NY New York DOT · Bid Tabulation

Contract D265675

OVERHEAD SIGN REPAIR/ REPLACE - Various Locations.

County
Broome, Sullivan
Letting
February 26, 2026
Bidders
3
Apparent low bid ELDERLEE INC $2,046,760.00
Other bidders ECONOMY PAVING CO INC $2,398,983.20 ROAD SAFETY SYSTEMS LLC $3,183,126.80

Bid Items - unit price and extension by bidder

Item Description Qty UOM ELDERLEE INC $2,046,760.00 ECONOMY PAVING CO INC $2,398,983.20 ROAD SAFETY SYSTEMS LLC $3,183,126.80
Unit Price Extension Unit Price Extension Unit Price Extension
201.06 CLEARING AND GRUBBING 1 LS $1,000.0000 $1,000.00 $1,000.0000 $1,000.00 $17,133.4000 $17,133.40
206.05 TEST PIT EXCAVATION 9 EACH $400.0000 $3,600.00 $5,000.0000 $45,000.00 $1,837.1000 $16,533.90
209.1703 DRAINAGE STRUCTURE INLET PROT, PREFAB TM 30 LF $35.0000 $1,050.00 $10.0000 $300.00 $28.7000 $861.00
209.23010009 Biodegradable Sediment Filter Log 12 400 LF $11.0000 $4,400.00 $10.0000 $4,000.00 $22.2000 $8,880.00
564.700001 STRUCTURAL STEEL REPLACEMENT 2 EACH $3,500.0000 $7,000.00 $250.0000 $500.00 $2,000.0000 $4,000.00
606.10 BOX BEAM GUIDE RAILING 54 LF $52.0000 $2,808.00 $100.0000 $5,400.00 $65.0000 $3,510.00
606.11 BOX BEAM MEDIAN BARRIER 216 LF $68.0000 $14,688.00 $100.0000 $21,600.00 $71.0000 $15,336.00
606.120101 BOX BEAM END PIECE 1 EACH $820.0000 $820.00 $1,000.0000 $1,000.00 $740.0000 $740.00
606.1402 BX BM MED BARR END ASSEMB, TYPE B 2 EACH $3,300.0000 $6,600.00 $2,500.0000 $5,000.00 $6,500.0000 $13,000.00
606.1403 BX BM MED BARR END ASSEMBL, TYPE C 1 EACH $11,000.0000 $11,000.00 $7,500.0000 $7,500.00 $9,000.0000 $9,000.00
606.73 REMOVING AND DISP BOX BEAM GUIDERAILING 7 LF $2.0000 $14.00 $20.0000 $140.00 $3.5000 $24.50
606.74 REMOVING AND DISP BOX BM MEDIAN BARRIER 96 LF $4.0000 $384.00 $20.0000 $1,920.00 $4.0000 $384.00
606.7930 REM&DISP BX BM MED BARR END ASSEMB -TY A 3 EACH $50.0000 $150.00 $200.0000 $600.00 $815.0000 $2,445.00
617.11000024 EQUIP CLEANING FOR INVASIVE PLANT SPECIE 1 LS $500.0000 $500.00 $1,000.0000 $1,000.00 $1,750.0000 $1,750.00
619.01 BASIC WORK ZONE TRAFFIC CONTROL 1 LS $183,127.0000 $183,127.00 $275,000.0000 $275,000.00 $507,000.0000 $507,000.00
619.111213 PVMS STD SIZ LC MATR LED NO EQU, CEL CM 60 CW $50.0000 $3,000.00 $100.0000 $6,000.00 $785.0000 $47,100.00
619.24 Nighttime Operations (Entire Project) 1 LS $21,000.0000 $21,000.00 $25,000.0000 $25,000.00 $190,000.0000 $190,000.00
619.25 TRAFFIC CONTROL SUPERVISOR 14 MNTH $690.0000 $9,660.00 $1,000.0000 $14,000.00 $1,500.0000 $21,000.00
625.01 SURVEY OPERATIONS 1 LS $45,750.0000 $45,750.00 $50,000.0000 $50,000.00 $108,000.0000 $108,000.00
637.04 Concrete Cylinder Curing Equipment 1 EACH $2,000.0000 $2,000.00 $10,000.0000 $10,000.00 $8,000.0000 $8,000.00
637.12 ENGINEER'S FIELD OFFICE - TYPE 2 14 MNTH $4,000.0000 $56,000.00 $3,000.0000 $42,000.00 $3,100.0000 $43,400.00
637.34 OFFICE TECHNOLOGY AND SUPPLIES 1,000 DC $1.0000 $1,000.00 $1.0000 $1,000.00 $1.0000 $1,000.00
637.36 CONSTRUCTION TESTING SUPPLY CONSUMABLES 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
644.11 ANCHOR BOLTS 3,779 LB $10.0000 $37,790.00 $20.0000 $75,580.00 $18.0000 $68,022.00
644.20 DRILLED SHAFT FOR OVERHEAD SIGN STRUCTUR 103 CY $4,500.0000 $463,500.00 $3,500.0000 $360,500.00 $7,495.0000 $771,985.00
644.420810 TRSSD ARM CTLVR SGN STRC(8Y ARM, 10Y AR) 1 EACH $55,000.0000 $55,000.00 $95,000.0000 $95,000.00 $53,150.0000 $53,150.00
644.421215 TRSSD ARM CTLVR SGN STRC(12Y AM, 15Y AR) 1 EACH $80,000.0000 $80,000.00 $105,000.0000 $105,000.00 $90,000.0000 $90,000.00
644.421425 TRSSD ARM CTLVR SGN STRC(14Y ARM,25Y AR) 1 EACH $105,000.0000 $105,000.00 $135,000.0000 $135,000.00 $103,350.0000 $103,350.00
644.433030 SNGL SPN SGN STRC (30Y MX SPN, 30Y AREA) 1 EACH $135,000.0000 $135,000.00 $155,000.0000 $155,000.00 $127,000.0000 $127,000.00
644.433060 SNGL SPN SGN STRC (30Y MX SPN, 60Y AREA) 1 EACH $160,000.0000 $160,000.00 $175,000.0000 $175,000.00 $160,000.0000 $160,000.00
644.435560 SNGL SPN SGN STRC (55Y MX SPN, 60Y AREA) 1 EACH $260,000.0000 $260,000.00 $295,000.0000 $295,000.00 $275,000.0000 $275,000.00
644.99 Performance Concrete Quality Adjustment 1 QU $20.0000 $20.00 $20.0000 $20.00 $20.0000 $20.00
645.5102 GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR 16 SF $30.0000 $480.00 $100.0000 $1,600.00 $88.0000 $1,408.00
645.61 OVERHEAD SIGN PANELS 1,581.5 SF $36.0000 $56,934.00 $55.0000 $86,982.50 $60.0000 $94,890.00
645.8106 HIGH CAPACITY TYPE A SIGN POSTS SOIL PL 2 EACH $870.0000 $1,740.00 $2,000.0000 $4,000.00 $1,850.0000 $3,700.00
646.23 LG DEL,LG SN P MARK,LG SUPL SN P MARK PA 5 EACH $17.0000 $85.00 $100.0000 $500.00 $61.0000 $305.00
646.32 STEEL POST, 2.0 LB/FT 4 EACH $65.0000 $260.00 $300.0000 $1,200.00 $93.0000 $372.00
647.20 REMOV CANTILEVER OVHD SIGN PAN STR FOUND 2 EACH $11,000.0000 $22,000.00 $15,000.0000 $30,000.00 $18,500.0000 $37,000.00
647.21 REMOV SNG SPAN OVHD SIGN PANEL STR FOUND 5 EACH $24,000.0000 $120,000.00 $35,000.0000 $175,000.00 $32,000.0000 $160,000.00
697.03 FIELD CHANGE PAYMENT 95,000 DC $1.0000 $95,000.00 $1.0000 $95,000.00 $1.0000 $95,000.00
698.04 ASPHALT PRICE ADJUSTMENT 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
698.05 FUEL PRICE ADJUSTMENT 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
698.06 STEEL/IRON PRICE ADJUSTMENT 100 DC $1.0000 $100.00 $1.0000 $100.00 $1.0000 $100.00
699.040001 MOBILIZATION 1 LS $78,000.0000 $78,000.00 $90,240.7000 $90,240.70 $122,427.0000 $122,427.00

Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.

Want the analysis, not just the numbers? DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel. Explore DOTestimate →