NY
New York DOT · Bid Tabulation
Contract D265710
PAVEMENT RESURFACING & IMPROVEMENTS - Various Locations
- County
- Albany, Greene, Rensselaer
- Letting
- February 26, 2026
- Bidders
- 2
Apparent low bid
CALLANAN INDUSTRIES INC
$17,930,553.70
Other bidders
RIFENBURG CONSTRUCTION INC
$18,463,115.00
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | CALLANAN INDUSTRIES INC $17,930,553.70 | RIFENBURG CONSTRUCTION INC $18,463,115.00 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| 201.07010004 | CLEARING AND GRUBBING AND TREE TRIMMING | 6 | EACH | $1,800.0000 | $10,800.00 | $1,200.0000 | $7,200.00 |
| 203.02 | UNCLASSIFIED EXCAVATION AND DISPOSAL | 844 | CY | $105.0000 | $88,620.00 | $85.2500 | $71,951.00 |
| 203.03 | EMBANKMENT IN PLACE | 120 | CY | $300.0000 | $36,000.00 | $92.0000 | $11,040.00 |
| 203.07 | SELECT GRANULAR FILL | 30 | CY | $275.0000 | $8,250.00 | $50.0000 | $1,500.00 |
| 203.24010017 | SHOULDER BACKUP MATERIAL | 194 | TON | $200.0000 | $38,800.00 | $146.0000 | $28,324.00 |
| 204.01 | CONTROLLED LOW STRENGTH MATERIAL (CLSM) | 3 | CY | $1,100.0000 | $3,300.00 | $1,300.0000 | $3,900.00 |
| 206.0201 | TRENCH AND CULVERT EXCAVATION | 80 | CY | $140.0000 | $11,200.00 | $135.0000 | $10,800.00 |
| 206.03 | CONDUIT EXCAV & BACKFL INC/SURFACE RESTR | 846 | LF | $61.0000 | $51,606.00 | $67.5000 | $57,105.00 |
| 206.05 | TEST PIT EXCAVATION | 16 | EACH | $1,200.0000 | $19,200.00 | $2,050.0000 | $32,800.00 |
| 209.100101 | MULCH - TEMPORARY | 567 | SY | $4.0000 | $2,268.00 | $5.0000 | $2,835.00 |
| 209.1003 | SEED AND MULCH - TEMPORARY | 1,134 | SY | $4.0500 | $4,592.70 | $3.0000 | $3,402.00 |
| 209.13 | SILT FENCE-TEMPORARY | 100 | LF | $42.0000 | $4,200.00 | $5.5000 | $550.00 |
| 209.1703 | DRAINAGE STRUCTURE INLET PROT, PREFAB TM | 165 | LF | $24.0000 | $3,960.00 | $30.0000 | $4,950.00 |
| 209.2301 | SEDIMENT FILTER LOG-TEMPORARY,12" | 953 | LF | $16.5000 | $15,724.50 | $6.2500 | $5,956.25 |
| 210.3414 | REMOVAL DISPOSAL OF CAULKING ACM (BV14) | 1 | LS | $12,320.0000 | $12,320.00 | $12,320.0000 | $12,320.00 |
| 304.00010018 | FINE GRADING OF EXISTING SUBBASE | 548 | SF | $7.6200 | $4,175.76 | $6.0000 | $3,288.00 |
| 304.01940004 | TRAILWAY TOP COURSE, STONE DUST | 3 | CY | $1,500.0000 | $4,500.00 | $1,150.0000 | $3,450.00 |
| 304.12 | SUBBASE COURSE, TYPE 2 | 506 | CY | $150.0000 | $75,900.00 | $171.0000 | $86,526.00 |
| 404.0002 | Pavement Density Quality Adjus Asph Item | 2,665 | QU | $95.0000 | $253,175.00 | $95.0000 | $253,175.00 |
| 404.0003 | Longit Joint Density Quality Adjus Asph | 2,665 | QU | $95.0000 | $253,175.00 | $95.0000 | $253,175.00 |
| 404.0189 | T&L F9 Asph 80 Comp Ser | 89 | TON | $161.0000 | $14,329.00 | $115.0000 | $10,235.00 |
| 404.0589 | Shim Course F9, Asphalt | 8 | TON | $650.0000 | $5,200.00 | $543.0000 | $4,344.00 |
| 404.0982 | 9.5 F2 Top Cour Asph 80 Ser Comp | 935 | TON | $113.0000 | $105,655.00 | $138.0000 | $129,030.00 |
| 404.1989 | 19 F9 Binder Cour Asph 80 Ser Comp | 121 | TON | $155.0000 | $18,755.00 | $145.0000 | $17,545.00 |
| 404.3789 | 37.5 F9 Base Cour Asph 80 Ser Comp | 97 | TON | $170.0000 | $16,490.00 | $158.0000 | $15,326.00 |
| 406.0962 | 9.5 F2 Top Cou Asph Fiber 60 Ser Comp | 29,779 | TON | $103.0000 | $3,067,237.00 | $103.0000 | $3,067,237.00 |
| 406.0963 | 9.5 F3 Top Cou Asph Fiber 60 Ser Comp | 15,768 | TON | $102.0000 | $1,608,336.00 | $113.5000 | $1,789,668.00 |
| 406.1262 | 12.5 F2 Top Cou Asph Fiber 60 Ser Comp | 4,070 | TON | $95.0000 | $386,650.00 | $97.0000 | $394,790.00 |
| 406.1263 | 12.5 F3 Top Cou Asph Fiber 60 Ser Comp | 3,624 | TON | $99.0000 | $358,776.00 | $105.0000 | $380,520.00 |
| 407.0103 | STRAIGHT TACK COAT | 39,779 | GAL | $3.2500 | $129,281.75 | $3.0000 | $119,337.00 |
| 418.7603 | ASPHALT PAVEMENT JOINT ADHESIVE | 300,832 | LF | $0.4400 | $132,366.08 | $0.3500 | $105,291.20 |
| 490.15 | PROD COLD MILL SURF BITUMINOUS CONCRETE | 402,929 | SY | $2.0000 | $805,858.00 | $2.1000 | $846,150.90 |
| 490.20 | PROD COLD MILL OF PORTLAND CEMENT CONC | 25,616 | SY | $4.0000 | $102,464.00 | $3.2500 | $83,252.00 |
| 490.30 | MISC COLD MILLING OF BITUMINOUS CONCRETE | 19,792 | SY | $11.0000 | $217,712.00 | $4.7500 | $94,012.00 |
| 505.0201 | Production Diamond Grind of New PCC Pvmt | 9,858 | SY | $11.1800 | $110,212.44 | $10.0000 | $98,580.00 |
| 552.17 | SHIELDS AND SHORING | 442 | SF | $1.0000 | $442.00 | $0.1000 | $44.20 |
| 557.30 | SIDEWALKS AND SAFETY WALKS | 606 | SY | $155.0000 | $93,930.00 | $625.0000 | $378,750.00 |
| 557.9902 | Performance Concrete Quality Adjustment | 1 | QU | $4.5000 | $4.50 | $4.5000 | $4.50 |
| 576.03210011 | CLEANING SCUPPERS | 4 | EACH | $1,500.0000 | $6,000.00 | $5,500.0000 | $22,000.00 |
| 580.01 | REMOVAL OF STRUCTURAL CONCRETE | 54 | CY | $1,100.0000 | $59,400.00 | $2,025.0000 | $109,350.00 |
| 582.0051 | Removal and Replacement of Struct Conc | 3 | CY | $10,000.0000 | $30,000.00 | $17,500.0000 | $52,500.00 |
| 584.40000005 | POLY CONC OVERL WEAR SURF STRUCT SLAB | 88,715 | SF | $31.0000 | $2,750,165.00 | $25.0000 | $2,217,875.00 |
| 586.0201 | DRILL GROUT BOLTS OR REINFORMENT BARS | 156 | EACH | $115.0000 | $17,940.00 | $92.0000 | $14,352.00 |
| 601.04030011 | Methyl Methacryl Color Sur Trmt For Pvmt | 131 | SF | $19.0000 | $2,489.00 | $19.0000 | $2,489.00 |
| 603.77 | CONCRETE COLLARS | 2 | EACH | $2,000.0000 | $4,000.00 | $2,500.0000 | $5,000.00 |
| 603.9812 | SMTH INT CORR POLY CULV&STRM DRN 12 | 23 | LF | $325.4800 | $7,486.04 | $387.0000 | $8,901.00 |
| 604.070101 | ALTER DRAIN STRUC, LEACH BASINS AND MHS | 77 | EACH | $2,000.0000 | $154,000.00 | $1,500.0000 | $115,500.00 |
| 604.070102 | ALTER DRAIN STRUC, LEACH BASINS AND MHS | 17 | EACH | $2,000.0000 | $34,000.00 | $3,175.0000 | $53,975.00 |
| 604.13000011 | ABANDONING DRAINAGE STRUCTURES | 3 | EACH | $2,500.0000 | $7,500.00 | $700.0000 | $2,100.00 |
| 604.301772 | RECT DRAIN STRUC TY Q CAST IRON F2 FRM | 10 | LF | $1,000.0000 | $10,000.00 | $700.0000 | $7,000.00 |
| 604.4048 | ROUND PRECAST CONCRETE MANHOLE TYPE 48 | 10 | LF | $1,000.0000 | $10,000.00 | $738.0000 | $7,380.00 |
| 606.10 | BOX BEAM GUIDE RAILING | 1,268 | LF | $54.0000 | $68,472.00 | $54.0000 | $68,472.00 |
| 606.120201 | BOX BEAM GUIDE RAIL END ASSEMB, TYPE IIA | 11 | EACH | $2,175.0000 | $23,925.00 | $2,175.0000 | $23,925.00 |
| 606.18 | WEAK-POST, CORR BEAM GUIDE RAIL | 185 | LF | $22.7500 | $4,208.75 | $22.7500 | $4,208.75 |
| 606.2201 | ANCH UNIT CORG BEAM GUIDE RL BUR BCK SLP | 1 | EACH | $3,000.0000 | $3,000.00 | $3,000.0000 | $3,000.00 |
| 606.48 | RETENSIONING EXISTING CABLE GUIDERAILING | 1 | EACH | $150.0000 | $150.00 | $150.0000 | $150.00 |
| 606.70 | REMOVING AND DISP CABLE GUIDERAILING | 520 | LF | $2.2500 | $1,170.00 | $2.2500 | $1,170.00 |
| 606.71 | REMOVING AND DISP CORR BEAM GUIDERAILING | 668 | LF | $3.0000 | $2,004.00 | $3.0000 | $2,004.00 |
| 606.73 | REMOVING AND DISP BOX BEAM GUIDERAILING | 311 | LF | $5.0000 | $1,555.00 | $5.0000 | $1,555.00 |
| 606.79 | REM&DISP ANCHORAGE UNITS CABLE GR | 6 | EACH | $500.0000 | $3,000.00 | $500.0000 | $3,000.00 |
| 606.7910 | REM&DISP ANCHOR UNIT CORR BM GR MED BARR | 3 | EACH | $500.0000 | $1,500.00 | $500.0000 | $1,500.00 |
| 606.7920 | REM DISP BOX BM GUIDERAIL TURNDOWN TER | 2 | EACH | $140.0000 | $280.00 | $140.0000 | $280.00 |
| 607.06400016 | PEDESTRIAN FENCING FOR BRIDGES | 435 | LF | $158.0000 | $68,730.00 | $81.0000 | $35,235.00 |
| 607.41010010 | TEMPORARY PLASTIC BARRIER FENCE | 193 | LF | $23.5000 | $4,535.50 | $8.0000 | $1,544.00 |
| 608.0101 | CONCRETE SIDEWALKS AND DRIVEWAYS | 125 | CY | $1,250.0000 | $156,250.00 | $2,500.0000 | $312,500.00 |
| 608.01020005 | COLOR& IMPRNT CC SIDEWALK | 13 | CY | $2,150.0000 | $27,950.00 | $2,553.0000 | $33,189.00 |
| 608.01060415 | 4" THICK CONCRETE SIDEWALK (AWI) | 793 | SF | $57.5000 | $45,597.50 | $60.0000 | $47,580.00 |
| 608.01070415 | 4" Thick Curb Ramp and Sub Base (AWI) | 5,881 | SF | $57.5000 | $338,157.50 | $92.0000 | $541,052.00 |
| 608.21000003 | CAST IRON EMBEDDED DETECTABLE WARN UNITS | 35 | SY | $252.0000 | $8,820.00 | $405.0000 | $14,175.00 |
| 608.94010007 | IMPRNT & COLOR ASPH CONC PAVEMENT | 665 | SF | $41.0000 | $27,265.00 | $41.0000 | $27,265.00 |
| 609.0212 | Stone Curb Near Vertical Face (NVF) | 1,375 | LF | $95.0000 | $130,625.00 | $113.0000 | $155,375.00 |
| 609.0302 | STONE CURB - BRIDGE (TYPE F1) | 471 | LF | $70.0000 | $32,970.00 | $80.0000 | $37,680.00 |
| 609.04 | CAST-IN-PLACE CONCRETE CURB (AS DETAILED | 150 | LF | $190.0000 | $28,500.00 | $164.0000 | $24,600.00 |
| 609.15 | RESETTING EXISTING CURB | 12 | LF | $190.0000 | $2,280.00 | $179.0000 | $2,148.00 |
| 610.1605 | Turf Estabment Performance | 567 | SY | $25.0000 | $14,175.00 | $47.0000 | $26,649.00 |
| 610.19 | WATERING VEGETATION | 1,171 | MGAL | $1.0000 | $1,171.00 | $1.0000 | $1,171.00 |
| 611.0351 | PLANTING CONIFEROUS TREES 5 FT HIGH | 13 | EACH | $1,290.0000 | $16,770.00 | $600.0000 | $7,800.00 |
| 611.19030024 | POST PLANT CARE W REPLACE - CONIFER TREE | 13 | EACH | $710.0000 | $9,230.00 | $20.0000 | $260.00 |
| 614.060204 | TREE REMV >6" - 12" DIA BREAST HEIGHT | 13 | EACH | $1,000.0000 | $13,000.00 | $817.0000 | $10,621.00 |
| 618.70000124 | Non-Security Bollard Cover | 6 | EACH | $400.0000 | $2,400.00 | $275.0000 | $1,650.00 |
| 618.71000024 | Yellow, Retro-Reflective Tape f Bollards | 5 | SF | $200.0000 | $1,000.00 | $103.0000 | $515.00 |
| 618.73136124 | Non-Security Bollard | 6 | EACH | $2,500.0000 | $15,000.00 | $2,000.0000 | $12,000.00 |
| 619.01 | BASIC WORK ZONE TRAFFIC CONTROL | 1 | LS | $1,565,000.0000 | $1,565,000.00 | $1,600,000.0000 | $1,600,000.00 |
| 619.04 | TYPE III CONSTRUCTION BARRICADE | 191 | EACH | $50.0000 | $9,550.00 | $145.0000 | $27,695.00 |
| 619.0803 | COVER EXISTING PVMT MARK STRIPES (TAPE) | 2,185 | LF | $6.5000 | $14,202.50 | $6.5000 | $14,202.50 |
| 619.0901 | TEMP PAVE MARKING STRIPES(TRAF PAINT) | 600,512 | LF | $0.2700 | $162,138.24 | $0.2700 | $162,138.24 |
| 619.100103 | INTERIM PAVE MARKING, STRIPE(REMOV TAPE) | 5,325 | LF | $5.0000 | $26,625.00 | $5.0000 | $26,625.00 |
| 619.111113 | PVMS STD SIZ LC MATR LED NO EQU, NTCIP | 6 | EACH | $6,000.0000 | $36,000.00 | $4,230.0000 | $25,380.00 |
| 619.111213 | PVMS STD SIZ LC MATR LED NO EQU, CEL CM | 224 | CW | $550.0000 | $123,200.00 | $202.0000 | $45,248.00 |
| 619.1613 | MAINTAIN TRAF SIG EQUIP (REQUIREMENT C) | 37 | INTM | $75.0000 | $2,775.00 | $75.0000 | $2,775.00 |
| 619.20 | INTERIM TUBULAR MARKERS | 357 | EACH | $25.0000 | $8,925.00 | $30.0000 | $10,710.00 |
| 619.2401 | Nighttime Operations (Each Location) | 1 | LS | $60,000.0000 | $60,000.00 | $213,272.3700 | $213,272.37 |
| 619.2402 | Nighttime Operations (Each Location) | 1 | LS | $50,000.0000 | $50,000.00 | $75,000.0000 | $75,000.00 |
| 619.2403 | Nighttime Operations (Each Location) | 1 | LS | $25,000.0000 | $25,000.00 | $50,000.0000 | $50,000.00 |
| 619.2601 | Pavement Patching (Force Account) | 71,000 | DC | $1.0000 | $71,000.00 | $1.0000 | $71,000.00 |
| 621.03 | CLEANING CLOSED DRAINAGE SYSTEMS | 184 | LF | $25.0000 | $4,600.00 | $25.0000 | $4,600.00 |
| 621.04 | CLEANING DRAINAGE STRUCTURES | 94 | EACH | $350.0000 | $32,900.00 | $650.0000 | $61,100.00 |
| 624.0109 | CONVENT/MACHINE FORM CONC GUTTERS TY BB | 260 | SF | $75.0000 | $19,500.00 | $85.0000 | $22,100.00 |
| 625.01 | SURVEY OPERATIONS | 1 | LS | $20,000.0000 | $20,000.00 | $107,500.0000 | $107,500.00 |
| 627.50140008 | CUTTING PAVEMENT | 1,731 | LF | $4.7800 | $8,274.18 | $2.5000 | $4,327.50 |
| 633.11 | CLEANING EXISTING PAVEMENT AND/OR SHLDRS | 653 | SY | $2.0000 | $1,306.00 | $3.0000 | $1,959.00 |
| 633.1401 | Rem Repair Deteriorted Asphalt by Surfac | 791 | SY | $102.0000 | $80,682.00 | $110.0000 | $87,010.00 |
| 633.1402 | Rem Repair Deteriorted Asphalt by Surfac | 781 | SY | $82.0000 | $64,042.00 | $100.0000 | $78,100.00 |
| 633.1403 | Rem Repair Deteriorted Asphalt by Surfac | 771 | SY | $62.0000 | $47,802.00 | $93.0000 | $71,703.00 |
| 633.15 | REM & RPR OF LSE, BRKN OR SPLD PCC PVMNT | 82 | SY | $600.0000 | $49,200.00 | $120.0000 | $9,840.00 |
| 634.92000004 | PADLOCK | 6 | EACH | $50.0000 | $300.00 | $57.0000 | $342.00 |
| 635.0103 | CLEANING AND PREP OF PAVE SURFS - LINES | 10,302 | LF | $1.7900 | $18,440.58 | $1.8000 | $18,543.60 |
| 635.0203 | CLEANING AND PREP OF PAVE SURFS - LETS | 12 | EACH | $50.0000 | $600.00 | $50.0000 | $600.00 |
| 635.0303 | CLN AND PREP OF PAVE SURFS - SYMBOLS | 6 | EACH | $100.0000 | $600.00 | $100.0000 | $600.00 |
| 637.01 | FIELD LABORATORY | 1 | EACH | $7,000.0000 | $7,000.00 | $2,500.0000 | $2,500.00 |
| 637.04 | Concrete Cylinder Curing Equipment | 1 | EACH | $500.0000 | $500.00 | $2,500.0000 | $2,500.00 |
| 637.12 | ENGINEER'S FIELD OFFICE - TYPE 2 | 21 | MNTH | $3,500.0000 | $73,500.00 | $3,000.0000 | $63,000.00 |
| 637.34 | OFFICE TECHNOLOGY AND SUPPLIES | 3,000 | DC | $1.0000 | $3,000.00 | $1.0000 | $3,000.00 |
| 637.36 | CONSTRUCTION TESTING SUPPLY CONSUMABLES | 210 | DC | $1.0000 | $210.00 | $1.0000 | $210.00 |
| 645.5102 | GR-MOUNT SIGN PANELS L.E. 32 SF W Z-BAR | 984 | SF | $43.2500 | $42,558.00 | $43.2500 | $42,558.00 |
| 645.61 | OVERHEAD SIGN PANELS | 30 | SF | $76.0000 | $2,280.00 | $67.0000 | $2,010.00 |
| 645.81 | TYPE A SIGN POSTS | 133 | EACH | $225.0000 | $29,925.00 | $225.0000 | $29,925.00 |
| 645.85 | POLE MT SIGN SUPPORT SYS (BAND MT) | 12 | EACH | $375.0000 | $4,500.00 | $330.0000 | $3,960.00 |
| 646.21 | REFERENCE MARKER PANEL | 57 | EACH | $41.2500 | $2,351.25 | $41.2500 | $2,351.25 |
| 646.23 | LG DEL,LG SN P MARK,LG SUPL SN P MARK PA | 30 | EACH | $26.0000 | $780.00 | $26.0000 | $780.00 |
| 646.24 | REF MARK,DELIN,SNOWPL MARKER&PANEL RELOC | 6 | EACH | $70.2500 | $421.50 | $70.2500 | $421.50 |
| 646.32 | STEEL POST, 2.0 LB/FT | 74 | EACH | $109.5000 | $8,103.00 | $109.5000 | $8,103.00 |
| 647.25 | REMV DISPO OVHD SIGN PANEL SIGN PA ASEMB | 2 | EACH | $950.0000 | $1,900.00 | $178.0000 | $356.00 |
| 647.31 | RELOC SIGN PANEL ASEMB SZ I UNDER 30SF | 1 | EACH | $210.0000 | $210.00 | $210.0000 | $210.00 |
| 647.61 | REMV DISP GR MT TY A SUP FND SIGN SZ I | 110 | EACH | $60.0000 | $6,600.00 | $60.0000 | $6,600.00 |
| 647.83001002 | REM & DSPSL OF DELNTRS &/OR REF MARKERS | 44 | EACH | $10.0000 | $440.00 | $10.0000 | $440.00 |
| 649.01 | MILLED-IN AUDIBLE ROAD DELINEATORS (MIAR | 8,579 | LF | $0.7500 | $6,434.25 | $1.0000 | $8,579.00 |
| 649.11 | CENTERLINE AUDIBLE ROAD DELINEATRS (CARD | 31,778 | LF | $0.6000 | $19,066.80 | $1.0000 | $31,778.00 |
| 655.05170010 | REPLACEMENT OF EXISTING DRAINAGE GRATES | 4 | EACH | $1,760.0000 | $7,040.00 | $2,500.0000 | $10,000.00 |
| 655.07020010 | CAST FRM F2,W/O CURB BOX & RET GRATE G2 | 1 | EACH | $1,760.0000 | $1,760.00 | $3,200.0000 | $3,200.00 |
| 655.0705 | CAST FRAME F2,UNMT CB BOX CU2, GRATE G2 | 1 | EACH | $1,530.0000 | $1,530.00 | $2,900.0000 | $2,900.00 |
| 655.1202 | MANHOLE FRAME AND COVER | 2 | EACH | $635.0000 | $1,270.00 | $1,800.0000 | $3,600.00 |
| 656.01 | MISCELLANEOUS METALS | 1,619 | LB | $15.9200 | $25,774.48 | $14.0000 | $22,666.00 |
| 660.75000010 | PLUGGING PIPES AND CONDUITS | 8 | EACH | $625.0000 | $5,000.00 | $950.0000 | $7,600.00 |
| 662.60030008 | ALTERING ELEVATION OF GAS VALVE BOXES | 1 | EACH | $1,800.0000 | $1,800.00 | $1,900.0000 | $1,900.00 |
| 663.33 | ADJUST EXISTING VALVE BOX ELEVATION | 16 | EACH | $400.0000 | $6,400.00 | $208.0000 | $3,328.00 |
| 663.53000004 | REPLACE EXST WATER VALVE BOX TOP SECTION | 6 | EACH | $900.0000 | $5,400.00 | $900.0000 | $5,400.00 |
| 665.20000011 | FURNISH & INSTAL YELLOW PLASTIC BOLLARDS | 45 | EACH | $1,000.0000 | $45,000.00 | $1,500.0000 | $67,500.00 |
| 670.7501 | GROUND WIRE NO. 6 AWG | 996 | LF | $3.6500 | $3,635.40 | $3.6500 | $3,635.40 |
| 680.05010007 | 360 Degree Camera Video Detection System | 12 | EACH | $25,500.0000 | $306,000.00 | $25,500.0000 | $306,000.00 |
| 680.05020007 | 360 Degree Camera Assembly | 9 | EACH | $5,575.0000 | $50,175.00 | $5,575.0000 | $50,175.00 |
| 680.5001 | POLE EXCAVATION AND CONCRETE FOUNDATION | 11 | CY | $2,110.0000 | $23,210.00 | $2,110.0000 | $23,210.00 |
| 680.5002 | CONCRETE BASE FOR CONTROLLER CABINET | 1 | EACH | $1,920.0000 | $1,920.00 | $1,920.0000 | $1,920.00 |
| 680.51000010 | ALTER ELEVATION OF PULL BOXES | 2 | EACH | $960.0000 | $1,920.00 | $960.0000 | $1,920.00 |
| 680.510501 | PULLBOX-RECT, 26 X 18 INCH, REINF CONC | 3 | EACH | $1,400.0000 | $4,200.00 | $1,400.0000 | $4,200.00 |
| 680.51100010 | CLEAN EXISTING PULLBOX | 22 | EACH | $285.0000 | $6,270.00 | $285.0000 | $6,270.00 |
| 680.51200208 | REMOVE JUNCTION BOX FOR DETECTOR LOOPS | 3 | EACH | $2,100.0000 | $6,300.00 | $202.7800 | $608.34 |
| 680.520103 | CONDUIT, METAL STEEL, ZINC CTD, 1" | 40 | LF | $82.0000 | $3,280.00 | $82.0000 | $3,280.00 |
| 680.520606 | TRAF SIG CON, RIG PLAS, CLS 2, 2" | 716 | LF | $18.5000 | $13,246.00 | $18.5000 | $13,246.00 |
| 680.520608 | TRAF SIG CON, RIG PLAS, CLS 2, 3" | 97 | LF | $19.5000 | $1,891.50 | $19.5000 | $1,891.50 |
| 680.520610 | TRAF SIG CONDUIT,RIGID PLAS CL 2 4" | 112 | LF | $23.0000 | $2,576.00 | $23.0000 | $2,576.00 |
| 680.53010010 | CLEAN EXISTING CONDUIT | 1,293 | LF | $6.8500 | $8,857.05 | $6.8500 | $8,857.05 |
| 680.670802 | P.S. POLE - PST TOP MNT 8 F OV P. HT ALL | 4 | EACH | $1,625.0000 | $6,500.00 | $1,625.0000 | $6,500.00 |
| 680.6712 | T.S. POLE - POST TOP MOUNT 12 FEET M. HT | 1 | EACH | $1,840.0000 | $1,840.00 | $1,840.0000 | $1,840.00 |
| 680.6814 | T.S. POLE-BRACKET MOUNT 14 FEET M. HT | 3 | EACH | $1,795.0000 | $5,385.00 | $1,795.0000 | $5,385.00 |
| 680.6816 | T.S. POLE-BRACKET MOUNT 16 FEET M. HT | 2 | EACH | $1,840.0000 | $3,680.00 | $1,840.0000 | $3,680.00 |
| 680.7002 | DUAL SP WIRE ASSEMB WI UPPER TETHER WIRE | 2 | EACH | $3,075.0000 | $6,150.00 | $3,075.0000 | $6,150.00 |
| 680.730314 | SIGNAL CABLE 3 CONDUCTORS, 14 AWG | 220 | LF | $3.2000 | $704.00 | $3.2000 | $704.00 |
| 680.730514 | SIGNAL CABLE 5 CONDUCTORS, 14 AWG | 7,572 | LF | $4.1000 | $31,045.20 | $4.1000 | $31,045.20 |
| 680.731014 | SIGNAL CABLE 10 CONDUCTORS, 14 AWG | 1,102 | LF | $6.2000 | $6,832.40 | $6.2000 | $6,832.40 |
| 680.731914 | SIGNAL CABLE 19 CONDUCTORS, 14 AWG | 95 | LF | $12.0000 | $1,140.00 | $12.0000 | $1,140.00 |
| 680.77000505 | MODIFY TRAFFIC SIGNAL INSTALLATION | 1 | ELOC | $5,275.0000 | $5,275.00 | $5,275.0000 | $5,275.00 |
| 680.79000205 | REMOVE TRAFFIC SIGNAL INSTALLATION | 3 | ELOC | $1,125.0000 | $3,375.00 | $1,125.0000 | $3,375.00 |
| 680.79000305 | REMOVE TRAFFIC SIGNAL INSTALLATION | 1 | ELOC | $7,205.0000 | $7,205.00 | $7,205.0000 | $7,205.00 |
| 680.79000405 | REMOVE TRAFFIC SIGNAL INSTALLATION | 1 | ELOC | $1,800.0000 | $1,800.00 | $1,800.0000 | $1,800.00 |
| 680.79000505 | REMOVE TRAFFIC SIGNAL INSTALLATION | 1 | ELOC | $3,300.0000 | $3,300.00 | $3,300.0000 | $3,300.00 |
| 680.80324515 | INSTALL MICROCOMPUTER CABINET | 8 | EACH | $3,630.0000 | $29,040.00 | $3,630.0000 | $29,040.00 |
| 680.80324708 | MICROCOMPUTER CABINET BASE (ALUMINUM) | 1 | EACH | $1,305.0000 | $1,305.00 | $1,305.0000 | $1,305.00 |
| 680.810107 | TRAFFIC SIGNAL SECTION - TYPE I, 12 INCH | 40 | EACH | $205.0000 | $8,200.00 | $205.0000 | $8,200.00 |
| 680.810308 | INSTALL BALL/ARROW LED TRAF SIG MODULE | 40 | EACH | $56.0000 | $2,240.00 | $56.0000 | $2,240.00 |
| 680.8111 | TRAFFIC SIGNAL BRACKET ASSEMBLY - 1 WAY | 11 | EACH | $695.0000 | $7,645.00 | $695.0000 | $7,645.00 |
| 680.813103 | PEDESTRIAN SIG SECTION - TYPE I, 12 INCH | 20 | EACH | $277.0000 | $5,540.00 | $277.0000 | $5,540.00 |
| 680.813104 | INSTALL LED PEDESTRIAN SIGNAL MODULE | 20 | EACH | $56.0000 | $1,120.00 | $56.0000 | $1,120.00 |
| 680.8141 | PEDESTRIAN SIGNAL BRACKET MOUNT ASSEMBLY | 3 | EACH | $585.0000 | $1,755.00 | $585.0000 | $1,755.00 |
| 680.8142 | PEDESTRIAN SIG POST TOP MOUNT ASSEMBLY | 5 | EACH | $570.0000 | $2,850.00 | $570.0000 | $2,850.00 |
| 680.8151 | Acces Ped Sign w/o Post | 17 | EACH | $1,365.0000 | $23,205.00 | $1,365.0000 | $23,205.00 |
| 680.8152 | Acces Ped Sign w Post | 2 | EACH | $2,460.0000 | $4,920.00 | $2,460.0000 | $4,920.00 |
| 680.8209 | OVERHEAD SIGN ASSEMBLY, TYPE I | 9 | EACH | $705.0000 | $6,345.00 | $705.0000 | $6,345.00 |
| 680.8210 | OVERHEAD SIGN ASSEMBLY, TYPE J | 3 | EACH | $1,015.0000 | $3,045.00 | $1,015.0000 | $3,045.00 |
| 680.8220 | FLASHING BEACON SIGN ASSEMBLY | 3 | EACH | $6,735.0000 | $20,205.00 | $6,735.0000 | $20,205.00 |
| 680.8223 | Breakaway Transformer Base | 7 | EACH | $985.0000 | $6,895.00 | $985.0000 | $6,895.00 |
| 680.9499 | Inst Elect Disc/Gen Trans Sw | 2 | EACH | $500.0000 | $1,000.00 | $500.0000 | $1,000.00 |
| 680.950106 | Electrical Service Cable | 360 | LF | $3.9500 | $1,422.00 | $3.9500 | $1,422.00 |
| 680.99 | Performance Concrete Quality Adjustment | 1 | QU | $7.5000 | $7.50 | $7.5000 | $7.50 |
| 685.1102 | Wht Epoxy Reflect Pavnt Strip 20 mil | 190,674 | LF | $0.3700 | $70,549.38 | $0.3700 | $70,549.38 |
| 685.1202 | Yell Epoxy Reflect Pavnt Strip 20 mil | 179,705 | LF | $0.3700 | $66,490.85 | $0.3700 | $66,490.85 |
| 685.16010014 | White, Epoxy Paint Beads 20Mil | 11,100 | LF | $1.3900 | $15,429.00 | $1.3900 | $15,429.00 |
| 685.17010014 | Yellow, Epoxy Paint Beads 20Mil | 9,500 | LF | $1.3900 | $13,205.00 | $1.3900 | $13,205.00 |
| 685.3104 | W Epox Refl pav Spe Str 20 mil Port Hand | 67,798 | LF | $2.6900 | $182,376.62 | $2.6900 | $182,376.62 |
| 685.3204 | Y Epox Refl pav Spe Str 20 mil Port Hand | 50,600 | LF | $2.0000 | $101,200.00 | $2.0000 | $101,200.00 |
| 685.3304 | W Epox Refl pav Letters 20 mil Port Hand | 80 | EACH | $70.0000 | $5,600.00 | $70.0000 | $5,600.00 |
| 685.3404 | W Epox Refl pav Symbols 20 mil Port Hand | 204 | EACH | $200.0000 | $40,800.00 | $200.0000 | $40,800.00 |
| 686.05000011 | MUTICL PREF THERM REFLCTIZE PVMT SYMBOLS | 4 | EACH | $3,900.0000 | $15,600.00 | $3,900.0000 | $15,600.00 |
| 691.04000020 | TRAINING REQUIREMENTS | 75,600 | DC | $1.0000 | $75,600.00 | $1.0000 | $75,600.00 |
| 697.03 | FIELD CHANGE PAYMENT | 879,000 | DC | $1.0000 | $879,000.00 | $1.0000 | $879,000.00 |
| 698.04 | ASPHALT PRICE ADJUSTMENT | 92,450 | DC | $1.0000 | $92,450.00 | $1.0000 | $92,450.00 |
| 698.05 | FUEL PRICE ADJUSTMENT | 17,147 | DC | $1.0000 | $17,147.00 | $1.0000 | $17,147.00 |
| 698.06 | STEEL/IRON PRICE ADJUSTMENT | 100 | DC | $1.0000 | $100.00 | $1.0000 | $100.00 |
| 699.040001 | MOBILIZATION | 1 | LS | $675,000.0000 | $675,000.00 | $710,000.0000 | $710,000.00 |
Source: public New York DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →