VA Virginia DOT · Bid Tabulation

Contract C0000127852N01

SHOULDER WIDENING, RUMBLE STRIPS AND GUARDRAIL INSTALLATION

County
AUGUSTA
District
STAUNTON / DISTRICTWIDE OR OFFICE
Letting
April 22, 2026
Bidders
3
Apparent low bid B & S CONTRACTING, INC. $2,009,517.75
Other bidders ADAMS CONSTRUCTION COMPANY $2,555,777.72 S. L. WILLIAMSON COMPANY, INCORPORATED $2,684,672.00

Bid Items - unit price and extension by bidder

Item Description Qty UOM B & S CONTRACTING, INC. $2,009,517.75 ADAMS CONSTRUCTION COMPANY $2,555,777.72 S. L. WILLIAMSON COMPANY, INCORPORATED $2,684,672.00
Unit Price Extension Unit Price Extension Unit Price Extension
303SD20-0029 SILTATION CONTROL EXCAVATION 225 CY $1.0000 $225.00 $1.0000 $225.00 $1.0000 $225.00
303SD20-0034 TEMP. SILT FENCE TYPE A 1,500 LF $1.0000 $1,500.00 $1.0000 $1,500.00 $1.0000 $1,500.00
305SP20-0005 MACHINING SHOULDERS 3,162 LF $10.5000 $33,201.00 $11.0700 $35,003.34 $11.0000 $34,782.00
309SD20-0010 AGGR. BASE MATL. TY. I NO. 21B 6,896 TON $52.0000 $358,592.00 $52.0000 $358,592.00 $60.0000 $413,760.00
315SD20-0008 ASPHALT CONCRETE TY. SM- 9.5D CONST 3,206 TON $106.2500 $340,637.50 $142.5000 $456,855.00 $125.0000 $400,750.00
315SD20-0010 ASPHALT CONCRETE BM-25.0 (T) 5,802 TON $99.5000 $577,299.00 $151.7500 $880,453.50 $170.0000 $986,340.00
315SD20-0015 RUMBLE STRIP CYLINDRICAL ASPHALT 116,522 LF $0.2500 $29,130.50 $0.2500 $29,130.50 $0.2500 $29,130.50
505SD20-0011 GUARDRAIL GR-MGS1 2,200 LF $37.2500 $81,950.00 $38.7500 $85,250.00 $40.0000 $88,000.00
505SD20-0013 GUARDRAIL GR-MGS1, 9' POST 212.5 LF $53.0000 $11,262.50 $55.3600 $11,764.00 $60.0000 $12,750.00
505SD20-0014 RADIAL GUARDRAIL GR-MGS1 50 LF $42.5000 $2,125.00 $44.2800 $2,214.00 $50.0000 $2,500.00
505SD20-0017 GUARDRAIL TERMINAL GR- MGS2 25 EA $4,250.0000 $106,250.00 $4,428.4300 $110,710.75 $4,500.0000 $112,500.00
505SD20-0018 GUARDRAIL END ANCHORAGE GR-MGS3 2 EA $1,600.0000 $3,200.00 $1,660.6600 $3,321.32 $1,750.0000 $3,500.00
505SD20-0019 GUARDRAIL HEIGHT TRANSITION GR-MGS4 18 EA $1,600.0000 $28,800.00 $1,660.6600 $29,891.88 $1,750.0000 $31,500.00
505SD20-0027 GUARDRAIL TERMINAL GR-6 NCHRP 350 37.5 LF $212.7500 $7,978.13 $221.4200 $8,303.25 $210.0000 $7,875.00
505SD20-0030 GUARDRAIL GR-2 425 LF $37.2500 $15,831.25 $38.7500 $16,468.75 $45.0000 $19,125.00
505SD20-0038 ALT.BREAKAWAY CABLE TERM. GR-9 4 EA $4,250.0000 $17,000.00 $4,428.4300 $17,713.72 $4,500.0000 $18,000.00
505SD20-0040 GUARDRAIL GR-10 50 LF $48.0000 $2,400.00 $49.8200 $2,491.00 $55.0000 $2,750.00
505SD20-0073 REMOVE EXISTING GUARDRAIL 4,900 LF $10.5000 $51,450.00 $11.0700 $54,243.00 $15.0000 $73,500.00
505SX20-0004 NS GUARDRAIL GUARDRAIL END TERMINAL SITE PREPARATION, 4’ MODERATE 29 EA $800.0000 $23,200.00 $830.3300 $24,079.57 $1,000.0000 $29,000.00
512SD20-0023 TRUCK MOUNTED ATTENUATOR 200 HR $15.0000 $3,000.00 $2.5000 $500.00 $10.0000 $2,000.00
512SD20-0024 GROUP 2 CHANNELIZING DEVICES 100 DAY $1.0000 $100.00 $1.0000 $100.00 $25.0000 $2,500.00
512SD20-0025 PORT.CHANGEABLE MESS. SIGN 2,000 HR $5.0000 $10,000.00 $7.5000 $15,000.00 $10.0000 $20,000.00
512SD20-0026 ELECTRONIC ARROW BOARD 200 HR $5.0000 $1,000.00 $0.0100 $2.00 $5.0000 $1,000.00
512SD20-0027 FLAGGER SERVICE 1,200 HR $54.0000 $64,800.00 $47.5000 $57,000.00 $40.0000 $48,000.00
512SD20-0047 TEMP. PVMT MRKG TY. A, 6" 140,343 LF $0.0500 $7,017.15 $0.2400 $33,682.32 $0.2000 $28,068.60
512SP20-0001 PORTABLE TEMPORARY RUMBLE STRIP ARRAY 100 DAY $1.0000 $100.00 $2.5000 $250.00 $1.0000 $100.00
513SD20-0001 MOBILIZATION 1 LS $91,459.0000 $91,459.00 $90,094.2100 $90,094.21 $164,000.5000 $164,000.50
515SD20-0013 FLEXIBLE PAVE.PLANING 0"-2" 12,947 SY $2.2500 $29,130.75 $8.6700 $112,250.49 $3.0000 $38,841.00
521SD20-0001 MAILBOX POST, SINGLE 8 EA $1.0000 $8.00 $100.0000 $800.00 $50.0000 $400.00
704SD20-0007 TYPE B CLASS I PVMT LINE MRKG 6" 140,343 LF $0.7900 $110,870.97 $0.8400 $117,888.12 $0.8000 $112,274.40

Source: public Virginia DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.