5,157.00 | $600.0000 | $5,400.00 |
| 680.99060010 | REMOVE GRND MOUNTED SIG CONTROL CABINET | 5 | EACH | $3,000.0000 | $15,000.00 | $4,700.0000 | $23,500.00 | $4,700.0000 | $23,500.00 | $3,750.0000 | $18,750.00 |
| 685.1102 | Wht Epoxy Reflect Pavnt Strip 20 mil | 1,051 | LF | $1.5000 | $1,576.50 | $4.0000 | $4,204.00 | $3.0000 | $3,153.00 | $4.0000 | $4,204.00 |
| 685.1202 | Yell Epoxy Reflect Pavnt Strip 20 mil | 511 | LF | $1.6500 | $843.15 | $4.0000 | $2,044.00 | $3.0000 | $1,533.00 | $4.0000 | $2,044.00 |
| 685.3104 | W Epox Refl pav Spe Str 20 mil Port Hand | 32,215 | LF | $1.6500 | $53,154.75 | $4.0000 | $128,860.00 | $2.3000 | $74,094.50 | $4.0000 | $128,860.00 |
| 685.3304 | W Epox Refl pav Letters 20 mil Port Hand | 20 | EACH | $220.0000 | $4,400.00 | $156.0000 | $3,120.00 | $164.0000 | $3,280.00 | $130.0000 | $2,600.00 |
| 685.3404 | W Epox Refl pav Symbols 20 mil Port Hand | 13 | EACH | $220.0000 | $2,860.00 | $190.0000 | $2,470.00 | $164.0000 | $2,132.00 | $160.0000 | $2,080.00 |
| 697.03 | FIELD CHANGE PAYMENT | 409,000 | DC | $1.0000 | $409,000.00 | $1.0000 | $409,000.00 | $1.0000 | $409,000.00 | $1.0000 | $409,000.00 |
| 698.04 | ASPHALT PRICE ADJUSTMENT | 1,000 | DC | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 |
| 698.05 | FUEL PRICE ADJUSTMENT | 1,100 | DC | $1.0000 | $1,100.00 | $1.0000 | $1,100.00 | $1.0000 | $1,100.00 | $1.0000 | $1,100.00 |
| 698.06 | STEEL/IRON PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 699.040001 | MOBILIZATION | 1 | LS | $243,000.0000 | $243,000.00 | $260,000.0000 | $260,000.00 | $300,000.0000 | $300,000.00 | $375,000.0000 | $375,000.00 |
Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.