NY
New York DOT · Bid Tabulation
Contract D265652
Highway Maintenance & Improvements - Rtes NY25, NY25A, NY109, 908K, NY27, Various Locations
- County
- Nassau, Suffolk
- Letting
- February 26, 2026
- Bidders
- 2
Apparent low bid
GGG CONSTRUCTION CORP
$6,891,958.54
Other bidders
QUINTAL CONTRACTING CORP
$7,520,114.44
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | GGG CONSTRUCTION CORP $6,891,958.54 | QUINTAL CONTRACTING CORP $7,520,114.44 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| 201.06 | CLEARING AND GRUBBING | 1 | LS | $35,000.0000 | $35,000.00 | $10,000.0000 | $10,000.00 |
| 203.02 | UNCLASSIFIED EXCAVATION AND DISPOSAL | 1,188 | CY | $150.0000 | $178,200.00 | $105.0000 | $124,740.00 |
| 203.02990006 | PAVEMENT EXCAVATION | 240 | SF | $150.0000 | $36,000.00 | $60.0000 | $14,400.00 |
| 203.03 | EMBANKMENT IN PLACE | 573 | CY | $50.0000 | $28,650.00 | $87.0000 | $49,851.00 |
| 203.07 | SELECT GRANULAR FILL | 427 | CY | $35.0000 | $14,945.00 | $87.0000 | $37,149.00 |
| 206.0201 | TRENCH AND CULVERT EXCAVATION | 1,053 | CY | $25.0000 | $26,325.00 | $90.0000 | $94,770.00 |
| 206.03100010 | TRAF SIG CONDUIT EXCAVATION AND BACKFILL | 55 | LF | $150.0000 | $8,250.00 | $100.0000 | $5,500.00 |
| 206.05 | TEST PIT EXCAVATION | 9 | EACH | $1,500.0000 | $13,500.00 | $1,200.0000 | $10,800.00 |
| 208.5601 | SWTD Over 5 cfs Up to 7 cfs | 1 | EACH | $150,000.0000 | $150,000.00 | $140,000.0000 | $140,000.00 |
| 209.11010024 | Temp Catc bas Ins Tras Sedim Debr Contrl | 14 | EACH | $200.0000 | $2,800.00 | $425.0000 | $5,950.00 |
| 304.10119917 | SUBBASE COURSE, TYPE 1011-2 | 453 | CY | $150.0000 | $67,950.00 | $140.0000 | $63,420.00 |
| 404.0002 | Pavement Density Quality Adjus Asph Item | 678 | QU | $90.3100 | $61,230.18 | $90.3100 | $61,230.18 |
| 404.0003 | Longit Joint Density Quality Adjus Asph | 526 | QU | $103.4900 | $54,435.74 | $103.4900 | $54,435.74 |
| 404.0189 | T&L F9 Asph 80 Comp Ser | 239 | TON | $300.0000 | $71,700.00 | $495.0000 | $118,305.00 |
| 404.0961 | 9.5 F1 Top Cour Asph 60 Ser Comp | 585 | TON | $300.0000 | $175,500.00 | $495.0000 | $289,575.00 |
| 404.1289 | 12.5 F9 T&L Should Cour Asph 80 Ser Comp | 174 | TON | $300.0000 | $52,200.00 | $495.0000 | $86,130.00 |
| 404.1989 | 19 F9 Binder Cour Asph 80 Ser Comp | 159 | TON | $300.0000 | $47,700.00 | $495.0000 | $78,705.00 |
| 404.3789 | 37.5 F9 Base Cour Asph 80 Ser Comp | 3,812 | TON | $125.0000 | $476,500.00 | $375.0000 | $1,429,500.00 |
| 407.0102 | DILUTED TACK COAT | 4,442 | GAL | $12.0000 | $53,304.00 | $24.0000 | $106,608.00 |
| 410.30 | BITUMINOUS MATERIAL CHIP SEAL | 1 | GAL | $5,000.0000 | $5,000.00 | $750.0000 | $750.00 |
| 413.04030118 | MICRO-SURFACING, TYPE III, RUT FILLING | 1 | TON | $5,000.0000 | $5,000.00 | $7,500.0000 | $7,500.00 |
| 415.03010118 | PAVER PLACED SURFACE TREATMENT TYPE C,F1 | 1 | TON | $5,000.0000 | $5,000.00 | $9,500.0000 | $9,500.00 |
| 418.7603 | ASPHALT PAVEMENT JOINT ADHESIVE | 2,828 | LF | $10.0000 | $28,280.00 | $5.7500 | $16,261.00 |
| 490.10 | PROD COLD MILLING BITUMINOUS CONCRETE | 3,645 | SY | $25.0000 | $91,125.00 | $24.5000 | $89,302.50 |
| 502.9100 | Transverse Joints, Epoxy Coated | 3,164 | LF | $30.0000 | $94,920.00 | $25.0000 | $79,100.00 |
| 502.9110 | Longitudinal Joints, Epoxy Coated | 2,912 | LF | $15.0000 | $43,680.00 | $25.0000 | $72,800.00 |
| 502.9210 | SEALING TRANSVERSE JOINTS HIGHWAY JT SEL | 3,595 | LF | $18.0000 | $64,710.00 | $7.5000 | $26,962.50 |
| 502.9310 | Seal Longitud Joint - Highway Joint Seal | 2,912 | LF | $18.0000 | $52,416.00 | $8.0000 | $23,296.00 |
| 503.1013 | PCC Foundation for Pavement, PEM | 142 | CY | $1,750.0000 | $248,500.00 | $1,500.0000 | $213,000.00 |
| 505.0402 | Prod Diamond Grind - Pvmt Pres w/Sl Rem | 121,986 | SY | $12.5000 | $1,524,825.00 | $8.7500 | $1,067,377.50 |
| 510.81000018 | DRILL AND ANCH DOWELS PCC PAV REP | 4,112 | EACH | $35.0000 | $143,920.00 | $56.0000 | $230,272.00 |
| 511.10000018 | PARTL-DPTH RER OF PORtND CEMNT CONC PAV | 6 | SF | $3,000.0000 | $18,000.00 | $1,000.0000 | $6,000.00 |
| 520.05000010 | SAW CUTTING PCC AND COMPOSITE PAVEMENT | 370 | LF | $12.0000 | $4,440.00 | $9.0000 | $3,330.00 |
| 520.09000010 | SAW CUTTING ASPHALT CONCRETE | 1,909 | LF | $9.0000 | $17,181.00 | $8.0000 | $15,272.00 |
| 552.12 | TEMPORARY TIMBER SHEETING | 5,403 | SF | $7.5000 | $40,522.50 | $25.0000 | $135,075.00 |
| 552.14 | INTERIM TIMBER SHEETING | 96 | SF | $30.0000 | $2,880.00 | $85.0000 | $8,160.00 |
| 552.17 | SHIELDS AND SHORING | 3,009 | SF | $5.0000 | $15,045.00 | $20.0000 | $60,180.00 |
| 555.0021 | Concrete for Structures, Performance | 37 | CY | $2,500.0000 | $92,500.00 | $2,000.0000 | $74,000.00 |
| 555.72950010 | ARCHIT TREAT VERT STAINED CONC SURFACES | 186 | SF | $100.0000 | $18,600.00 | $155.0000 | $28,830.00 |
| 555.9902 | Performance Concrete Quality F Struct | 1 | QU | $9.3200 | $9.32 | $9.3200 | $9.32 |
| 556.0202 | EPOXY-COATED BAR REINFORCEMENT FOR STRUC | 3,190 | LB | $6.0000 | $19,140.00 | $4.0000 | $12,760.00 |
| 559.91100010 | ANTI-GRAFFITI PROTECTIVE COATING | 186 | SF | $40.0000 | $7,440.00 | $18.0000 | $3,348.00 |
| 603.6002 | REINF CONC PIPE CLASS III, 15 DIA | 408 | LF | $200.0000 | $81,600.00 | $275.0000 | $112,200.00 |
| 603.6003 | REINF CONC PIPE CLASS III, 18 DIA | 87 | LF | $200.0000 | $17,400.00 | $300.0000 | $26,100.00 |
| 604.07240110 | REBUILDING TOP OF EXISTING DRAIN STRUC | 2 | EACH | $6,000.0000 | $12,000.00 | $10,000.0000 | $20,000.00 |
| 604.07260011 | CONNECTION TO EXISTING DRAIN FACILITIES | 1 | EACH | $5,000.0000 | $5,000.00 | $15,000.0000 | $15,000.00 |
| 604.501011 | SPECIAL DRAINAGE STRUCTURE | 11 | LF | $2,000.0000 | $22,000.00 | $2,500.0000 | $27,500.00 |
| 604.501012 | SPECIAL DRAINAGE STRUCTURE | 27 | LF | $2,500.0000 | $67,500.00 | $1,250.0000 | $33,750.00 |
| 604.501023 | SPECIAL DRAINAGE STRUCTURE | 8 | LF | $2,750.0000 | $22,000.00 | $1,900.0000 | $15,200.00 |
| 604.50180010 | OFFSET CATCH BASIN | 19 | LF | $4,000.0000 | $76,000.00 | $1,500.0000 | $28,500.00 |
| 608.01020005 | COLOR& IMPRNT CC SIDEWALK | 9 | CY | $1,800.0000 | $16,200.00 | $2,900.0000 | $26,100.00 |
| 608.01050010 | CONC SIDEWALKS-UNREINF (GRADE INCLUDED) | 60 | CY | $1,500.0000 | $90,000.00 | $1,400.0000 | $84,000.00 |
| 608.01050109 | CURB RAMP CONFIGURATION TYPE 1 | 2 | EACH | $7,500.0000 | $15,000.00 | $7,500.0000 | $15,000.00 |
| 608.01050309 | CURB RAMP CONFIGURATION TYPE 3 | 1 | EACH | $8,000.0000 | $8,000.00 | $14,000.0000 | $14,000.00 |
| 608.02010015 | Unclass Excv & Disp-Sidewalks, CR, Curbs | 26 | CY | $150.0000 | $3,900.00 | $375.0000 | $9,750.00 |
| 608.02020015 | Opt Type Subbase for Sidewalks, CR, Curb | 92 | CY | $150.0000 | $13,800.00 | $100.0000 | $9,200.00 |
| 609.0405 | CAST-IN-PLACE CONCRETE CURB TYPE M4 | 61 | LF | $105.0000 | $6,405.00 | $65.0000 | $3,965.00 |
| 609.0406 | CAST-IN-PLACE CONCRETE CURB TYPE M4A | 392 | LF | $105.0000 | $41,160.00 | $90.0000 | $35,280.00 |
| 609.0407 | CAST-IN-PLACE CONCRETE CURB TYPE T4 | 129 | LF | $105.0000 | $13,545.00 | $115.0000 | $14,835.00 |
| 609.0901 | OPT CURV PRCST TYPE PVF6/CASTINPLVF6 | 563 | LF | $105.0000 | $59,115.00 | $65.0000 | $36,595.00 |
| 610.0701 | MYCORRHIZAL FUNGI | 5 | LB | $85.0000 | $425.00 | $200.0000 | $1,000.00 |
| 610.08 | MOISTURE RETENTION ADDITIVE | 24 | LB | $50.0000 | $1,200.00 | $100.0000 | $2,400.00 |
| 610.1402 | TOPSOIL - ROADSIDE | 48 | CY | $150.0000 | $7,200.00 | $79.0000 | $3,792.00 |
| 610.1601 | TURF ESTABLISHMENT - ROADSIDE | 430 | SY | $8.5000 | $3,655.00 | $4.7500 | $2,042.50 |
| 610.17 | WILDFLOWER SEEDING | 693 | SY | $10.0000 | $6,930.00 | $10.0000 | $6,930.00 |
| 610.19 | WATERING VEGETATION | 4 | MGAL | $600.0000 | $2,400.00 | $2,000.0000 | $8,000.00 |
| 610.22 | MOWING LIMITS MARKERS | 7 | EACH | $150.0000 | $1,050.00 | $15.0000 | $105.00 |
| 611.0161 | PLANT MAJOR DECIDUOUS TREE 2 1/2" CALIP | 6 | EACH | $1,500.0000 | $9,000.00 | $950.0000 | $5,700.00 |
| 611.0461 | PLANTING DECIDUOUS SHRUBS - 4FT HT/SPR | 15 | EACH | $150.0000 | $2,250.00 | $200.0000 | $3,000.00 |
| 611.0561 | PLANTING EVERGREEN SHRUBS - 3FT HT/SPR | 15 | EACH | $135.0000 | $2,025.00 | $250.0000 | $3,750.00 |
| 611.19010024 | POST PLANT CARE W REPLACE - MJ DECID TRE | 6 | EACH | $325.0000 | $1,950.00 | $600.0000 | $3,600.00 |
| 611.19040024 | POST PLANT CARE W REPLACE - DECID SHRUBS | 15 | EACH | $65.0000 | $975.00 | $150.0000 | $2,250.00 |
| 611.19050024 | POST PLANT CARE W REPLACE - EVERGR SHRUB | 15 | EACH | $50.0000 | $750.00 | $250.0000 | $3,750.00 |
| 614.060104 | TREE REMV >4" - 6" DIA BREAST HEIGHT | 3 | EACH | $1,000.0000 | $3,000.00 | $350.0000 | $1,050.00 |
| 614.060204 | TREE REMV >6" - 12" DIA BREAST HEIGHT | 19 | EACH | $1,800.0000 | $34,200.00 | $875.0000 | $16,625.00 |
| 614.060304 | TREE REMV >12" - 18" DIA BREAST HEIGHT | 3 | EACH | $3,250.0000 | $9,750.00 | $1,500.0000 | $4,500.00 |
| 614.060404 | TREE REMV >18" - 24" DIA BREAST HEIGHT | 1 | EACH | $4,000.0000 | $4,000.00 | $1,900.0000 | $1,900.00 |
| 619.01 | BASIC WORK ZONE TRAFFIC CONTROL | 1 | LS | $500,000.0000 | $500,000.00 | $585,000.0000 | $585,000.00 |
| 619.04 | TYPE III CONSTRUCTION BARRICADE | 21 | EACH | $350.0000 | $7,350.00 | $50.0000 | $1,050.00 |
| 619.080102 | REMOVE PVMT MARKING STRIPES, EPOXY PAINT | 1,624 | LF | $2.5000 | $4,060.00 | $3.5000 | $5,684.00 |
| 619.100102 | INTERIM PAVE MARKING, STRIPE(EPOX PAINT) | 8,132 | LF | $1.1000 | $8,945.20 | $1.2500 | $10,165.00 |
| 619.100202 | INTERIM PAVE MARKING, SYMBOL(EPOX PAINT) | 2 | EACH | $230.0000 | $460.00 | $280.0000 | $560.00 |
| 619.100302 | INTERIM PAVE MARKING, LETTER(EPOX PAINT) | 8 | EACH | $170.0000 | $1,360.00 | $280.0000 | $2,240.00 |
| 619.10050020 | Portable Work Zone Camera | 600 | DVDY | $6.0000 | $3,600.00 | $12.0000 | $7,200.00 |
| 619.111133 | PVMS STD SIZ LC MATR LED CTV CAM, NTCIP | 16 | EACH | $10,000.0000 | $160,000.00 | $5,000.0000 | $80,000.00 |
| 619.1611 | MAINTAIN TRAF SIG EQUIP (REQUIREMENT A) | 18 | INTM | $529.0000 | $9,522.00 | $650.0000 | $11,700.00 |
| 619.1712 | Temp Positive Barrier Cat 2 Pin Premited | 80 | LF | $150.0000 | $12,000.00 | $175.0000 | $14,000.00 |
| 619.1719 | Warning Lights on Temp Pos Barriers | 4 | EACH | $100.0000 | $400.00 | $100.0000 | $400.00 |
| 619.1803 | TEMP IMPACT ATTENU - REDIR (TEST LEV 3) | 1 | EACH | $7,500.0000 | $7,500.00 | $10,000.0000 | $10,000.00 |
| 619.24 | Nighttime Operations (Entire Project) | 1 | LS | $250,000.0000 | $250,000.00 | $795.0000 | $795.00 |
| 621.03 | CLEANING CLOSED DRAINAGE SYSTEMS | 24 | LF | $50.0000 | $1,200.00 | $200.0000 | $4,800.00 |
| 621.04 | CLEANING DRAINAGE STRUCTURES | 5 | EACH | $1,500.0000 | $7,500.00 | $1,500.0000 | $7,500.00 |
| 623.12 | CRUSHED STONE (IN-PLACE MEASURE) | 6 | CY | $200.0000 | $1,200.00 | $120.0000 | $720.00 |
| 623.12010004 | CRUSHED AGGREGATE FOR UNDERDRAIN | 10 | CY | $200.0000 | $2,000.00 | $125.0000 | $1,250.00 |
| 625.01 | SURVEY OPERATIONS | 1 | LS | $50,000.0000 | $50,000.00 | $50,000.0000 | $50,000.00 |
| 633.12 | CLEANING, SEALING AND/OR FILLING CRACKS | 1 | LS | $15,000.0000 | $15,000.00 | $18,000.0000 | $18,000.00 |
| 637.04 | Concrete Cylinder Curing Equipment | 1 | EACH | $2,000.0000 | $2,000.00 | $4,000.0000 | $4,000.00 |
| 637.13 | ENGINEER'S FIELD OFFICE - TYPE 3 | 14 | MNTH | $5,500.0000 | $77,000.00 | $7,500.0000 | $105,000.00 |
| 637.34 | OFFICE TECHNOLOGY AND SUPPLIES | 5,000 | DC | $1.0000 | $5,000.00 | $1.0000 | $5,000.00 |
| 637.36 | CONSTRUCTION TESTING SUPPLY CONSUMABLES | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 637.41000115 | DIGITAL INSPECTION DEVICE | 14 | MNTH | $500.0000 | $7,000.00 | $300.0000 | $4,200.00 |
| 637.41000215 | DIGITAL INSPECTION DEVICE | 14 | MNTH | $500.0000 | $7,000.00 | $300.0000 | $4,200.00 |
| 637.41000315 | DIGITAL INSPECTION DEVICE | 14 | MNTH | $500.0000 | $7,000.00 | $300.0000 | $4,200.00 |
| 637.41000415 | DIGITAL INSPECTION DEVICE | 14 | MNTH | $500.0000 | $7,000.00 | $300.0000 | $4,200.00 |
| 637.41000515 | DIGITAL INSPECTION DEVICE | 14 | MNTH | $500.0000 | $7,000.00 | $300.0000 | $4,200.00 |
| 645.5102 | GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR | 26 | SF | $150.0000 | $3,900.00 | $500.0000 | $13,000.00 |
| 645.81 | TYPE A SIGN POSTS | 5 | EACH | $500.0000 | $2,500.00 | $350.0000 | $1,750.00 |
| 647.18010108 | RELOCATE COMMERCIAL SIGN | 1 | EACH | $2,500.0000 | $2,500.00 | $2,500.0000 | $2,500.00 |
| 647.31 | RELOC SIGN PANEL ASEMB SZ I UNDER 30SF | 3 | EACH | $2,000.0000 | $6,000.00 | $1,500.0000 | $4,500.00 |
| 647.41 | REMV STR SIGN PANEL ASEMB SZ I UND 30SF | 1 | EACH | $1,500.0000 | $1,500.00 | $800.0000 | $800.00 |
| 647.51 | REMV DISP SIGN PANEL ASEMB SZ I UND 30SF | 3 | EACH | $1,500.0000 | $4,500.00 | $700.0000 | $2,100.00 |
| 647.61 | REMV DISP GR MT TY A SUP FND SIGN SZ I | 4 | EACH | $2,000.0000 | $8,000.00 | $750.0000 | $3,000.00 |
| 655.07030010 | CAST FRM F3,W/O CURB BOX & RET GRATE G3 | 1 | EACH | $3,000.0000 | $3,000.00 | $3,500.0000 | $3,500.00 |
| 655.0706 | CAST FRAME F3 UNMT CB BOX CU3, GRATE G3 | 10 | EACH | $3,500.0000 | $35,000.00 | $3,000.0000 | $30,000.00 |
| 655.1202 | MANHOLE FRAME AND COVER | 5 | EACH | $2,000.0000 | $10,000.00 | $1,575.0000 | $7,875.00 |
| 663.33 | ADJUST EXISTING VALVE BOX ELEVATION | 1 | EACH | $500.0000 | $500.00 | $1,500.0000 | $1,500.00 |
| 680.05010007 | 360 Degree Camera Video Detection System | 1 | EACH | $36,655.0000 | $36,655.00 | $43,030.0000 | $43,030.00 |
| 680.05020007 | 360 Degree Camera Assembly | 1 | EACH | $4,746.0000 | $4,746.00 | $6,500.0000 | $6,500.00 |
| 680.5001 | POLE EXCAVATION AND CONCRETE FOUNDATION | 18 | CY | $2,700.0000 | $48,600.00 | $1,500.0000 | $27,000.00 |
| 680.51050010 | PULBOX, RECT REINF CONC(26 IN X 18 INCH) | 2 | EACH | $3,500.0000 | $7,000.00 | $3,500.0000 | $7,000.00 |
| 680.520103 | CONDUIT, METAL STEEL, ZINC CTD, 1" | 16 | LF | $62.0000 | $992.00 | $80.0000 | $1,280.00 |
| 680.520106 | CONDUIT, METAL STEEL, ZINC CTD, 2" | 25 | LF | $48.0000 | $1,200.00 | $80.0000 | $2,000.00 |
| 680.520108 | CONDUIT, METAL STEEL, ZINC COATED, 3" | 14 | LF | $58.0000 | $812.00 | $80.0000 | $1,120.00 |
| 680.520110 | CONDUIT, METAL STEEL, ZINC CTD, 4" | 16 | LF | $83.0000 | $1,328.00 | $97.0000 | $1,552.00 |
| 680.7001 | SINGLE SPAN WIRE ASSEMBLY | 2 | EACH | $3,137.0000 | $6,274.00 | $3,683.0000 | $7,366.00 |
| 680.730214 | SIGNAL CABLE 2 CONDUCTORS, 14 AWG | 182 | LF | $16.0000 | $2,912.00 | $19.0000 | $3,458.00 |
| 680.730514 | SIGNAL CABLE 5 CONDUCTORS, 14 AWG | 4,407 | LF | $5.0000 | $22,035.00 | $5.2500 | $23,136.75 |
| 680.731014 | SIGNAL CABLE 10 CONDUCTORS, 14 AWG | 1,247 | LF | $7.0000 | $8,729.00 | $7.3000 | $9,103.10 |
| 680.79400010 | REM AUXILIARY POLE AND PEDESTRIAN POST | 1 | EACH | $1,000.0000 | $1,000.00 | $497.0000 | $497.00 |
| 680.79490010 | REMOVE TRAFFIC SIGNAL PULLBOXES | 1 | EACH | $1,500.0000 | $1,500.00 | $2,500.0000 | $2,500.00 |
| 680.810101 | T.S. MODULE - 12 INCH, RED BALL, LED | 10 | EACH | $183.0000 | $1,830.00 | $215.0000 | $2,150.00 |
| 680.810102 | T.S. MODULE - 12 INCH, RED ARROW, LED | 5 | EACH | $214.0000 | $1,070.00 | $251.0000 | $1,255.00 |
| 680.810103 | T.S. MODULE- 12 INCH, YELLOW BALL LED | 10 | EACH | $183.0000 | $1,830.00 | $215.0000 | $2,150.00 |
| 680.810104 | T.S. MODULE- 12 INCH, YELLOW ARROW LED | 10 | EACH | $192.0000 | $1,920.00 | $225.0000 | $2,250.00 |
| 680.810105 | T.S. MODULE - 12 INCH GREEN BALL, LED | 10 | EACH | $183.0000 | $1,830.00 | $215.0000 | $2,150.00 |
| 680.810106 | T.S. MODULE - 12 INCH GREEN ARROW, LED | 7 | EACH | $207.0000 | $1,449.00 | $243.0000 | $1,701.00 |
| 680.810601 | T.S. SECTION - POLY, TYPE I, 12 INCH | 52 | EACH | $533.0000 | $27,716.00 | $625.0000 | $32,500.00 |
| 680.8111 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 1 WAY | 15 | EACH | $607.0000 | $9,105.00 | $713.0000 | $10,695.00 |
| 680.8112 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 2 WAY | 3 | EACH | $1,031.0000 | $3,093.00 | $1,210.0000 | $3,630.00 |
| 680.813108 | PED SIGN SECT,TYP I-16''X18'' LED MODULE | 1 | EACH | $690.0000 | $690.00 | $810.0000 | $810.00 |
| 680.8141 | PEDESTRIAN SIGNAL BRACKET MOUNT ASSEMBLY | 1 | EACH | $519.0000 | $519.00 | $609.0000 | $609.00 |
| 680.815002 | Ped Sign Mod Bi-Modal Hand/Man LED | 1 | EACH | $455.0000 | $455.00 | $533.0000 | $533.00 |
| 680.8151 | Acces Ped Sign w/o Post | 6 | EACH | $1,350.0000 | $8,100.00 | $1,585.0000 | $9,510.00 |
| 680.8152 | Acces Ped Sign w Post | 2 | EACH | $4,200.0000 | $8,400.00 | $2,945.0000 | $5,890.00 |
| 680.8199 | Backplates for Traffic Signal Heads | 15 | EACH | $641.0000 | $9,615.00 | $752.0000 | $11,280.00 |
| 680.8204 | OVERHEAD SIGN ASSEMBLY, TYPE D | 4 | EACH | $1,330.0000 | $5,320.00 | $1,560.0000 | $6,240.00 |
| 680.8207 | OVERHEAD SIGN ASSEMBLY, TYPE G | 2 | EACH | $1,467.0000 | $2,934.00 | $1,683.5000 | $3,367.00 |
| 680.82250101 | REM PED PSHBUTN AND SIGN ASSEMB | 7 | EACH | $212.0000 | $1,484.00 | $248.0000 | $1,736.00 |
| 680.82507010 | INSTAL/TRANS OP DETECT EQIP OWN BY OTHER | 1 | EACH | $2,100.0000 | $2,100.00 | $2,465.0000 | $2,465.00 |
| 680.82540009 | PREEMP SYS-DETEC CABL-SHLD 3 CON 20G-GRN | 1,007 | LF | $6.0000 | $6,042.00 | $6.6000 | $6,646.20 |
| 680.83200010 | LOCATE&MARKOUT INFORM&STATE LIGHT FACIL | 1 | LS | $1,668.0000 | $1,668.00 | $5,000.0000 | $5,000.00 |
| 680.85166010 | MAST ARM POLE ROT FATIGU DES 16MT 60 LEN | 1 | EACH | $48,865.0000 | $48,865.00 | $57,363.0000 | $57,363.00 |
| 680.85166510 | MAST ARM POLE ROT FATIGU DES 16MT 65 LEN | 1 | EACH | $49,753.0000 | $49,753.00 | $58,405.0000 | $58,405.00 |
| 680.99 | Performance Concrete Quality Adjustment | 2 | QU | $11.0000 | $22.00 | $11.0000 | $22.00 |
| 680.99100010 | REM TRF SIG SP WIRE ASSEMB WI TRF SIG HD | 1 | EACH | $6,342.0000 | $6,342.00 | $7,445.0000 | $7,445.00 |
| 685.07150110 | WHITE EPOXY REFL PVMT STRP 15 MIL WNVS | 17,661 | LF | $1.1000 | $19,427.10 | $1.0500 | $18,544.05 |
| 685.07150310 | WHITE EPOXY REFL PVMT SYMBOL 15 MIL WNVS | 14 | EACH | $205.0000 | $2,870.00 | $222.7500 | $3,118.50 |
| 685.07150410 | WHITE EPOXY REFL CROSS HATCH 15 MIL WNVS | 2,904 | LF | $2.5000 | $7,260.00 | $2.6500 | $7,695.60 |
| 685.07150610 | YELLOW EPOXY REFL PVMT STRP 15 MIL WNVS | 14,245 | LF | $1.1000 | $15,669.50 | $1.0500 | $14,957.25 |
| 685.07150710 | YELW EPOXY REFL PVMT STRP CH15 MIL WNVS | 210 | LF | $2.5000 | $525.00 | $2.6500 | $556.50 |
| 685.07150810 | WHITE EPOXY REFL PVMT YLS SM 15 MIL WNVS | 9 | EACH | $55.0000 | $495.00 | $60.0000 | $540.00 |
| 697.03 | FIELD CHANGE PAYMENT | 230,000 | DC | $1.0000 | $230,000.00 | $1.0000 | $230,000.00 |
| 698.04 | ASPHALT PRICE ADJUSTMENT | 6,211 | DC | $1.0000 | $6,211.00 | $1.0000 | $6,211.00 |
| 698.05 | FUEL PRICE ADJUSTMENT | 1,085 | DC | $1.0000 | $1,085.00 | $1.0000 | $1,085.00 |
| 698.06 | STEEL/IRON PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 699.040001 | MOBILIZATION | 1 | LS | $265,075.0000 | $265,075.00 | $287,748.2500 | $287,748.25 |
Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →