NY
New York DOT · Bid Tabulation
Contract D265675
OVERHEAD SIGN REPAIR/ REPLACE - Various Locations.
- County
- Broome, Sullivan
- Letting
- February 26, 2026
- Bidders
- 3
Apparent low bid
ELDERLEE INC
$2,046,760.00
Other bidders
ECONOMY PAVING CO INC
$2,398,983.20
ROAD SAFETY SYSTEMS LLC
$3,183,126.80
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | ELDERLEE INC $2,046,760.00 | ECONOMY PAVING CO INC $2,398,983.20 | ROAD SAFETY SYSTEMS LLC $3,183,126.80 | |||
|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201.06 | CLEARING AND GRUBBING | 1 | LS | $1,000.0000 | $1,000.00 | $1,000.0000 | $1,000.00 | $17,133.4000 | $17,133.40 |
| 206.05 | TEST PIT EXCAVATION | 9 | EACH | $400.0000 | $3,600.00 | $5,000.0000 | $45,000.00 | $1,837.1000 | $16,533.90 |
| 209.1703 | DRAINAGE STRUCTURE INLET PROT, PREFAB TM | 30 | LF | $35.0000 | $1,050.00 | $10.0000 | $300.00 | $28.7000 | $861.00 |
| 209.23010009 | Biodegradable Sediment Filter Log 12 | 400 | LF | $11.0000 | $4,400.00 | $10.0000 | $4,000.00 | $22.2000 | $8,880.00 |
| 564.700001 | STRUCTURAL STEEL REPLACEMENT | 2 | EACH | $3,500.0000 | $7,000.00 | $250.0000 | $500.00 | $2,000.0000 | $4,000.00 |
| 606.10 | BOX BEAM GUIDE RAILING | 54 | LF | $52.0000 | $2,808.00 | $100.0000 | $5,400.00 | $65.0000 | $3,510.00 |
| 606.11 | BOX BEAM MEDIAN BARRIER | 216 | LF | $68.0000 | $14,688.00 | $100.0000 | $21,600.00 | $71.0000 | $15,336.00 |
| 606.120101 | BOX BEAM END PIECE | 1 | EACH | $820.0000 | $820.00 | $1,000.0000 | $1,000.00 | $740.0000 | $740.00 |
| 606.1402 | BX BM MED BARR END ASSEMB, TYPE B | 2 | EACH | $3,300.0000 | $6,600.00 | $2,500.0000 | $5,000.00 | $6,500.0000 | $13,000.00 |
| 606.1403 | BX BM MED BARR END ASSEMBL, TYPE C | 1 | EACH | $11,000.0000 | $11,000.00 | $7,500.0000 | $7,500.00 | $9,000.0000 | $9,000.00 |
| 606.73 | REMOVING AND DISP BOX BEAM GUIDERAILING | 7 | LF | $2.0000 | $14.00 | $20.0000 | $140.00 | $3.5000 | $24.50 |
| 606.74 | REMOVING AND DISP BOX BM MEDIAN BARRIER | 96 | LF | $4.0000 | $384.00 | $20.0000 | $1,920.00 | $4.0000 | $384.00 |
| 606.7930 | REM&DISP BX BM MED BARR END ASSEMB -TY A | 3 | EACH | $50.0000 | $150.00 | $200.0000 | $600.00 | $815.0000 | $2,445.00 |
| 617.11000024 | EQUIP CLEANING FOR INVASIVE PLANT SPECIE | 1 | LS | $500.0000 | $500.00 | $1,000.0000 | $1,000.00 | $1,750.0000 | $1,750.00 |
| 619.01 | BASIC WORK ZONE TRAFFIC CONTROL | 1 | LS | $183,127.0000 | $183,127.00 | $275,000.0000 | $275,000.00 | $507,000.0000 | $507,000.00 |
| 619.111213 | PVMS STD SIZ LC MATR LED NO EQU, CEL CM | 60 | CW | $50.0000 | $3,000.00 | $100.0000 | $6,000.00 | $785.0000 | $47,100.00 |
| 619.24 | Nighttime Operations (Entire Project) | 1 | LS | $21,000.0000 | $21,000.00 | $25,000.0000 | $25,000.00 | $190,000.0000 | $190,000.00 |
| 619.25 | TRAFFIC CONTROL SUPERVISOR | 14 | MNTH | $690.0000 | $9,660.00 | $1,000.0000 | $14,000.00 | $1,500.0000 | $21,000.00 |
| 625.01 | SURVEY OPERATIONS | 1 | LS | $45,750.0000 | $45,750.00 | $50,000.0000 | $50,000.00 | $108,000.0000 | $108,000.00 |
| 637.04 | Concrete Cylinder Curing Equipment | 1 | EACH | $2,000.0000 | $2,000.00 | $10,000.0000 | $10,000.00 | $8,000.0000 | $8,000.00 |
| 637.12 | ENGINEER'S FIELD OFFICE - TYPE 2 | 14 | MNTH | $4,000.0000 | $56,000.00 | $3,000.0000 | $42,000.00 | $3,100.0000 | $43,400.00 |
| 637.34 | OFFICE TECHNOLOGY AND SUPPLIES | 1,000 | DC | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 | $1.0000 | $1,000.00 |
| 637.36 | CONSTRUCTION TESTING SUPPLY CONSUMABLES | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 644.11 | ANCHOR BOLTS | 3,779 | LB | $10.0000 | $37,790.00 | $20.0000 | $75,580.00 | $18.0000 | $68,022.00 |
| 644.20 | DRILLED SHAFT FOR OVERHEAD SIGN STRUCTUR | 103 | CY | $4,500.0000 | $463,500.00 | $3,500.0000 | $360,500.00 | $7,495.0000 | $771,985.00 |
| 644.420810 | TRSSD ARM CTLVR SGN STRC(8Y ARM, 10Y AR) | 1 | EACH | $55,000.0000 | $55,000.00 | $95,000.0000 | $95,000.00 | $53,150.0000 | $53,150.00 |
| 644.421215 | TRSSD ARM CTLVR SGN STRC(12Y AM, 15Y AR) | 1 | EACH | $80,000.0000 | $80,000.00 | $105,000.0000 | $105,000.00 | $90,000.0000 | $90,000.00 |
| 644.421425 | TRSSD ARM CTLVR SGN STRC(14Y ARM,25Y AR) | 1 | EACH | $105,000.0000 | $105,000.00 | $135,000.0000 | $135,000.00 | $103,350.0000 | $103,350.00 |
| 644.433030 | SNGL SPN SGN STRC (30Y MX SPN, 30Y AREA) | 1 | EACH | $135,000.0000 | $135,000.00 | $155,000.0000 | $155,000.00 | $127,000.0000 | $127,000.00 |
| 644.433060 | SNGL SPN SGN STRC (30Y MX SPN, 60Y AREA) | 1 | EACH | $160,000.0000 | $160,000.00 | $175,000.0000 | $175,000.00 | $160,000.0000 | $160,000.00 |
| 644.435560 | SNGL SPN SGN STRC (55Y MX SPN, 60Y AREA) | 1 | EACH | $260,000.0000 | $260,000.00 | $295,000.0000 | $295,000.00 | $275,000.0000 | $275,000.00 |
| 644.99 | Performance Concrete Quality Adjustment | 1 | QU | $20.0000 | $20.00 | $20.0000 | $20.00 | $20.0000 | $20.00 |
| 645.5102 | GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR | 16 | SF | $30.0000 | $480.00 | $100.0000 | $1,600.00 | $88.0000 | $1,408.00 |
| 645.61 | OVERHEAD SIGN PANELS | 1,581.5 | SF | $36.0000 | $56,934.00 | $55.0000 | $86,982.50 | $60.0000 | $94,890.00 |
| 645.8106 | HIGH CAPACITY TYPE A SIGN POSTS SOIL PL | 2 | EACH | $870.0000 | $1,740.00 | $2,000.0000 | $4,000.00 | $1,850.0000 | $3,700.00 |
| 646.23 | LG DEL,LG SN P MARK,LG SUPL SN P MARK PA | 5 | EACH | $17.0000 | $85.00 | $100.0000 | $500.00 | $61.0000 | $305.00 |
| 646.32 | STEEL POST, 2.0 LB/FT | 4 | EACH | $65.0000 | $260.00 | $300.0000 | $1,200.00 | $93.0000 | $372.00 |
| 647.20 | REMOV CANTILEVER OVHD SIGN PAN STR FOUND | 2 | EACH | $11,000.0000 | $22,000.00 | $15,000.0000 | $30,000.00 | $18,500.0000 | $37,000.00 |
| 647.21 | REMOV SNG SPAN OVHD SIGN PANEL STR FOUND | 5 | EACH | $24,000.0000 | $120,000.00 | $35,000.0000 | $175,000.00 | $32,000.0000 | $160,000.00 |
| 697.03 | FIELD CHANGE PAYMENT | 95,000 | DC | $1.0000 | $95,000.00 | $1.0000 | $95,000.00 | $1.0000 | $95,000.00 |
| 698.04 | ASPHALT PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 698.05 | FUEL PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 698.06 | STEEL/IRON PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 699.040001 | MOBILIZATION | 1 | LS | $78,000.0000 | $78,000.00 | $90,240.7000 | $90,240.70 | $122,427.0000 | $122,427.00 |
Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →