NY New York DOT · Bid Tabulation

Contract D265529

HIGHWAY PEDESTRIAN SAFETY IMPROVEMENTS - Various Locations

County
Westchester
Letting
January 22, 2026
Bidders
4
Apparent low bid VERDE ELECTRIC MAINTENANCE CORP $6,754,552.26
Other bidders NORTHBROOK CONTRACTING CORP $6,938,000.01 MORANO BROTHERS CORP $8,420,541.59 TRIUMPH CONSTRUCTION CORP $9,774,242.51

Bid Items - unit price and extension by bidder

Item Description Qty UOM VERDE ELECTRIC MAINTENANCE CORP $6,754,552.26 NORTHBROOK CONTRACTING CORP $6,938,000.01 MORANO BROTHERS CORP $8,420,541.59 TRIUMPH CONSTRUCTION CORP $9,774,242.51
Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
201.07010004 CLEARING AND GRUBBING AND TREE TRIMMING 7 EACH $5,850.0000 $40,950.00 $1,700.0000 $11,900.00 $5,500.0000 $38,500.00 $10,000.0000 $70,000.00
203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL 926 CY $365.0000 $337,990.00 $235.0000 $217,610.00 $300.0000 $277,800.00 $100.0000 $92,600.00
203.03 EMBANKMENT IN PLACE 246 CY $135.0000 $33,210.00 $185.0000 $45,510.00 $196.0000 $48,216.00 $25.0000 $6,150.00
203.07 SELECT GRANULAR FILL 109 CY $68.0000 $7,412.00 $180.0000 $19,620.00 $196.0000 $21,364.00 $40.0000 $4,360.00
206.0201 TRENCH AND CULVERT EXCAVATION 144 CY $25.0000 $3,600.00 $370.0000 $53,280.00 $70.0000 $10,080.00 $500.0000 $72,000.00
206.03 CONDUIT EXCAV & BACKFL INC/SURFACE RESTR 2,549 LF $95.0000 $242,155.00 $126.0000 $321,174.00 $182.0000 $463,918.00 $150.0000 $382,350.00
206.05 TEST PIT EXCAVATION 102 EACH $1,500.0000 $153,000.00 $910.0000 $92,820.00 $2,375.0000 $242,250.00 $700.0000 $71,400.00
209.100101 MULCH - TEMPORARY 1,166 SY $3.6500 $4,255.90 $1.0000 $1,166.00 $0.5500 $641.30 $16.0000 $18,656.00
209.1003 SEED AND MULCH - TEMPORARY 626 SY $3.6500 $2,284.90 $6.0000 $3,756.00 $3.0000 $1,878.00 $20.0000 $12,520.00
304.11000008 SUBBASE COURSE (MODIFIED) 714 CY $125.0000 $89,250.00 $350.0000 $249,900.00 $150.0000 $107,100.00 $200.0000 $142,800.00
404.0983 9.5 F3 Top Cour Asph 80 Ser Comp 65 TON $425.0000 $27,625.00 $875.0000 $56,875.00 $253.0000 $16,445.00 $250.0000 $16,250.00
404.1989 19 F9 Binder Cour Asph 80 Ser Comp 36 TON $400.0000 $14,400.00 $415.0000 $14,940.00 $349.0000 $12,564.00 $250.0000 $9,000.00
404.3789 37.5 F9 Base Cour Asph 80 Ser Comp 72 TON $395.0000 $28,440.00 $300.0000 $21,600.00 $306.0000 $22,032.00 $250.0000 $18,000.00
407.0103 STRAIGHT TACK COAT 54 GAL $60.0000 $3,240.00 $56.0000 $3,024.00 $33.0000 $1,782.00 $30.0000 $1,620.00
418.7603 ASPHALT PAVEMENT JOINT ADHESIVE 3,612 LF $2.7500 $9,933.00 $2.0000 $7,224.00 $3.6000 $13,003.20 $35.0000 $126,420.00
503.1013 PCC Foundation for Pavement, PEM 120 CY $1,070.0000 $128,400.00 $350.0000 $42,000.00 $359.0000 $43,080.00 $1,500.0000 $180,000.00
520.50000004 SAWING CONCRETE 66 LF $7.2500 $478.50 $41.0000 $2,706.00 $7.3000 $481.80 $11.0000 $726.00
552.17 SHIELDS AND SHORING 224 SF $85.0000 $19,040.00 $9.0000 $2,016.00 $53.0000 $11,872.00 $5.0000 $1,120.00
555.0021 Concrete for Structures, Performance 1.11 CY $2,420.0000 $2,686.20 $1,200.0000 $1,332.00 $1,963.0000 $2,178.93 $7,000.0000 $7,770.00
555.9902 Performance Concrete Quality F Struct 1 QU $15.0000 $15.00 $15.0000 $15.00 $15.0000 $15.00 $15.0000 $15.00
557.30 SIDEWALKS AND SAFETY WALKS 61 SY $310.0000 $18,910.00 $200.0000 $12,200.00 $472.0000 $28,792.00 $1,500.0000 $91,500.00
557.9902 Performance Concrete Quality Adjustment 1 QU $27.0100 $27.01 $27.0100 $27.01 $27.0100 $27.01 $27.0100 $27.01
580.01 REMOVAL OF STRUCTURAL CONCRETE 20 CY $730.0000 $14,600.00 $1,500.0000 $30,000.00 $1,250.0000 $25,000.00 $300.0000 $6,000.00
586.0201 DRILL GROUT BOLTS OR REINFORMENT BARS 30 EACH $100.0000 $3,000.00 $140.0000 $4,200.00 $103.0000 $3,090.00 $130.0000 $3,900.00
603.6001 REINF CONC PIPE CLASS III, 12 DIA 26 LF $1,080.0000 $28,080.00 $45.0000 $1,170.00 $270.0000 $7,020.00 $50.0000 $1,300.00
603.6002 REINF CONC PIPE CLASS III, 15 DIA 83 LF $425.0000 $35,275.00 $40.0000 $3,320.00 $250.0000 $20,750.00 $50.0000 $4,150.00
603.77 CONCRETE COLLARS 1 EACH $2,180.0000 $2,180.00 $2,600.0000 $2,600.00 $1,100.0000 $1,100.00 $4,500.0000 $4,500.00
604.070801 ALTER DRAIN STRUC, LEACH BASINS AND MHS 8 EACH $4,360.0000 $34,880.00 $1,300.0000 $10,400.00 $1,500.0000 $12,000.00 $5,000.0000 $40,000.00
604.300103 RECT DRAIN STRUC (TY A) #3 WELDED FRM 21 LF $1,620.0000 $34,020.00 $500.0000 $10,500.00 $2,200.0000 $46,200.00 $500.0000 $10,500.00
604.300203 RECT DRAIN STRUC TY B FOR #3 WELDED FRM 4 LF $1,690.0000 $6,760.00 $550.0000 $2,200.00 $1,900.0000 $7,600.00 $550.0000 $2,200.00
604.310132 RECT DRAIN STRU TY A -RND OPT RND MH FRM 4 LF $2,590.0000 $10,360.00 $400.0000 $1,600.00 $1,900.0000 $7,600.00 $475.0000 $1,900.00
606.10 BOX BEAM GUIDE RAILING 165 LF $135.0000 $22,275.00 $130.0000 $21,450.00 $220.0000 $36,300.00 $80.0000 $13,200.00
606.100003 BOX BEAM GUIDE RAILING (SHOP MITERED) 7 LF $250.0000 $1,750.00 $165.0000 $1,155.00 $330.0000 $2,310.00 $400.0000 $2,800.00
606.120101 BOX BEAM END PIECE 1 EACH $2,200.0000 $2,200.00 $1,500.0000 $1,500.00 $1,000.0000 $1,000.00 $1,250.0000 $1,250.00
606.22 ANCHORAGE UNITS FOR CORR BM GUIDERAILING 1 EACH $3,850.0000 $3,850.00 $15,000.0000 $15,000.00 $3,300.0000 $3,300.00 $6,500.0000 $6,500.00
606.270101 HPBO MOD CORG BEAM GUIDE RAIL SHOP CURVE 47 LF $82.0000 $3,854.00 $87.0000 $4,089.00 $270.0000 $12,690.00 $250.0000 $11,750.00
606.2703 ANCH UNITS HPBO MOD CORG BEAM GUIDE RAIL 1 EACH $4,290.0000 $4,290.00 $7,500.0000 $7,500.00 $3,900.0000 $3,900.00 $6,500.0000 $6,500.00
606.3062 SNGL-SLOPE CONC HALF SEC BARR (PRECAST) 66 LF $440.0000 $29,040.00 $225.0000 $14,850.00 $344.0000 $22,704.00 $120.0000 $7,920.00
606.53 RESETTING BOX BEAM GUIDE RAILING 60 LF $172.0000 $10,320.00 $77.0000 $4,620.00 $976.0000 $58,560.00 $180.0000 $10,800.00
606.71 REMOVING AND DISP CORR BEAM GUIDERAILING 101 LF $9.0000 $909.00 $34.0000 $3,434.00 $40.0000 $4,040.00 $16.0000 $1,616.00
606.73 REMOVING AND DISP BOX BEAM GUIDERAILING 243 LF $9.0000 $2,187.00 $27.0000 $6,561.00 $42.0000 $10,206.00 $9.0000 $2,187.00
606.8803 TRANS BX BM GR TO SNGL SLP 1/2 SEC CON B 1 EACH $17,600.0000 $17,600.00 $20,000.0000 $20,000.00 $17,000.0000 $17,000.00 $13,000.0000 $13,000.00
606.8903 TRNS HPBO MOD COR BM GR SNG-SL CON HF SB 1 EACH $14,850.0000 $14,850.00 $10,000.0000 $10,000.00 $13,000.0000 $13,000.00 $10,000.0000 $10,000.00
607.96000008 REMOVE AND DISPOSE OF EXISTING FENCE 9 LF $200.0000 $1,800.00 $35.0000 $315.00 $137.0000 $1,233.00 $100.0000 $900.00
607.97000008 REMOVE AND RESET EXISTING FENCE 20 LF $200.0000 $4,000.00 $125.0000 $2,500.00 $221.0000 $4,420.00 $200.0000 $4,000.00
608.0101 CONCRETE SIDEWALKS AND DRIVEWAYS 202 CY $1,100.0000 $222,200.00 $2,100.0000 $424,200.00 $1,500.0000 $303,000.00 $5,000.0000 $1,010,000.00
608.020102 ASP SIDE W, DRVWAY, BICY PATH, VEG CON S 63 TON $440.0000 $27,720.00 $350.0000 $22,050.00 $309.0000 $19,467.00 $350.0000 $22,050.00
608.21000003 CAST IRON EMBEDDED DETECTABLE WARN UNITS 157 SY $425.0000 $66,725.00 $500.0000 $78,500.00 $374.0000 $58,718.00 $300.0000 $47,100.00
609.0212 Stone Curb Near Vertical Face (NVF) 1,190 LF $225.5000 $268,345.00 $225.0000 $267,750.00 $110.0000 $130,900.00 $400.0000 $476,000.00
609.0401 CAST-IN-PLACE CONCRETE CURB TYPE VF6 1,992 LF $121.0000 $241,032.00 $190.0000 $378,480.00 $74.0000 $147,408.00 $350.0000 $697,200.00
610.1605 Turf Estabment Performance 555 SY $27.0000 $14,985.00 $40.0000 $22,200.00 $3.0000 $1,665.00 $26.0000 $14,430.00
614.060204 TREE REMV >6" - 12" DIA BREAST HEIGHT 1 EACH $2,790.0000 $2,790.00 $3,200.0000 $3,200.00 $3,200.0000 $3,200.00 $4,000.0000 $4,000.00
619.01 BASIC WORK ZONE TRAFFIC CONTROL 1 LS $785,000.0000 $785,000.00 $550,681.0000 $550,681.00 $900,000.0000 $900,000.00 $2,000,000.0000 $2,000,000.00
619.0804 COVER EXIST PVMT MARK LTRS OR SYM (TAPE) 10 EACH $155.0000 $1,550.00 $200.0000 $2,000.00 $785.0000 $7,850.00 $160.0000 $1,600.00
619.1612 MAINTAIN TRAF SIG EQUIP (REQUIREMENT B) 60 INTM $200.0000 $12,000.00 $400.0000 $24,000.00 $270.0000 $16,200.00 $550.0000 $33,000.00
621.04 CLEANING DRAINAGE STRUCTURES 1 EACH $485.0000 $485.00 $1,100.0000 $1,100.00 $460.0000 $460.00 $7,500.0000 $7,500.00
625.01 SURVEY OPERATIONS 1 LS $215,050.0000 $215,050.00 $98,000.0000 $98,000.00 $305,000.0000 $305,000.00 $200,000.0000 $200,000.00
625.04 CONCRETE RIGHT-OF-WAY MARKER TYPE L (LOW 16 EACH $1,460.0000 $23,360.00 $2,000.0000 $32,000.00 $765.0000 $12,240.00 $1,000.0000 $16,000.00
625.05 STEEL PIN AND CAP RIGHT-OF-WAY MARKER 13 EACH $730.0000 $9,490.00 $200.0000 $2,600.00 $850.0000 $11,050.00 $1,500.0000 $19,500.00
627.50140008 CUTTING PAVEMENT 398 LF $5.5000 $2,189.00 $30.0000 $11,940.00 $5.0000 $1,990.00 $13.0000 $5,174.00
635.0103 CLEANING AND PREP OF PAVE SURFS - LINES 24,449 LF $1.6500 $40,340.85 $3.0000 $73,347.00 $1.6500 $40,340.85 $4.0000 $97,796.00
635.0203 CLEANING AND PREP OF PAVE SURFS - LETS 24 EACH $165.0000 $3,960.00 $175.0000 $4,200.00 $55.0000 $1,320.00 $150.0000 $3,600.00
635.0303 CLN AND PREP OF PAVE SURFS - SYMBOLS 6 EACH $165.0000 $990.00 $250.0000 $1,500.00 $55.0000 $330.00 $175.0000 $1,050.00
637.04 Concrete Cylinder Curing Equipment 1 EACH $11,500.0000 $11,500.00 $2,000.0000 $2,000.00 $7,088.0000 $7,088.00 $3,500.0000 $3,500.00
637.11 ENGINEER'S FIELD OFFICE - TYPE 1 24 MNTH $5,765.0000 $138,360.00 $2,500.0000 $60,000.00 $8,700.0000 $208,800.00 $3,250.0000 $78,000.00
637.34 OFFICE TECHNOLOGY AND SUPPLIES 5,000 DC $1.0000 $5,000.00 $1.0000 $5,000.00 $1.0000 $5,000.00 $1.0000 $5,000.00
637.36 CONSTRUCTION TESTING SUPPLY CONSUMABLES 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
637.41000115 DIGITAL INSPECTION DEVICE 24 MNTH $200.0000 $4,800.00 $1,500.0000 $36,000.00 $200.0000 $4,800.00 $750.0000 $18,000.00
645.5102 GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR 80 SF $70.0000 $5,600.00 $25.0000 $2,000.00 $112.0000 $8,960.00 $80.0000 $6,400.00
645.81 TYPE A SIGN POSTS 41 EACH $485.0000 $19,885.00 $200.0000 $8,200.00 $275.0000 $11,275.00 $400.0000 $16,400.00
647.31 RELOC SIGN PANEL ASEMB SZ I UNDER 30SF 25 EACH $275.0000 $6,875.00 $135.0000 $3,375.00 $175.0000 $4,375.00 $127.0000 $3,175.00
647.51 REMV DISP SIGN PANEL ASEMB SZ I UND 30SF 8 EACH $55.0000 $440.00 $135.0000 $1,080.00 $175.0000 $1,400.00 $380.0000 $3,040.00
647.61 REMV DISP GR MT TY A SUP FND SIGN SZ I 32 EACH $110.0000 $3,520.00 $135.0000 $4,320.00 $154.0000 $4,928.00 $440.0000 $14,080.00
654.5020 EXPEND IMPCT ATTNUOR TL 2, <=2 FT OBS WI 2 EACH $40,150.0000 $80,300.00 $20,000.0000 $40,000.00 $43,000.0000 $86,000.00 $50,000.0000 $100,000.00
655.1103 WELDED FRAME AND RETICULINE GRATE 3 9 EACH $2,200.0000 $19,800.00 $1,500.0000 $13,500.00 $2,400.0000 $21,600.00 $610.0000 $5,490.00
655.1201 MANHOLE FRAME AND GRATE 1 EACH $2,200.0000 $2,200.00 $1,500.0000 $1,500.00 $2,000.0000 $2,000.00 $675.0000 $675.00
655.1202 MANHOLE FRAME AND COVER 5 EACH $2,420.0000 $12,100.00 $900.0000 $4,500.00 $1,700.0000 $8,500.00 $700.0000 $3,500.00
662.60000108 FURNISHING ELECTRICAL SERVICE 3,000 DC $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00
662.60030008 ALTERING ELEVATION OF GAS VALVE BOXES 1 EACH $415.0000 $415.00 $300.0000 $300.00 $350.0000 $350.00 $2,000.0000 $2,000.00
663.31 RELOCATE EXISTING HYDRANT 1 EACH $14,000.0000 $14,000.00 $15,000.0000 $15,000.00 $9,800.0000 $9,800.00 $7,500.0000 $7,500.00
680.05010007 360 Degree Camera Video Detection System 11 EACH $26,525.0000 $291,775.00 $35,000.0000 $385,000.00 $36,000.0000 $396,000.00 $35,000.0000 $385,000.00
680.05020007 360 Degree Camera Assembly 11 EACH $4,500.0000 $49,500.00 $5,000.0000 $55,000.00 $6,400.0000 $70,400.00 $5,500.0000 $60,500.00
680.10040001 POWDER COATING TRAFFIC SIGNAL POLE - PED 9 EACH $490.0000 $4,410.00 $525.0000 $4,725.00 $1,000.0000 $9,000.00 $550.0000 $4,950.00
680.5001 POLE EXCAVATION AND CONCRETE FOUNDATION 136 CY $3,800.0000 $516,800.00 $4,200.0000 $571,200.00 $5,800.0000 $788,800.00 $3,000.0000 $408,000.00
680.5002 CONCRETE BASE FOR CONTROLLER CABINET 2 EACH $2,500.0000 $5,000.00 $4,500.0000 $9,000.00 $5,000.0000 $10,000.00 $5,000.0000 $10,000.00
680.5003 Concrete Work Pad 5'x5'x4" 2 EACH $1,500.0000 $3,000.00 $800.0000 $1,600.00 $5,000.0000 $10,000.00 $2,000.0000 $4,000.00
680.51000010 ALTER ELEVATION OF PULL BOXES 6 EACH $750.0000 $4,500.00 $600.0000 $3,600.00 $2,400.0000 $14,400.00 $600.0000 $3,600.00
680.510501 PULLBOX-RECT, 26 X 18 INCH, REINF CONC 42 EACH $2,400.0000 $100,800.00 $3,000.0000 $126,000.00 $3,700.0000 $155,400.00 $3,000.0000 $126,000.00
680.51100010 CLEAN EXISTING PULLBOX 33 EACH $200.0000 $6,600.00 $170.0000 $5,610.00 $450.0000 $14,850.00 $175.0000 $5,775.00
680.51200208 REMOVE JUNCTION BOX FOR DETECTOR LOOPS 14 EACH $1,750.0000 $24,500.00 $400.0000 $5,600.00 $273.0000 $3,822.00 $1,200.0000 $16,800.00
680.520106 CONDUIT, METAL STEEL, ZINC CTD, 2" 1,086 LF $34.0000 $36,924.00 $21.0000 $22,806.00 $55.0000 $59,730.00 $22.0000 $23,892.00
680.520108 CONDUIT, METAL STEEL, ZINC COATED, 3" 1,358 LF $50.0000 $67,900.00 $47.0000 $63,826.00 $53.0000 $71,974.00 $45.0000 $61,110.00
680.520110 CONDUIT, METAL STEEL, ZINC CTD, 4" 110 LF $90.0000 $9,900.00 $72.0000 $7,920.00 $137.0000 $15,070.00 $70.0000 $7,700.00
680.53010010 CLEAN EXISTING CONDUIT 904 LF $7.0000 $6,328.00 $10.0000 $9,040.00 $13.0000 $11,752.00 $10.0000 $9,040.00
680.600830 T.S. POLE-SPAN WIRE 8,000 LBS, 30 FT 2 EACH $15,000.0000 $30,000.00 $18,000.0000 $36,000.00 $21,000.0000 $42,000.00 $18,000.0000 $36,000.00
680.600831 T.S. POLE-SPAN WIRE 8,000 LBS, 31 FT 1 EACH $15,000.0000 $15,000.00 $18,000.0000 $18,000.00 $21,000.0000 $21,000.00 $18,500.0000 $18,500.00
680.600832 T.S. POLE-SPAN WIRE 8,000 LBS, 32 FT 1 EACH $15,000.0000 $15,000.00 $18,000.0000 $18,000.00 $21,000.0000 $21,000.00 $19,000.0000 $19,000.00
680.601231 T.S. POLE-SPAN WIRE 12,000 LBS, 31 FT 1 EACH $18,500.0000 $18,500.00 $21,000.0000 $21,000.00 $26,000.0000 $26,000.00 $21,000.0000 $21,000.00
680.601232 T.S. POLE-SPAN WIRE 12,000 LBS, 32 FT 1 EACH $18,500.0000 $18,500.00 $21,000.0000 $21,000.00 $26,000.0000 $26,000.00 $21,500.0000 $21,500.00
680.621960 T.S. POLE-MAST ARM 19' HT, 60' LONG 1 EACH $30,500.0000 $30,500.00 $44,000.0000 $44,000.00 $43,000.0000 $43,000.00 $42,000.0000 $42,000.00
680.622040 T.S. POLE-MAST ARM 20' HT, 40' LONG 1 EACH $20,900.0000 $20,900.00 $23,000.0000 $23,000.00 $30,000.0000 $30,000.00 $22,000.0000 $22,000.00
680.681202 P.S. POLE-BKET MNT 12 F OV HT ALL 82 EACH $1,725.0000 $141,450.00 $2,000.0000 $164,000.00 $2,800.0000 $229,600.00 $1,950.0000 $159,900.00
680.682002 P.S. POLE-BKET MNT 20 F OV HT ALUMINIUM 10 EACH $1,850.0000 $18,500.00 $2,300.0000 $23,000.00 $3,000.0000 $30,000.00 $2,300.0000 $23,000.00
680.7002 DUAL SP WIRE ASSEMB WI UPPER TETHER WIRE 5 EACH $1,650.0000 $8,250.00 $5,100.0000 $25,500.00 $2,800.0000 $14,000.00 $5,200.0000 $26,000.00
680.7004 MESSENGER ASSEMBLY 313 LF $8.0000 $2,504.00 $10.0000 $3,130.00 $16.0000 $5,008.00 $10.0000 $3,130.00
680.700603 RISER ASSEMBLY, 1" DIAMETER 1 EACH $1,500.0000 $1,500.00 $600.0000 $600.00 $2,000.0000 $2,000.00 $600.0000 $600.00
680.730214 SIGNAL CABLE 2 CONDUCTORS, 14 AWG 673 LF $5.0000 $3,365.00 $3.0000 $2,019.00 $8.0000 $5,384.00 $3.5000 $2,355.50
680.730514 SIGNAL CABLE 5 CONDUCTORS, 14 AWG 22,600 LF $5.2500 $118,650.00 $5.0000 $113,000.00 $8.0000 $180,800.00 $5.0000 $113,000.00
680.731014 SIGNAL CABLE 10 CONDUCTORS, 14 AWG 1,250 LF $7.5000 $9,375.00 $10.0000 $12,500.00 $11.0000 $13,750.00 $9.0000 $11,250.00
680.78000001 MODIFY AND REMOVE TRAF SIGNAL EQUIPMENT 1 LS $3,500.0000 $3,500.00 $265.0000 $265.00 $8,900.0000 $8,900.00 $275.0000 $275.00
680.79000001 REMOVE TRAFFIC SIGNAL EQUIPMENT 1 LS $25,000.0000 $25,000.00 $21,000.0000 $21,000.00 $144,000.0000 $144,000.00 $50,000.0000 $50,000.00
680.79300010 REM TRAF SIG HEAD OR PEDESTRIAN SIG HEAD 13 EACH $135.0000 $1,755.00 $150.0000 $1,950.00 $190.0000 $2,470.00 $150.0000 $1,950.00
680.80324515 INSTALL MICROCOMPUTER CABINET 17 EACH $3,250.0000 $55,250.00 $3,500.0000 $59,500.00 $6,800.0000 $115,600.00 $3,500.0000 $59,500.00
680.80324708 MICROCOMPUTER CABINET BASE (ALUMINUM) 2 EACH $1,275.0000 $2,550.00 $1,700.0000 $3,400.00 $1,900.0000 $3,800.00 $1,750.0000 $3,500.00
680.810101 T.S. MODULE - 12 INCH, RED BALL, LED 28 EACH $155.0000 $4,340.00 $100.0000 $2,800.00 $222.0000 $6,216.00 $100.0000 $2,800.00
680.810102 T.S. MODULE - 12 INCH, RED ARROW, LED 5 EACH $150.0000 $750.00 $100.0000 $500.00 $213.0000 $1,065.00 $100.0000 $500.00
680.810103 T.S. MODULE- 12 INCH, YELLOW BALL LED 29 EACH $160.0000 $4,640.00 $100.0000 $2,900.00 $233.0000 $6,757.00 $100.0000 $2,900.00
680.810104 T.S. MODULE- 12 INCH, YELLOW ARROW LED 11 EACH $155.0000 $1,705.00 $100.0000 $1,100.00 $219.0000 $2,409.00 $100.0000 $1,100.00
680.810105 T.S. MODULE - 12 INCH GREEN BALL, LED 31 EACH $160.0000 $4,960.00 $100.0000 $3,100.00 $233.0000 $7,223.00 $100.0000 $3,100.00
680.810106 T.S. MODULE - 12 INCH GREEN ARROW, LED 6 EACH $155.0000 $930.00 $100.0000 $600.00 $222.0000 $1,332.00 $100.0000 $600.00
680.810107 TRAFFIC SIGNAL SECTION - TYPE I, 12 INCH 106 EACH $290.0000 $30,740.00 $500.0000 $53,000.00 $457.0000 $48,442.00 $500.0000 $53,000.00
680.8111 TRAFFIC SIGNAL BRACKET ASSEMBLY - 1 WAY 17 EACH $600.0000 $10,200.00 $350.0000 $5,950.00 $908.0000 $15,436.00 $350.0000 $5,950.00
680.8112 TRAFFIC SIGNAL BRACKET ASSEMBLY - 2 WAY 2 EACH $850.0000 $1,700.00 $800.0000 $1,600.00 $1,300.0000 $2,600.00 $800.0000 $1,600.00
680.81230008 TRAF SIG BRK ASSEM 1 WAY MST ARM CBL TYP 11 EACH $650.0000 $7,150.00 $500.0000 $5,500.00 $920.0000 $10,120.00 $500.0000 $5,500.00
680.813103 PEDESTRIAN SIG SECTION - TYPE I, 12 INCH 202 EACH $435.0000 $87,870.00 $572.0000 $115,544.00 $635.0000 $128,270.00 $550.0000 $111,100.00
680.813105 PED SIG MOD-12'' BI-MDL HND/MAN SYMB LED 101 EACH $400.0000 $40,400.00 $200.0000 $20,200.00 $600.0000 $60,600.00 $200.0000 $20,200.00
680.813108 PED SIGN SECT,TYP I-16''X18'' LED MODULE 8 EACH $500.0000 $4,000.00 $530.0000 $4,240.00 $709.0000 $5,672.00 $550.0000 $4,400.00
680.8141 PEDESTRIAN SIGNAL BRACKET MOUNT ASSEMBLY 109 EACH $500.0000 $54,500.00 $700.0000 $76,300.00 $751.0000 $81,859.00 $650.0000 $70,850.00
680.815001 Ped Sign Mod 12" Count Timer LED 101 EACH $400.0000 $40,400.00 $200.0000 $20,200.00 $600.0000 $60,600.00 $200.0000 $20,200.00
680.815002 Ped Sign Mod Bi-Modal Hand/Man LED 8 EACH $450.0000 $3,600.00 $300.0000 $2,400.00 $682.0000 $5,456.00 $300.0000 $2,400.00
680.8151 Acces Ped Sign w/o Post 110 EACH $1,625.0000 $178,750.00 $1,400.0000 $154,000.00 $2,625.0000 $288,750.00 $1,500.0000 $165,000.00
680.8152 Acces Ped Sign w Post 2 EACH $3,000.0000 $6,000.00 $4,800.0000 $9,600.00 $5,600.0000 $11,200.00 $5,000.0000 $10,000.00
680.8199 Backplates for Traffic Signal Heads 31 EACH $350.0000 $10,850.00 $225.0000 $6,975.00 $580.0000 $17,980.00 $220.0000 $6,820.00
680.8201 OVERHEAD SIGN ASSEMBLY, TYPE A 11 EACH $780.0000 $8,580.00 $1,400.0000 $15,400.00 $1,100.0000 $12,100.00 $1,300.0000 $14,300.00
680.8207 OVERHEAD SIGN ASSEMBLY, TYPE G 6 EACH $1,000.0000 $6,000.00 $1,300.0000 $7,800.00 $1,500.0000 $9,000.00 $1,200.0000 $7,200.00
680.8223 Breakaway Transformer Base 92 EACH $900.0000 $82,800.00 $1,000.0000 $92,000.00 $1,400.0000 $128,800.00 $1,000.0000 $92,000.00
680.82250101 REM PED PSHBUTN AND SIGN ASSEMB 19 EACH $135.0000 $2,565.00 $210.0000 $3,990.00 $191.0000 $3,629.00 $200.0000 $3,800.00
680.82250608 REM AND DISP PEDESTRIAN POLE AND FOUNDTN 13 EACH $270.0000 $3,510.00 $1,900.0000 $24,700.00 $376.0000 $4,888.00 $1,200.0000 $15,600.00
680.82250801 REMOVE TRAFFIC SIGNAL PULLBOXES 11 EACH $1,200.0000 $13,200.00 $1,800.0000 $19,800.00 $1,700.0000 $18,700.00 $1,500.0000 $16,500.00
680.94000008 TRAFFIC SIGNAL SERVICE ENTRANCE 3 EACH $1,400.0000 $4,200.00 $1,700.0000 $5,100.00 $2,000.0000 $6,000.00 $1,750.0000 $5,250.00
680.9499 Inst Elect Disc/Gen Trans Sw 10 EACH $1,400.0000 $14,000.00 $130.0000 $1,300.00 $2,000.0000 $20,000.00 $125.0000 $1,250.00
680.950206 Electrical Service Cable 190 LF $5.7500 $1,092.50 $8.0000 $1,520.00 $9.0000 $1,710.00 $7.0000 $1,330.00
680.99 Performance Concrete Quality Adjustment 1 QU $10.0000 $10.00 $10.0000 $10.00 $10.0000 $10.00 $10.0000 $10.00
680.99050010 REMOVE POLE MOUNTED SIG CONTROL CABINET 9 EACH $400.0000 $3,600.00 $600.0000 $5,400.00 $573.0000 $5,157.00 $600.0000 $5,400.00
680.99060010 REMOVE GRND MOUNTED SIG CONTROL CABINET 5 EACH $3,000.0000 $15,000.00 $4,700.0000 $23,500.00 $4,700.0000 $23,500.00 $3,750.0000 $18,750.00
685.1102 Wht Epoxy Reflect Pavnt Strip 20 mil 1,051 LF $1.5000 $1,576.50 $4.0000 $4,204.00 $3.0000 $3,153.00 $4.0000 $4,204.00
685.1202 Yell Epoxy Reflect Pavnt Strip 20 mil 511 LF $1.6500 $843.15 $4.0000 $2,044.00 $3.0000 $1,533.00 $4.0000 $2,044.00
685.3104 W Epox Refl pav Spe Str 20 mil Port Hand 32,215 LF $1.6500 $53,154.75 $4.0000 $128,860.00 $2.3000 $74,094.50 $4.0000 $128,860.00
685.3304 W Epox Refl pav Letters 20 mil Port Hand 20 EACH $220.0000 $4,400.00 $156.0000 $3,120.00 $164.0000 $3,280.00 $130.0000 $2,600.00
685.3404 W Epox Refl pav Symbols 20 mil Port Hand 13 EACH $220.0000 $2,860.00 $190.0000 $2,470.00 $164.0000 $2,132.00 $160.0000 $2,080.00
697.03 FIELD CHANGE PAYMENT 409,000 DC $1.0000 $409,000.00 $1.0000 $409,000.00 $1.0000 $409,000.00 $1.0000 $409,000.00
698.04 ASPHALT PRICE ADJUSTMENT 1,000 DC $1.0000 $1,000.00 $1.0000 $1,000.00 $1.0000 $1,000.00 $1.0000 $1,000.00
698.05 FUEL PRICE ADJUSTMENT 1,100 DC $1.0000 $1,100.00 $1.0000 $1,100.00 $1.0000 $1,100.00 $1.0000 $1,100.00
698.06 STEEL/IRON PRICE ADJUSTMENT 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
699.040001 MOBILIZATION 1 LS $243,000.0000 $243,000.00 $260,000.0000 $260,000.00 $300,000.0000 $300,000.00 $375,000.0000 $375,000.00

Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.

Want the analysis, not just the numbers? DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel. Explore DOTestimate →