NY
New York DOT · Bid Tabulation
Contract D265531
PEDESTRIAN SAFETY IMPROVEMENTS - Various Locations
- County
- Dutchess, Orange, Putnam, Rockland
- Letting
- January 22, 2026
- Bidders
- 3
Apparent low bid
VERDE ELECTRIC MAINTENANCE CORP
$4,665,730.15
Other bidders
MORANO BROTHERS CORP
$5,217,249.00
NORTHBROOK CONTRACTING CORP
$5,325,000.00
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | VERDE ELECTRIC MAINTENANCE CORP $4,665,730.15 | MORANO BROTHERS CORP $5,217,249.00 | NORTHBROOK CONTRACTING CORP $5,325,000.00 | |||
|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201.07010004 | CLEARING AND GRUBBING AND TREE TRIMMING | 3 | EACH | $5,560.0000 | $16,680.00 | $8,000.0000 | $24,000.00 | $7,000.0000 | $21,000.00 |
| 203.02 | UNCLASSIFIED EXCAVATION AND DISPOSAL | 521 | CY | $400.0000 | $208,400.00 | $325.0000 | $169,325.00 | $375.0000 | $195,375.00 |
| 203.03 | EMBANKMENT IN PLACE | 257 | CY | $181.5000 | $46,645.50 | $180.0000 | $46,260.00 | $165.0000 | $42,405.00 |
| 203.07 | SELECT GRANULAR FILL | 34 | CY | $48.5000 | $1,649.00 | $50.0000 | $1,700.00 | $145.0000 | $4,930.00 |
| 206.0201 | TRENCH AND CULVERT EXCAVATION | 52 | CY | $24.2500 | $1,261.00 | $59.0000 | $3,068.00 | $175.0000 | $9,100.00 |
| 206.03 | CONDUIT EXCAV & BACKFL INC/SURFACE RESTR | 2,201 | LF | $95.0000 | $209,095.00 | $100.0000 | $220,100.00 | $140.0000 | $308,140.00 |
| 206.05 | TEST PIT EXCAVATION | 75 | EACH | $1,500.0000 | $112,500.00 | $1,500.0000 | $112,500.00 | $1,900.0000 | $142,500.00 |
| 207.24 | GEOTEXTILE STABILIZATION | 137 | SY | $24.2500 | $3,322.25 | $7.0000 | $959.00 | $3.0000 | $411.00 |
| 209.100101 | MULCH - TEMPORARY | 712 | SY | $3.6500 | $2,598.80 | $0.5000 | $356.00 | $2.0000 | $1,424.00 |
| 209.1003 | SEED AND MULCH - TEMPORARY | 356 | SY | $3.6500 | $1,299.40 | $1.0000 | $356.00 | $3.0000 | $1,068.00 |
| 304.11000008 | SUBBASE COURSE (MODIFIED) | 336 | CY | $137.0000 | $46,032.00 | $230.0000 | $77,280.00 | $225.0000 | $75,600.00 |
| 404.0983 | 9.5 F3 Top Cour Asph 80 Ser Comp | 84 | TON | $412.0000 | $34,608.00 | $250.0000 | $21,000.00 | $600.0000 | $50,400.00 |
| 404.1989 | 19 F9 Binder Cour Asph 80 Ser Comp | 23 | TON | $388.0000 | $8,924.00 | $350.0000 | $8,050.00 | $450.0000 | $10,350.00 |
| 404.3789 | 37.5 F9 Base Cour Asph 80 Ser Comp | 44 | TON | $388.0000 | $17,072.00 | $265.0000 | $11,660.00 | $300.0000 | $13,200.00 |
| 407.0103 | STRAIGHT TACK COAT | 51 | GAL | $67.7500 | $3,455.25 | $33.0000 | $1,683.00 | $19.0000 | $969.00 |
| 418.7603 | ASPHALT PAVEMENT JOINT ADHESIVE | 3,063 | LF | $3.1000 | $9,495.30 | $3.5000 | $10,720.50 | $3.0000 | $9,189.00 |
| 490.30 | MISC COLD MILLING OF BITUMINOUS CONCRETE | 394 | SY | $33.2500 | $13,100.50 | $47.0000 | $18,518.00 | $90.0000 | $35,460.00 |
| 503.1013 | PCC Foundation for Pavement, PEM | 74 | CY | $1,114.0000 | $82,436.00 | $360.0000 | $26,640.00 | $1,200.0000 | $88,800.00 |
| 603.6001 | REINF CONC PIPE CLASS III, 12 DIA | 14 | LF | $786.5000 | $11,011.00 | $570.0000 | $7,980.00 | $175.0000 | $2,450.00 |
| 603.6003 | REINF CONC PIPE CLASS III, 18 DIA | 7 | LF | $1,452.0000 | $10,164.00 | $880.0000 | $6,160.00 | $175.0000 | $1,225.00 |
| 604.01 | LEACHING BASINS | 5 | LF | $2,300.0000 | $11,500.00 | $2,500.0000 | $12,500.00 | $900.0000 | $4,500.00 |
| 604.070101 | ALTER DRAIN STRUC, LEACH BASINS AND MHS | 3 | EACH | $4,540.0000 | $13,620.00 | $1,700.0000 | $5,100.00 | $800.0000 | $2,400.00 |
| 604.301873 | RECT DRAIN STRUC TY R CAST IRON F3 FRM | 8.3 | LF | $1,515.0000 | $12,574.50 | $2,100.0000 | $17,430.00 | $750.0000 | $6,225.00 |
| 606.18 | WEAK-POST, CORR BEAM GUIDE RAIL | 10 | LF | $330.0000 | $3,300.00 | $330.0000 | $3,300.00 | $140.0000 | $1,400.00 |
| 606.180001 | WK-PST, CORR BM GD RL (SHP CVD) | 41 | LF | $385.0000 | $15,785.00 | $390.0000 | $15,990.00 | $160.0000 | $6,560.00 |
| 606.51 | RESETTING CORRUGATED BEAM GUIDE RAILING | 34 | LF | $320.0000 | $10,880.00 | $320.0000 | $10,880.00 | $83.0000 | $2,822.00 |
| 606.71 | REMOVING AND DISP CORR BEAM GUIDERAILING | 94 | LF | $40.0000 | $3,760.00 | $40.0000 | $3,760.00 | $39.0000 | $3,666.00 |
| 608.000013 | Plant Prod Qual Adj Asph Siwalk,Driv,Pat | 1 | QU | $120.0000 | $120.00 | $120.0000 | $120.00 | $120.0000 | $120.00 |
| 608.0101 | CONCRETE SIDEWALKS AND DRIVEWAYS | 139 | CY | $1,120.0000 | $155,680.00 | $1,500.0000 | $208,500.00 | $2,600.0000 | $361,400.00 |
| 608.020102 | ASP SIDE W, DRVWAY, BICY PATH, VEG CON S | 2 | TON | $545.0000 | $1,090.00 | $475.0000 | $950.00 | $500.0000 | $1,000.00 |
| 608.21000003 | CAST IRON EMBEDDED DETECTABLE WARN UNITS | 122 | SY | $466.0000 | $56,852.00 | $380.0000 | $46,360.00 | $565.0000 | $68,930.00 |
| 608.94010007 | IMPRNT & COLOR ASPH CONC PAVEMENT | 450 | SF | $80.0000 | $36,000.00 | $140.0000 | $63,000.00 | $80.0000 | $36,000.00 |
| 609.0212 | Stone Curb Near Vertical Face (NVF) | 52 | LF | $337.0000 | $17,524.00 | $160.0000 | $8,320.00 | $320.0000 | $16,640.00 |
| 609.0401 | CAST-IN-PLACE CONCRETE CURB TYPE VF6 | 2,307 | LF | $110.0000 | $253,770.00 | $70.0000 | $161,490.00 | $122.0000 | $281,454.00 |
| 610.1605 | Turf Estabment Performance | 345 | SY | $38.7500 | $13,368.75 | $3.0000 | $1,035.00 | $38.0000 | $13,110.00 |
| 618.70000124 | Non-Security Bollard Cover | 2 | EACH | $9,130.0000 | $18,260.00 | $550.0000 | $1,100.00 | $600.0000 | $1,200.00 |
| 618.72136124 | Non-Security Bollard | 2 | EACH | $3,740.0000 | $7,480.00 | $5,500.0000 | $11,000.00 | $750.0000 | $1,500.00 |
| 619.01 | BASIC WORK ZONE TRAFFIC CONTROL | 1 | LS | $620,000.0000 | $620,000.00 | $540,000.0000 | $540,000.00 | $624,000.0000 | $624,000.00 |
| 619.1612 | MAINTAIN TRAF SIG EQUIP (REQUIREMENT B) | 45 | INTM | $200.0000 | $9,000.00 | $250.0000 | $11,250.00 | $500.0000 | $22,500.00 |
| 621.51050003 | GRADE MAINT CLEAN TRIM EXIST ROADSIDE | 21 | LF | $115.0000 | $2,415.00 | $30.0000 | $630.00 | $13.0000 | $273.00 |
| 625.01 | SURVEY OPERATIONS | 1 | LS | $172,000.0000 | $172,000.00 | $180,000.0000 | $180,000.00 | $105,732.0000 | $105,732.00 |
| 625.04 | CONCRETE RIGHT-OF-WAY MARKER TYPE L (LOW | 21 | EACH | $1,515.0000 | $31,815.00 | $700.0000 | $14,700.00 | $1,600.0000 | $33,600.00 |
| 627.50140008 | CUTTING PAVEMENT | 287 | LF | $15.0000 | $4,305.00 | $3.0000 | $861.00 | $7.0000 | $2,009.00 |
| 635.0103 | CLEANING AND PREP OF PAVE SURFS - LINES | 20,625 | LF | $1.4000 | $28,875.00 | $3.0000 | $61,875.00 | $3.0000 | $61,875.00 |
| 635.0203 | CLEANING AND PREP OF PAVE SURFS - LETS | 64 | EACH | $165.0000 | $10,560.00 | $135.0000 | $8,640.00 | $160.0000 | $10,240.00 |
| 635.0303 | CLN AND PREP OF PAVE SURFS - SYMBOLS | 25 | EACH | $165.0000 | $4,125.00 | $135.0000 | $3,375.00 | $175.0000 | $4,375.00 |
| 637.04 | Concrete Cylinder Curing Equipment | 1 | EACH | $10,000.0000 | $10,000.00 | $10,000.0000 | $10,000.00 | $3,000.0000 | $3,000.00 |
| 637.11 | ENGINEER'S FIELD OFFICE - TYPE 1 | 24 | MNTH | $5,350.0000 | $128,400.00 | $6,000.0000 | $144,000.00 | $3,200.0000 | $76,800.00 |
| 637.34 | OFFICE TECHNOLOGY AND SUPPLIES | 2,000 | DC | $1.0000 | $2,000.00 | $1.0000 | $2,000.00 | $1.0000 | $2,000.00 |
| 637.41000115 | DIGITAL INSPECTION DEVICE | 24 | MNTH | $200.0000 | $4,800.00 | $220.0000 | $5,280.00 | $100.0000 | $2,400.00 |
| 645.5102 | GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR | 4 | SF | $275.0000 | $1,100.00 | $280.0000 | $1,120.00 | $35.0000 | $140.00 |
| 645.81 | TYPE A SIGN POSTS | 12 | EACH | $385.0000 | $4,620.00 | $380.0000 | $4,560.00 | $275.0000 | $3,300.00 |
| 646.24 | REF MARK,DELIN,SNOWPL MARKER&PANEL RELOC | 1 | EACH | $110.0000 | $110.00 | $110.0000 | $110.00 | $75.0000 | $75.00 |
| 646.32 | STEEL POST, 2.0 LB/FT | 1 | EACH | $110.0000 | $110.00 | $660.0000 | $660.00 | $150.0000 | $150.00 |
| 647.31 | RELOC SIGN PANEL ASEMB SZ I UNDER 30SF | 8 | EACH | $660.0000 | $5,280.00 | $660.0000 | $5,280.00 | $250.0000 | $2,000.00 |
| 647.32 | RELOCATE SIGN PANEL ASEMB SZ II 30-100SF | 1 | EACH | $660.0000 | $660.00 | $660.0000 | $660.00 | $300.0000 | $300.00 |
| 647.51 | REMV DISP SIGN PANEL ASEMB SZ I UND 30SF | 4 | EACH | $275.0000 | $1,100.00 | $280.0000 | $1,120.00 | $150.0000 | $600.00 |
| 647.61 | REMV DISP GR MT TY A SUP FND SIGN SZ I | 14 | EACH | $275.0000 | $3,850.00 | $280.0000 | $3,920.00 | $170.0000 | $2,380.00 |
| 655.0706 | CAST FRAME F3 UNMT CB BOX CU3, GRATE G3 | 2 | EACH | $2,475.0000 | $4,950.00 | $3,200.0000 | $6,400.00 | $3,000.0000 | $6,000.00 |
| 655.1202 | MANHOLE FRAME AND COVER | 2 | EACH | $2,225.0000 | $4,450.00 | $2,500.0000 | $5,000.00 | $1,500.0000 | $3,000.00 |
| 662.60000108 | FURNISHING ELECTRICAL SERVICE | 1,000 | DC | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 |
| 662.60030008 | ALTERING ELEVATION OF GAS VALVE BOXES | 1 | EACH | $990.0000 | $990.00 | $350.0000 | $350.00 | $300.0000 | $300.00 |
| 662.60510008 | ADJUST MANHOLE TO GRADE (TELEPHONE) | 3 | EACH | $1,870.0000 | $5,610.00 | $1,700.0000 | $5,100.00 | $700.0000 | $2,100.00 |
| 663.33 | ADJUST EXISTING VALVE BOX ELEVATION | 2 | EACH | $500.0000 | $1,000.00 | $350.0000 | $700.00 | $300.0000 | $600.00 |
| 680.05010007 | 360 Degree Camera Video Detection System | 10 | EACH | $26,525.0000 | $265,250.00 | $36,000.0000 | $360,000.00 | $36,000.0000 | $360,000.00 |
| 680.05020007 | 360 Degree Camera Assembly | 13 | EACH | $4,500.0000 | $58,500.00 | $6,400.0000 | $83,200.00 | $6,500.0000 | $84,500.00 |
| 680.5001 | POLE EXCAVATION AND CONCRETE FOUNDATION | 96 | CY | $3,620.0000 | $347,520.00 | $5,000.0000 | $480,000.00 | $4,300.0000 | $412,800.00 |
| 680.51000010 | ALTER ELEVATION OF PULL BOXES | 9 | EACH | $360.0000 | $3,240.00 | $1,300.0000 | $11,700.00 | $575.0000 | $5,175.00 |
| 680.510501 | PULLBOX-RECT, 26 X 18 INCH, REINF CONC | 29 | EACH | $2,150.0000 | $62,350.00 | $3,000.0000 | $87,000.00 | $3,000.0000 | $87,000.00 |
| 680.51100010 | CLEAN EXISTING PULLBOX | 34 | EACH | $135.0000 | $4,590.00 | $184.0000 | $6,256.00 | $175.0000 | $5,950.00 |
| 680.51200208 | REMOVE JUNCTION BOX FOR DETECTOR LOOPS | 4 | EACH | $2,000.0000 | $8,000.00 | $164.0000 | $656.00 | $1,200.0000 | $4,800.00 |
| 680.520106 | CONDUIT, METAL STEEL, ZINC CTD, 2" | 922 | LF | $34.0000 | $31,348.00 | $50.0000 | $46,100.00 | $22.0000 | $20,284.00 |
| 680.520108 | CONDUIT, METAL STEEL, ZINC COATED, 3" | 1,250 | LF | $50.0000 | $62,500.00 | $75.0000 | $93,750.00 | $45.0000 | $56,250.00 |
| 680.520110 | CONDUIT, METAL STEEL, ZINC CTD, 4" | 29 | LF | $88.0000 | $2,552.00 | $120.0000 | $3,480.00 | $77.0000 | $2,233.00 |
| 680.53010010 | CLEAN EXISTING CONDUIT | 916 | LF | $7.0000 | $6,412.00 | $11.0000 | $10,076.00 | $9.0000 | $8,244.00 |
| 680.600432 | T.S. POLE-SPAN WIRE 4,000 LBS, 32 FT | 1 | EACH | $12,850.0000 | $12,850.00 | $17,600.0000 | $17,600.00 | $17,000.0000 | $17,000.00 |
| 680.600832 | T.S. POLE-SPAN WIRE 8,000 LBS, 32 FT | 1 | EACH | $16,450.0000 | $16,450.00 | $23,000.0000 | $23,000.00 | $19,000.0000 | $19,000.00 |
| 680.601130 | T.S. POLE-SPAN WIRE 11,000 LBS, 30 FT | 1 | EACH | $18,550.0000 | $18,550.00 | $25,000.0000 | $25,000.00 | $26,000.0000 | $26,000.00 |
| 680.6808 | T.S. POLE-BRACKET MOUNT 8 FEET M. HT | 72 | EACH | $1,725.0000 | $124,200.00 | $2,500.0000 | $180,000.00 | $1,900.0000 | $136,800.00 |
| 680.7002 | DUAL SP WIRE ASSEMB WI UPPER TETHER WIRE | 2 | EACH | $1,650.0000 | $3,300.00 | $2,400.0000 | $4,800.00 | $5,000.0000 | $10,000.00 |
| 680.730214 | SIGNAL CABLE 2 CONDUCTORS, 14 AWG | 505 | LF | $5.0000 | $2,525.00 | $7.0000 | $3,535.00 | $3.0000 | $1,515.00 |
| 680.730514 | SIGNAL CABLE 5 CONDUCTORS, 14 AWG | 15,095 | LF | $5.2500 | $79,248.75 | $8.0000 | $120,760.00 | $5.0000 | $75,475.00 |
| 680.731014 | SIGNAL CABLE 10 CONDUCTORS, 14 AWG | 296 | LF | $7.5000 | $2,220.00 | $11.0000 | $3,256.00 | $10.0000 | $2,960.00 |
| 680.731514 | SIGNAL CABLE 15 CONDUCTORS, 14 AWG | 215 | LF | $10.7500 | $2,311.25 | $15.0000 | $3,225.00 | $15.0000 | $3,225.00 |
| 680.79000001 | REMOVE TRAFFIC SIGNAL EQUIPMENT | 1 | LS | $20,500.0000 | $20,500.00 | $28,000.0000 | $28,000.00 | $9,500.0000 | $9,500.00 |
| 680.79300010 | REM TRAF SIG HEAD OR PEDESTRIAN SIG HEAD | 11 | EACH | $135.0000 | $1,485.00 | $187.0000 | $2,057.00 | $300.0000 | $3,300.00 |
| 680.80324515 | INSTALL MICROCOMPUTER CABINET | 14 | EACH | $3,250.0000 | $45,500.00 | $4,600.0000 | $64,400.00 | $3,500.0000 | $49,000.00 |
| 680.810101 | T.S. MODULE - 12 INCH, RED BALL, LED | 8 | EACH | $155.0000 | $1,240.00 | $220.0000 | $1,760.00 | $120.0000 | $960.00 |
| 680.810103 | T.S. MODULE- 12 INCH, YELLOW BALL LED | 8 | EACH | $150.0000 | $1,200.00 | $230.0000 | $1,840.00 | $120.0000 | $960.00 |
| 680.810104 | T.S. MODULE- 12 INCH, YELLOW ARROW LED | 1 | EACH | $159.0000 | $159.00 | $220.0000 | $220.00 | $120.0000 | $120.00 |
| 680.810105 | T.S. MODULE - 12 INCH GREEN BALL, LED | 8 | EACH | $160.0000 | $1,280.00 | $230.0000 | $1,840.00 | $120.0000 | $960.00 |
| 680.810106 | T.S. MODULE - 12 INCH GREEN ARROW, LED | 3 | EACH | $155.0000 | $465.00 | $220.0000 | $660.00 | $120.0000 | $360.00 |
| 680.810107 | TRAFFIC SIGNAL SECTION - TYPE I, 12 INCH | 28 | EACH | $290.0000 | $8,120.00 | $420.0000 | $11,760.00 | $550.0000 | $15,400.00 |
| 680.8111 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 1 WAY | 6 | EACH | $585.0000 | $3,510.00 | $800.0000 | $4,800.00 | $370.0000 | $2,220.00 |
| 680.8112 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 2 WAY | 1 | EACH | $850.0000 | $850.00 | $1,300.0000 | $1,300.00 | $900.0000 | $900.00 |
| 680.813103 | PEDESTRIAN SIG SECTION - TYPE I, 12 INCH | 158 | EACH | $435.0000 | $68,730.00 | $600.0000 | $94,800.00 | $580.0000 | $91,640.00 |
| 680.813105 | PED SIG MOD-12'' BI-MDL HND/MAN SYMB LED | 79 | EACH | $365.0000 | $28,835.00 | $500.0000 | $39,500.00 | $210.0000 | $16,590.00 |
| 680.8141 | PEDESTRIAN SIGNAL BRACKET MOUNT ASSEMBLY | 79 | EACH | $480.0000 | $37,920.00 | $660.0000 | $52,140.00 | $680.0000 | $53,720.00 |
| 680.815001 | Ped Sign Mod 12" Count Timer LED | 79 | EACH | $360.0000 | $28,440.00 | $500.0000 | $39,500.00 | $210.0000 | $16,590.00 |
| 680.8151 | Acces Ped Sign w/o Post | 88 | EACH | $1,575.0000 | $138,600.00 | $2,200.0000 | $193,600.00 | $1,500.0000 | $132,000.00 |
| 680.8199 | Backplates for Traffic Signal Heads | 10 | EACH | $310.0000 | $3,100.00 | $420.0000 | $4,200.00 | $245.0000 | $2,450.00 |
| 680.8201 | OVERHEAD SIGN ASSEMBLY, TYPE A | 4 | EACH | $780.0000 | $3,120.00 | $1,100.0000 | $4,400.00 | $1,400.0000 | $5,600.00 |
| 680.8223 | Breakaway Transformer Base | 72 | EACH | $890.0000 | $64,080.00 | $1,200.0000 | $86,400.00 | $1,100.0000 | $79,200.00 |
| 680.82250101 | REM PED PSHBUTN AND SIGN ASSEMB | 22 | EACH | $135.0000 | $2,970.00 | $190.0000 | $4,180.00 | $215.0000 | $4,730.00 |
| 680.82250608 | REM AND DISP PEDESTRIAN POLE AND FOUNDTN | 12 | EACH | $1,050.0000 | $12,600.00 | $1,500.0000 | $18,000.00 | $1,300.0000 | $15,600.00 |
| 680.82250801 | REMOVE TRAFFIC SIGNAL PULLBOXES | 3 | EACH | $665.0000 | $1,995.00 | $900.0000 | $2,700.00 | $1,700.0000 | $5,100.00 |
| 680.94000008 | TRAFFIC SIGNAL SERVICE ENTRANCE | 1 | EACH | $1,400.0000 | $1,400.00 | $2,000.0000 | $2,000.00 | $5,000.0000 | $5,000.00 |
| 680.9402 | Meter Pan | 8 | EACH | $1,275.0000 | $10,200.00 | $1,800.0000 | $14,400.00 | $1,700.0000 | $13,600.00 |
| 680.9499 | Inst Elect Disc/Gen Trans Sw | 3 | EACH | $1,275.0000 | $3,825.00 | $1,800.0000 | $5,400.00 | $130.0000 | $390.00 |
| 680.950206 | Electrical Service Cable | 42 | LF | $5.7000 | $239.40 | $8.0000 | $336.00 | $11.0000 | $462.00 |
| 680.99 | Performance Concrete Quality Adjustment | 1 | QU | $10.0000 | $10.00 | $10.0000 | $10.00 | $10.0000 | $10.00 |
| 680.99050010 | REMOVE POLE MOUNTED SIG CONTROL CABINET | 12 | EACH | $400.0000 | $4,800.00 | $560.0000 | $6,720.00 | $600.0000 | $7,200.00 |
| 680.99060010 | REMOVE GRND MOUNTED SIG CONTROL CABINET | 1 | EACH | $3,000.0000 | $3,000.00 | $550.0000 | $550.00 | $3,900.0000 | $3,900.00 |
| 685.1102 | Wht Epoxy Reflect Pavnt Strip 20 mil | 255 | LF | $3.3000 | $841.50 | $3.7000 | $943.50 | $4.0000 | $1,020.00 |
| 685.1202 | Yell Epoxy Reflect Pavnt Strip 20 mil | 120 | LF | $3.3000 | $396.00 | $3.7000 | $444.00 | $4.0000 | $480.00 |
| 685.3104 | W Epox Refl pav Spe Str 20 mil Port Hand | 31,437 | LF | $2.0000 | $62,874.00 | $4.0000 | $125,748.00 | $5.0000 | $157,185.00 |
| 685.3304 | W Epox Refl pav Letters 20 mil Port Hand | 44 | EACH | $165.0000 | $7,260.00 | $220.0000 | $9,680.00 | $300.0000 | $13,200.00 |
| 685.3404 | W Epox Refl pav Symbols 20 mil Port Hand | 21 | EACH | $185.0000 | $3,885.00 | $280.0000 | $5,880.00 | $325.0000 | $6,825.00 |
| 697.03 | FIELD CHANGE PAYMENT | 275,000 | DC | $1.0000 | $275,000.00 | $1.0000 | $275,000.00 | $1.0000 | $275,000.00 |
| 698.04 | ASPHALT PRICE ADJUSTMENT | 700 | DC | $1.0000 | $700.00 | $1.0000 | $700.00 | $1.0000 | $700.00 |
| 698.05 | FUEL PRICE ADJUSTMENT | 145 | DC | $1.0000 | $145.00 | $1.0000 | $145.00 | $1.0000 | $145.00 |
| 698.06 | STEEL/IRON PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 699.040001 | MOBILIZATION | 1 | LS | $168,000.0000 | $168,000.00 | $190,000.0000 | $190,000.00 | $200,000.0000 | $200,000.00 |
Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.