NY New York DOT · Bid Tabulation

Contract D265629

BRIDGE DECK REPLACEMENT - NYS Route 434 Over Choconut Creek, Town of Vestal.

County
Broome
Letting
January 22, 2026
Bidders
5
Apparent low bid BETTE & CRING LLC $4,367,231.00
Other bidders R DE VINCENTIS CONSTRUCTION INC $4,624,000.00 VECTOR CONSTRUCTION CORP $4,641,838.53 BOTHAR CONSTRUCTION LLC $4,999,999.97 ECONOMY PAVING CO INC $5,407,754.47

Bid Items - unit price and extension by bidder

Item Description Qty UOM BETTE & CRING LLC $4,367,231.00 R DE VINCENTIS CONSTRUCTION INC $4,624,000.00 VECTOR CONSTRUCTION CORP $4,641,838.53 BOTHAR CONSTRUCTION LLC $4,999,999.97 ECONOMY PAVING CO INC $5,407,754.47
Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension Unit Price Extension
201.07000004 CLEARING AND GRUBBING 1,102 SY $5.0000 $5,510.00 $10.0000 $11,020.00 $3.0000 $3,306.00 $15.0000 $16,530.00 $5.0000 $5,510.00
202.2201 RMV STEEL SUP STR SLAB W SHR CONN TY A 10,800 SF $30.0000 $324,000.00 $32.0000 $345,600.00 $45.0000 $486,000.00 $21.5000 $232,200.00 $50.0000 $540,000.00
203.01990006 IMPERVIOUS EMBANKMENT IN-PLACE 220 CY $125.0000 $27,500.00 $100.0000 $22,000.00 $48.0000 $10,560.00 $156.6000 $34,452.00 $10.0000 $2,200.00
203.02 UNCLASSIFIED EXCAVATION AND DISPOSAL 968 CY $35.0000 $33,880.00 $27.0000 $26,136.00 $34.0000 $32,912.00 $38.0000 $36,784.00 $50.0000 $48,400.00
203.03 EMBANKMENT IN PLACE 538 CY $55.0000 $29,590.00 $16.0000 $8,608.00 $25.0000 $13,450.00 $57.4500 $30,908.10 $30.0000 $16,140.00
203.21 SELECT STRUCTURE FILL 216 CY $90.0000 $19,440.00 $66.0000 $14,256.00 $80.0000 $17,280.00 $99.5000 $21,492.00 $75.0000 $16,200.00
206.01 STRUCTURE EXCAVATION 589 CY $25.0000 $14,725.00 $16.0000 $9,424.00 $50.0000 $29,450.00 $25.0000 $14,725.00 $25.0000 $14,725.00
207.21 GEOTEXTILE SEPARATION 213 SY $3.2500 $692.25 $5.0000 $1,065.00 $5.0000 $1,065.00 $3.2500 $692.25 $1.0000 $213.00
207.26 PREFAB COMPOSITE STRUCTURAL DRAIN 200 SY $20.0000 $4,000.00 $16.0000 $3,200.00 $22.0000 $4,400.00 $16.3500 $3,270.00 $10.0000 $2,000.00
209.1003 SEED AND MULCH - TEMPORARY 762 SY $2.2500 $1,714.50 $3.0000 $2,286.00 $2.0000 $1,524.00 $5.2500 $4,000.50 $5.0000 $3,810.00
209.2103 SOIL STABILIZERS, CLASS IV TYPE C 648 SY $7.0000 $4,536.00 $5.0000 $3,240.00 $1.5000 $972.00 $5.6500 $3,661.20 $1.5000 $972.00
209.22 Stabilized Construction Access 105 SY $35.0000 $3,675.00 $53.0000 $5,565.00 $50.0000 $5,250.00 $81.8000 $8,589.00 $50.0000 $5,250.00
209.2301 SEDIMENT FILTER LOG-TEMPORARY,12" 345 LF $9.0000 $3,105.00 $28.0000 $9,660.00 $9.0000 $3,105.00 $9.5500 $3,294.75 $8.5000 $2,932.50
304.15 SUBBASE COURSE, OPTIONAL TYPE 698 CY $90.0000 $62,820.00 $100.0000 $69,800.00 $80.0000 $55,840.00 $79.0000 $55,142.00 $95.0000 $66,310.00
404.0982 9.5 F2 Top Cour Asph 80 Ser Comp 168 TON $190.0000 $31,920.00 $230.0000 $38,640.00 $245.0000 $41,160.00 $190.0000 $31,920.00 $195.0000 $32,760.00
404.1989 19 F9 Binder Cour Asph 80 Ser Comp 210 TON $175.0000 $36,750.00 $185.0000 $38,850.00 $195.0000 $40,950.00 $175.0000 $36,750.00 $185.0000 $38,850.00
404.2589 25 F9 Binder Cour Asph 80 Ser Comp 263 TON $160.0000 $42,080.00 $190.0000 $49,970.00 $175.0000 $46,025.00 $160.0000 $42,080.00 $175.0000 $46,025.00
404.4389 19 F9 Temp Bin Cour Asph 80 Ser Comp 172 TON $160.0000 $27,520.00 $184.0000 $31,648.00 $175.0000 $30,100.00 $160.0000 $27,520.00 $165.0000 $28,380.00
407.01040009 NON-TRACKING TACK COAT 210 GAL $12.0000 $2,520.00 $17.0000 $3,570.00 $12.0000 $2,520.00 $12.0000 $2,520.00 $3.6000 $756.00
418.7603 ASPHALT PAVEMENT JOINT ADHESIVE 788 LF $2.0000 $1,576.00 $5.0000 $3,940.00 $2.0000 $1,576.00 $2.0000 $1,576.00 $0.4000 $315.20
490.30 MISC COLD MILLING OF BITUMINOUS CONCRETE 1,300 SY $15.0000 $19,500.00 $21.0000 $27,300.00 $16.0000 $20,800.00 $12.3500 $16,055.00 $17.2500 $22,425.00
552.15 INTERIM STEEL SHEETING 1,224 SF $40.0000 $48,960.00 $36.0000 $44,064.00 $50.0000 $61,200.00 $48.4000 $59,241.60 $25.0000 $30,600.00
553.030001 TEMPORARY WATERWAY DIVERSION STRUCTURE 1 EACH $1.0000 $1.00 $16,000.0000 $16,000.00 $6,500.0000 $6,500.00 $1,500.0000 $1,500.00 $1,000.0000 $1,000.00
553.030002 TEMPORARY WATERWAY DIVERSION STRUCTURE 1 EACH $1.0000 $1.00 $25,000.0000 $25,000.00 $6,500.0000 $6,500.00 $30,000.0000 $30,000.00 $1,000.0000 $1,000.00
553.04010109 TEMPORARY CAUSEWAYS 1 LS $1.0000 $1.00 $55,000.0000 $55,000.00 $23,000.0000 $23,000.00 $54,000.0000 $54,000.00 $25,000.0000 $25,000.00
555.0021 Concrete for Structures, Performance 179 CY $1,600.0000 $286,400.00 $1,850.0000 $331,150.00 $1,700.0000 $304,300.00 $1,582.0000 $283,178.00 $1,650.0000 $295,350.00
555.9902 Performance Concrete Quality F Struct 1 QU $7.5000 $7.50 $7.5000 $7.50 $7.5000 $7.50 $7.5000 $7.50 $7.5000 $7.50
556.0202 EPOXY-COATED BAR REINFORCEMENT FOR STRUC 24,771 LB $3.0000 $74,313.00 $2.5000 $61,927.50 $2.0000 $49,542.00 $2.2500 $55,734.75 $2.0000 $49,542.00
556.03 STUD SHEAR CONNECTORS FOR BRIDGES 2,580 EACH $25.0000 $64,500.00 $9.0000 $23,220.00 $12.0000 $30,960.00 $11.2000 $28,896.00 $10.0000 $25,800.00
557.1012 Structural Approach Slab 273 SY $500.0000 $136,500.00 $500.0000 $136,500.00 $580.0000 $158,340.00 $654.0000 $178,542.00 $605.0000 $165,165.00
557.1112 Superstructure Slab 1,200 SY $500.0000 $600,000.00 $685.0000 $822,000.00 $670.0000 $804,000.00 $585.0000 $702,000.00 $665.0000 $798,000.00
557.25000016 CR SEAL HIGH MOLECULAR WGT METHACRYLATE 367 LF $15.0000 $5,505.00 $6.0000 $2,202.00 $14.0000 $5,138.00 $20.4000 $7,486.80 $8.5000 $3,119.50
557.29 WTR SURF TREAT - SUPER SLAB & STRUC SLAB 1,391 SY $0.0100 $13.91 $1.0000 $1,391.00 $0.0100 $13.91 $11.7000 $16,274.70 $1.0000 $1,391.00
557.60010004 FULL DIAM GRIND STR SLB STR APRCH SLB SR 1,390 SY $15.0000 $20,850.00 $23.0000 $31,970.00 $22.0000 $30,580.00 $16.0000 $22,240.00 $21.5000 $29,885.00
557.9901 Performance Concrete Quality Adjustment 1 QU $8.8600 $8.86 $8.8600 $8.86 $8.8600 $8.86 $8.8600 $8.86 $8.8600 $8.86
558.02 LONGT. SAWCUT GRVNG OF STRUCT SLAB SUF 1,391 SY $10.0000 $13,910.00 $12.0000 $16,692.00 $14.0000 $19,474.00 $7.3000 $10,154.30 $11.5000 $15,996.50
559.01 Protect Seal Struct Conc New Bridge Dek 18,767 SF $0.5000 $9,383.50 $1.3000 $24,397.10 $0.5500 $10,321.85 $1.0000 $18,767.00 $0.5500 $10,321.85
559.02 Protective Sealing of New Struct Concret 7,181 SF $0.5500 $3,949.55 $1.3000 $9,335.30 $1.5000 $10,771.50 $1.4000 $10,053.40 $0.5500 $3,949.55
559.03 Protect Seal Exist Struct Concr Br Deck 7,288 SF $0.5500 $4,008.40 $1.3000 $9,474.40 $1.5000 $10,932.00 $1.4000 $10,203.20 $1.5500 $11,296.40
565.2023 TYPE E.B. FIXED BEARING (112 - 168 KIPS) 9 EACH $2,000.0000 $18,000.00 $2,500.0000 $22,500.00 $3,000.0000 $27,000.00 $2,109.0000 $18,981.00 $4,935.0000 $44,415.00
565.2033 TYPE E.B EXPAN BEARING (112 TO 168 KIPS) 27 EACH $2,000.0000 $54,000.00 $1,800.0000 $48,600.00 $3,000.0000 $81,000.00 $1,959.0000 $52,893.00 $4,045.0000 $109,215.00
567.60 ARMORLESS BRIDGE JOINT SYSTEM 85 LF $240.0000 $20,400.00 $350.0000 $29,750.00 $360.0000 $30,600.00 $304.9000 $25,916.50 $305.0000 $25,925.00
568.70 TRANSITION BRIDGE RAILING 160 LF $205.0000 $32,800.00 $225.0000 $36,000.00 $220.0000 $35,200.00 $243.0000 $38,880.00 $195.0000 $31,200.00
569.04 SINGLE SLOPE(HALF SECT) CONC BRIDGE BARR 322 LF $225.0000 $72,450.00 $250.0000 $80,500.00 $240.0000 $77,280.00 $273.4000 $88,034.80 $225.0000 $72,450.00
569.99 Performance Concrete Quality Adjustment 1 QU $7.6100 $7.61 $7.6100 $7.61 $7.6100 $7.61 $7.6100 $7.61 $7.6100 $7.61
570.01 LEAD EXPOSURE CONTROL PLAN 1 LS $3,000.0000 $3,000.00 $1,500.0000 $1,500.00 $3,000.0000 $3,000.00 $3,383.0000 $3,383.00 $100.0000 $100.00
570.02 MEDICAL TESTING 3,000 DC $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00
570.03 PERSONAL EXP MONITORING SAMPLE ANAL 3,000 DC $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00 $1.0000 $3,000.00
570.04 DECONTAMINATION FACILITIES 2 CW $50.0000 $100.00 $1,500.0000 $3,000.00 $50.0000 $100.00 $56.4000 $112.80 $1,000.0000 $2,000.00
570.10 ENVIRONMENTAL WATERWAY PROTECTION 1 LS $1,200.0000 $1,200.00 $2,500.0000 $2,500.00 $2,200.0000 $2,200.00 $1,494.0000 $1,494.00 $100.0000 $100.00
571.03 DISPOSAL HAZARD PAINT WASTE CONTAIN LEAD 370 LB $5.0000 $1,850.00 $9.0000 $3,330.00 $6.0000 $2,220.00 $5.6500 $2,090.50 $1.0000 $370.00
574.030001 STRUCTURAL STEEL PAINTING: LOCALIZED 2,087 SF $40.0000 $83,480.00 $20.0000 $41,740.00 $65.0000 $135,655.00 $45.2000 $94,332.40 $10.0000 $20,870.00
576.02 SCUPPERS (TYPE B) 2 EACH $3,500.0000 $7,000.00 $3,700.0000 $7,400.00 $2,500.0000 $5,000.00 $5,348.0000 $10,696.00 $3,865.0000 $7,730.00
580.01 REMOVAL OF STRUCTURAL CONCRETE 146 CY $1,500.0000 $219,000.00 $1,900.0000 $277,400.00 $1,800.0000 $262,800.00 $2,474.0000 $361,204.00 $3,835.0000 $559,910.00
582.0051 Removal and Replacement of Struct Conc 7 CY $10,000.0000 $70,000.00 $6,800.0000 $47,600.00 $9,200.0000 $64,400.00 $6,766.0000 $47,362.00 $10,500.0000 $73,500.00
585.01 STRUCTURAL LIFTING OPERATIONS - TYPE A 18 EACH $5,000.0000 $90,000.00 $4,000.0000 $72,000.00 $6,000.0000 $108,000.00 $5,603.0000 $100,854.00 $9,405.0000 $169,290.00
585.02 STRUCTURAL LIFTING OPERATIONS - TYPE B 18 EACH $5,000.0000 $90,000.00 $4,200.0000 $75,600.00 $7,000.0000 $126,000.00 $5,888.0000 $105,984.00 $14,005.0000 $252,090.00
586.0201 DRILL GROUT BOLTS OR REINFORMENT BARS 1,009 EACH $82.0000 $82,738.00 $37.0000 $37,333.00 $37.0000 $37,333.00 $63.1000 $63,667.90 $55.0000 $55,495.00
586.0301 DRILL GROUT BOLTS OR REINFO BARS PULLOUT 776 EACH $110.0000 $85,360.00 $83.0000 $64,408.00 $43.0000 $33,368.00 $69.5500 $53,970.80 $65.0000 $50,440.00
589.010001 REMOVAL OF EXISTING STEEL 15 LB $300.0000 $4,500.00 $275.0000 $4,125.00 $250.0000 $3,750.00 $476.1000 $7,141.50 $10.0000 $150.00
589.010002 REMOVAL OF EXISTING STEEL 15,888 LB $10.0000 $158,880.00 $1.0000 $15,888.00 $2.0000 $31,776.00 $0.9500 $15,093.60 $1.5000 $23,832.00
589.520001 REMOVAL OF EXISTING STEEL 36 EACH $1,000.0000 $36,000.00 $600.0000 $21,600.00 $600.0000 $21,600.00 $338.9000 $12,200.40 $750.0000 $27,000.00
606.10 BOX BEAM GUIDE RAILING 125 LF $50.0000 $6,250.00 $55.0000 $6,875.00 $60.0000 $7,500.00 $56.5000 $7,062.50 $55.0000 $6,875.00
606.100002 BOX BEAM GUIDE RAIL SH BNT OR SH MITERED 93 LF $60.0000 $5,580.00 $66.0000 $6,138.00 $70.0000 $6,510.00 $67.8000 $6,305.40 $65.0000 $6,045.00
606.11 BOX BEAM MEDIAN BARRIER 301 LF $70.0000 $21,070.00 $72.0000 $21,672.00 $80.0000 $24,080.00 $73.4500 $22,108.45 $75.0000 $22,575.00
606.11000016 BOX BEAM MEDIAN BARRIER FOR STRUCTURES 190 LF $160.0000 $30,400.00 $100.0000 $19,000.00 $145.0000 $27,550.00 $101.7000 $19,323.00 $115.0000 $21,850.00
606.120101 BOX BEAM END PIECE 2 EACH $750.0000 $1,500.00 $1,000.0000 $2,000.00 $800.0000 $1,600.00 $1,017.0000 $2,034.00 $695.0000 $1,390.00
606.1403 BX BM MED BARR END ASSEMBL, TYPE C 2 EACH $8,750.0000 $17,500.00 $9,100.0000 $18,200.00 $8,000.0000 $16,000.00 $9,266.0000 $18,532.00 $6,655.0000 $13,310.00
606.73 REMOVING AND DISP BOX BEAM GUIDERAILING 352 LF $6.0000 $2,112.00 $10.0000 $3,520.00 $6.0000 $2,112.00 $3.0000 $1,056.00 $10.0000 $3,520.00
606.74 REMOVING AND DISP BOX BM MEDIAN BARRIER 320 LF $6.0000 $1,920.00 $11.0000 $3,520.00 $6.0000 $1,920.00 $32.0000 $10,240.00 $10.0000 $3,200.00
608.020102 ASP SIDE W, DRVWAY, BICY PATH, VEG CON S 17 TON $240.0000 $4,080.00 $305.0000 $5,185.00 $250.0000 $4,250.00 $240.0000 $4,080.00 $195.0000 $3,315.00
609.0301 STONE CURB - BRIDGE (TYPE A) 60 LF $230.0000 $13,800.00 $200.0000 $12,000.00 $260.0000 $15,600.00 $307.0000 $18,420.00 $305.0000 $18,300.00
609.0902 OPT CURB(PRECAS PM4 RC-IN-PLA M4 ,MT) 570 LF $50.0000 $28,500.00 $40.0000 $22,800.00 $40.0000 $22,800.00 $96.0000 $54,720.00 $45.0000 $25,650.00
610.13 WEED REMOVAL 1,769 SY $0.5000 $884.50 $0.6500 $1,149.85 $6.0000 $10,614.00 $0.6000 $1,061.40 $1.0000 $1,769.00
610.1401 TOPSOIL - REUSE ON-SITE MATERIALS 125 CY $35.0000 $4,375.00 $95.0000 $11,875.00 $24.0000 $3,000.00 $53.7000 $6,712.50 $10.0000 $1,250.00
610.1402 TOPSOIL - ROADSIDE 162 CY $85.0000 $13,770.00 $110.0000 $17,820.00 $64.0000 $10,368.00 $151.2000 $24,494.40 $15.0000 $2,430.00
610.16090824 TURF ESTABLISHMENT SEED MIX AS SPECIFIED 1,121 SY $2.0000 $2,242.00 $2.5000 $2,802.50 $2.6000 $2,914.60 $2.3000 $2,578.30 $2.5000 $2,802.50
610.16092124 Turf Establishment Seed Mix As Specified 648 SY $3.0000 $1,944.00 $3.5000 $2,268.00 $4.2000 $2,721.60 $3.4000 $2,203.20 $4.0000 $2,592.00
610.19 WATERING VEGETATION 81 MGAL $10.0000 $810.00 $12.0000 $972.00 $50.0000 $4,050.00 $11.3000 $915.30 $50.0000 $4,050.00
611.0132 PLANT MAJOR DECIDUOUS TREE 1 1/2" CALIP 3 EACH $750.0000 $2,250.00 $850.0000 $2,550.00 $600.0000 $1,800.00 $847.5000 $2,542.50 $600.0000 $1,800.00
611.0711 PLANTING HERBACEOUS PLANTS AS SPECIFIED 50 EACH $50.0000 $2,500.00 $60.0000 $3,000.00 $20.0000 $1,000.00 $56.5000 $2,825.00 $20.0000 $1,000.00
611.19010024 POST PLANT CARE W REPLACE - MJ DECID TRE 3 EACH $20.0000 $60.00 $25.0000 $75.00 $100.0000 $300.00 $22.6000 $67.80 $100.0000 $300.00
616.08000024 LIVE STAKE PLANTINGS 1" TO 2" 249 EACH $20.0000 $4,980.00 $25.0000 $6,225.00 $15.0000 $3,735.00 $22.6000 $5,627.40 $15.0000 $3,735.00
617.01010024 CONTROL INVASIVE PLANT SPECIES W/HERBICI 524 SF $2.0000 $1,048.00 $3.0000 $1,572.00 $3.0000 $1,572.00 $2.3000 $1,205.20 $5.0000 $2,620.00
617.10000024 DISP MATERIAL CONTAINING INVASIVE PLANT 392 CY $25.0000 $9,800.00 $120.0000 $47,040.00 $50.0000 $19,600.00 $55.5500 $21,775.60 $1.0000 $392.00
617.11000024 EQUIP CLEANING FOR INVASIVE PLANT SPECIE 1 LS $5,000.0000 $5,000.00 $4,000.0000 $4,000.00 $3,000.0000 $3,000.00 $2,858.0000 $2,858.00 $100.0000 $100.00
619.01 BASIC WORK ZONE TRAFFIC CONTROL 1 LS $250,000.0000 $250,000.00 $250,000.0000 $250,000.00 $120,000.0000 $120,000.00 $500,000.0000 $500,000.00 $450,000.0000 $450,000.00
619.04 TYPE III CONSTRUCTION BARRICADE 69 EACH $350.0000 $24,150.00 $195.0000 $13,455.00 $180.0000 $12,420.00 $69.0000 $4,761.00 $150.0000 $10,350.00
619.0803 COVER EXISTING PVMT MARK STRIPES (TAPE) 8,706 LF $6.0000 $52,236.00 $4.2500 $37,000.50 $4.0000 $34,824.00 $4.2500 $37,000.50 $4.0000 $34,824.00
619.100102 INTERIM PAVE MARKING, STRIPE(EPOX PAINT) 27,163 LF $0.1000 $2,716.30 $0.8500 $23,088.55 $0.9000 $24,446.70 $1.0000 $27,163.00 $0.7500 $20,372.25
619.110511 PVMS STD SIZE FUL MATR LED NO EQ OR CELL 2 EACH $10,000.0000 $20,000.00 $18,000.0000 $36,000.00 $15,000.0000 $30,000.00 $13,000.0000 $26,000.00 $20,000.0000 $40,000.00
619.1715 Temp Positive Barrier Cat 5 Pin Prohibit 3,160 LF $25.0000 $79,000.00 $41.0000 $129,560.00 $30.0000 $94,800.00 $45.5000 $143,780.00 $35.0000 $110,600.00
619.1716 Temp Positive Barrier Cat 6 Pin Required 2,260 LF $40.0000 $90,400.00 $39.0000 $88,140.00 $34.0000 $76,840.00 $70.2500 $158,765.00 $35.0000 $79,100.00
619.1803 TEMP IMPACT ATTENU - REDIR (TEST LEV 3) 4 EACH $10,000.0000 $40,000.00 $16,000.0000 $64,000.00 $6,500.0000 $26,000.00 $8,000.0000 $32,000.00 $2,755.0000 $11,020.00
619.20 INTERIM TUBULAR MARKERS 14 EACH $50.0000 $700.00 $120.0000 $1,680.00 $140.0000 $1,960.00 $90.0000 $1,260.00 $75.0000 $1,050.00
620.03 STONE FILLING (LIGHT) 21 CY $115.0000 $2,415.00 $175.0000 $3,675.00 $130.0000 $2,730.00 $188.0000 $3,948.00 $115.0000 $2,415.00
620.0801 BEDDING MATERIAL, TYPE 1 21 CY $105.0000 $2,205.00 $160.0000 $3,360.00 $120.0000 $2,520.00 $111.0000 $2,331.00 $135.0000 $2,835.00
625.01 SURVEY OPERATIONS 1 LS $25,000.0000 $25,000.00 $25,000.0000 $25,000.00 $45,000.0000 $45,000.00 $80,000.0000 $80,000.00 $50,000.0000 $50,000.00
625.06 PERMANENT SURVEY MARKERS 2 EACH $3,000.0000 $6,000.00 $750.0000 $1,500.00 $2,400.0000 $4,800.00 $3,590.0000 $7,180.00 $3,500.0000 $7,000.00
627.50140008 CUTTING PAVEMENT 1,616 LF $10.0000 $16,160.00 $4.0000 $6,464.00 $6.0000 $9,696.00 $6.5000 $10,504.00 $1.0000 $1,616.00
637.04 Concrete Cylinder Curing Equipment 1 EACH $2,500.0000 $2,500.00 $4,000.0000 $4,000.00 $5,000.0000 $5,000.00 $4,500.0000 $4,500.00 $10,000.0000 $10,000.00
637.12 ENGINEER'S FIELD OFFICE - TYPE 2 18 MNTH $2,500.0000 $45,000.00 $2,200.0000 $39,600.00 $2,400.0000 $43,200.00 $2,500.0000 $45,000.00 $4,000.0000 $72,000.00
637.34 OFFICE TECHNOLOGY AND SUPPLIES 1,000 DC $1.0000 $1,000.00 $1.0000 $1,000.00 $1.0000 $1,000.00 $1.0000 $1,000.00 $1.0000 $1,000.00
645.5102 GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR 53 SF $45.0000 $2,385.00 $65.0000 $3,445.00 $55.0000 $2,915.00 $62.1500 $3,293.95 $45.0000 $2,385.00
645.81 TYPE A SIGN POSTS 17 EACH $200.0000 $3,400.00 $300.0000 $5,100.00 $280.0000 $4,760.00 $293.8000 $4,994.60 $205.0000 $3,485.00
647.61 REMV DISP GR MT TY A SUP FND SIGN SZ I 13 EACH $50.0000 $650.00 $70.0000 $910.00 $51.0000 $663.00 $67.8000 $881.40 $100.0000 $1,300.00
685.1102 Wht Epoxy Reflect Pavnt Strip 20 mil 8,131 LF $1.2500 $10,163.75 $1.5000 $12,196.50 $1.4000 $11,383.40 $1.4500 $11,789.95 $1.2500 $10,163.75
685.1202 Yell Epoxy Reflect Pavnt Strip 20 mil 3,450 LF $1.2500 $4,312.50 $1.5000 $5,175.00 $1.4000 $4,830.00 $1.4500 $5,002.50 $1.2500 $4,312.50
691.04000020 TRAINING REQUIREMENTS 40,000 DC $1.0000 $40,000.00 $1.0000 $40,000.00 $1.0000 $40,000.00 $1.0000 $40,000.00 $1.0000 $40,000.00
697.03 FIELD CHANGE PAYMENT 194,000 DC $1.0000 $194,000.00 $1.0000 $194,000.00 $1.0000 $194,000.00 $1.0000 $194,000.00 $1.0000 $194,000.00
698.04 ASPHALT PRICE ADJUSTMENT 1,132 DC $1.0000 $1,132.00 $1.0000 $1,132.00 $1.0000 $1,132.00 $1.0000 $1,132.00 $1.0000 $1,132.00
698.05 FUEL PRICE ADJUSTMENT 2,097 DC $1.0000 $2,097.00 $1.0000 $2,097.00 $1.0000 $2,097.00 $1.0000 $2,097.00 $1.0000 $2,097.00
698.06 STEEL/IRON PRICE ADJUSTMENT 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
699.040001 MOBILIZATION 1 LS $165,000.8700 $165,000.87 $175,162.8300 $175,162.83 $176,000.0000 $176,000.00 $190,018.4000 $190,018.40 $200,030.0000 $200,030.00