Wisconsin DOT · Bid Tabulation
Contract 20260414002
Oconomowoc - Mayville; Waukesha Co Line To Cth Mm
- County
- Dodge
- Letting
- April 14, 2026
- Bidders
- 3
Apparent low bid
PAYNE AND DOLAN, INC
$2,548,394.00
Other bidders
ROCK ROAD COMPANIES, INC.
$2,747,786.74
STARK PAVEMENT CORPORATION
$2,831,881.70
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | PAYNE AND DOLAN, INC $2,548,394.00 | ROCK ROAD COMPANIES, INC. $2,747,786.74 | STARK PAVEMENT CORPORATION $2,831,881.70 | |||
|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 203.0100 | Removing Small Pipe Culverts | 3 | EACH | $310.0000 | $930.00 | $746.7600 | $2,240.28 | $750.0000 | $2,250.00 |
| 204.0100 | Removing Concrete Pavement | 393 | SY | $10.3500 | $4,067.55 | $9.3900 | $3,690.27 | $10.7500 | $4,224.75 |
| 204.0110 | Removing Asphaltic Surface | 55 | SY | $12.0000 | $660.00 | $12.0000 | $660.00 | $18.2500 | $1,003.75 |
| 204.0115 | Removing Asphaltic Surface Butt Joints | 583 | SY | $5.4500 | $3,177.35 | $4.8900 | $2,850.87 | $8.7000 | $5,072.10 |
| 204.0120 | Removing Asphaltic Surface Milling | 101,300 | SY | $2.3500 | $238,055.00 | $1.0000 | $101,300.00 | $3.0000 | $303,900.00 |
| 204.0150 | Removing Curb & Gutter | 174 | LF | $8.0000 | $1,392.00 | $8.0000 | $1,392.00 | $9.0000 | $1,566.00 |
| 204.0155 | Removing Concrete Sidewalk | 142 | SY | $24.0000 | $3,408.00 | $24.0000 | $3,408.00 | $14.0000 | $1,988.00 |
| 204.0165 | Removing Guardrail | 320 | LF | $5.0000 | $1,600.00 | $5.0000 | $1,600.00 | $5.0000 | $1,600.00 |
| 204.0180 | Removing Delineators and Markers | 6 | EACH | $25.0000 | $150.00 | $25.0000 | $150.00 | $25.0000 | $150.00 |
| 205.0100 | Excavation Common | 1,116 | CY | $21.4000 | $23,882.40 | $16.6800 | $18,614.88 | $35.0000 | $39,060.00 |
| 211.0101 | Prepare Foundation for Asphaltic Paving (project) 01. 3030-05-74 | 1 | EACH | $5,165.0000 | $5,165.00 | $0.0100 | $0.01 | $3,300.0000 | $3,300.00 |
| 211.0400 | Prepare Foundation for Asphaltic Shoulders | 8 | STA | $155.0000 | $1,240.00 | $360.5800 | $2,884.64 | $340.0000 | $2,720.00 |
| 213.0100 | Finishing Roadway (project) 01. 3030-05-74 | 1 | EACH | $2,600.0000 | $2,600.00 | $4,634.5800 | $4,634.58 | $1,750.0000 | $1,750.00 |
| 305.0110 | Base Aggregate Dense 3/4-Inch | 2,760 | TON | $24.0000 | $66,240.00 | $30.0600 | $82,965.60 | $27.0000 | $74,520.00 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 550 | TON | $31.4000 | $17,270.00 | $22.8400 | $12,562.00 | $22.0000 | $12,100.00 |
| 305.0130 | Base Aggregate Dense 3-Inch | 680 | TON | $31.1500 | $21,182.00 | $27.9700 | $19,019.60 | $26.0000 | $17,680.00 |
| 416.0610 | Drilled Tie Bars | 60 | EACH | $10.0000 | $600.00 | $10.0000 | $600.00 | $10.0000 | $600.00 |
| 455.0605 | Tack Coat | 12,970 | GAL | $2.3000 | $29,831.00 | $3.5000 | $45,395.00 | $3.0000 | $38,910.00 |
| 460.0105.S | HMA Percent Within Limits (PWL) Test Strip Volumetrics | 1 | EACH | $1,300.0000 | $1,300.00 | $3,500.0000 | $3,500.00 | $3,500.0000 | $3,500.00 |
| 460.0110.S | HMA Percent Within Limits (PWL) Test Strip Density | 2 | EACH | $8,000.0000 | $16,000.00 | $3,500.0000 | $7,000.00 | $3,500.0000 | $7,000.00 |
| 460.2005 | Incentive Density PWL HMA Pavement | 14,130 | DOL | $1.0000 | $14,130.00 | $1.0000 | $14,130.00 | $1.0000 | $14,130.00 |
| 460.2007 | Incentive Density HMA Pavement Longitudinal Joints | 5,410 | DOL | $1.0000 | $5,410.00 | $1.0000 | $5,410.00 | $1.0000 | $5,410.00 |
| 460.2010 | Incentive Air Voids HMA Pavement | 21,220 | DOL | $1.0000 | $21,220.00 | $1.0000 | $21,220.00 | $1.0000 | $21,220.00 |
| 460.6224 | HMA Pavement 4 MT 58-28 S | 10,670 | TON | $66.3500 | $707,954.50 | $83.0100 | $885,716.70 | $76.0000 | $810,920.00 |
| 460.6424 | HMA Pavement 4 MT 58-28 H | 10,540 | TON | $71.3000 | $751,502.00 | $87.6800 | $924,147.20 | $78.3000 | $825,282.00 |
| 465.0105 | Asphaltic Surface | 800 | TON | $111.7500 | $89,400.00 | $91.0000 | $72,800.00 | $95.5000 | $76,400.00 |
| 465.0120 | Asphaltic Surface Driveways and Field Entrances | 77 | TON | $77.0000 | $5,929.00 | $198.2000 | $15,261.40 | $132.0000 | $10,164.00 |
| 522.0424 | Culvert Pipe Reinforced Concrete Class IV 24-Inch | 104 | LF | $127.8500 | $13,296.40 | $227.5900 | $23,669.36 | $275.0000 | $28,600.00 |
| 522.1024 | Apron Endwalls for Culvert Pipe Reinforced Concrete 24-Inch | 4 | EACH | $1,300.0000 | $5,200.00 | $1,430.0600 | $5,720.24 | $1,850.0000 | $7,400.00 |
| 522.2429 | Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 29x45-Inch | 86 | LF | $309.6000 | $26,625.60 | $306.6300 | $26,370.18 | $325.0000 | $27,950.00 |
| 522.2629 | Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptical 29x45-Inch | 2 | EACH | $2,440.0000 | $4,880.00 | $2,484.0000 | $4,968.00 | $3,000.0000 | $6,000.00 |
| 601.0411 | Concrete Curb & Gutter 30-Inch Type D | 176 | LF | $51.5000 | $9,064.00 | $51.5000 | $9,064.00 | $51.5000 | $9,064.00 |
| 601.0600 | Concrete Curb Pedestrian | 22 | LF | $40.0000 | $880.00 | $40.0000 | $880.00 | $40.0000 | $880.00 |
| 602.0410 | Concrete Sidewalk 5-Inch | 1,410 | SF | $10.5000 | $14,805.00 | $10.5000 | $14,805.00 | $10.5000 | $14,805.00 |
| 602.0515 | Curb Ramp Detectable Warning Field Natural Patina | 60 | SF | $40.0000 | $2,400.00 | $40.0000 | $2,400.00 | $40.0000 | $2,400.00 |
| 611.8115 | Adjusting Inlet Covers | 2 | EACH | $600.0000 | $1,200.00 | $640.3400 | $1,280.68 | $1,350.0000 | $2,700.00 |
| 614.0010 | Barrier System Grading Shaping Finishing | 2 | EACH | $4,180.0000 | $8,360.00 | $3,292.9200 | $6,585.84 | $14,200.0000 | $28,400.00 |
| 614.0305 | Steel Plate Beam Guard Class A | 350 | LF | $31.0000 | $10,850.00 | $31.0000 | $10,850.00 | $31.0000 | $10,850.00 |
| 614.0370 | Steel Plate Beam Guard Energy Absorbing Terminal | 4 | EACH | $4,000.0000 | $16,000.00 | $4,000.0000 | $16,000.00 | $4,000.0000 | $16,000.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 01. 3030-05-74 | 1 | EACH | $350.0000 | $350.00 | $0.0100 | $0.01 | $960.0000 | $960.00 |
| 619.1000 | Mobilization | 1 | EACH | $85,664.1100 | $85,664.11 | $92,939.3700 | $92,939.37 | $86,000.0000 | $86,000.00 |
| 624.0100 | Water | 56 | MGAL | $45.0000 | $2,520.00 | $0.0100 | $0.56 | $50.0000 | $2,800.00 |
| 625.0500 | Salvaged Topsoil | 690 | SY | $1.6000 | $1,104.00 | $0.0100 | $6.90 | $9.0000 | $6,210.00 |
| 628.1504 | Silt Fence | 1,130 | LF | $2.5000 | $2,825.00 | $2.5000 | $2,825.00 | $2.5000 | $2,825.00 |
| 628.1520 | Silt Fence Maintenance | 1,130 | LF | $0.0100 | $11.30 | $0.0100 | $11.30 | $0.0100 | $11.30 |
| 628.1905 | Mobilizations Erosion Control | 3 | EACH | $100.0000 | $300.00 | $100.0000 | $300.00 | $100.0000 | $300.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 2 | EACH | $100.0000 | $200.00 | $100.0000 | $200.00 | $100.0000 | $200.00 |
| 628.2008 | Erosion Mat Urban Class I Type B | 690 | SY | $2.2500 | $1,552.50 | $2.2500 | $1,552.50 | $2.2500 | $1,552.50 |
| 628.7015 | Inlet Protection Type C | 33 | EACH | $65.0000 | $2,145.00 | $65.0000 | $2,145.00 | $65.0000 | $2,145.00 |
| 628.7504 | Temporary Ditch Checks | 45 | LF | $12.0000 | $540.00 | $12.0000 | $540.00 | $12.0000 | $540.00 |
| 628.7555 | Culvert Pipe Checks | 16 | EACH | $20.0000 | $320.00 | $20.0000 | $320.00 | $20.0000 | $320.00 |
| 628.7570 | Rock Bags | 150 | EACH | $20.0000 | $3,000.00 | $20.0000 | $3,000.00 | $20.0000 | $3,000.00 |
| 629.0210 | Fertilizer Type B | 0.3 | CWT | $150.0000 | $45.00 | $150.0000 | $45.00 | $150.0000 | $45.00 |
| 630.0130 | Seeding Mixture No. 30 | 31 | LB | $15.0000 | $465.00 | $15.0000 | $465.00 | $15.0000 | $465.00 |
| 630.0500 | Seed Water | 15 | MGAL | $20.0000 | $300.00 | $20.0000 | $300.00 | $20.0000 | $300.00 |
| 633.5200 | Markers Culvert End | 6 | EACH | $75.0000 | $450.00 | $75.0000 | $450.00 | $75.0000 | $450.00 |
| 634.0614 | Posts Wood 4x6-Inch X 14-FT | 4 | EACH | $90.0000 | $360.00 | $90.0000 | $360.00 | $90.0000 | $360.00 |
| 634.0616 | Posts Wood 4x6-Inch X 16-FT | 1 | EACH | $98.0000 | $98.00 | $98.0000 | $98.00 | $98.0000 | $98.00 |
| 638.2102 | Moving Signs Type II | 6 | EACH | $150.0000 | $900.00 | $150.0000 | $900.00 | $150.0000 | $900.00 |
| 638.3000 | Removing Small Sign Supports | 5 | EACH | $40.0000 | $200.00 | $40.0000 | $200.00 | $40.0000 | $200.00 |
| 638.4000 | Moving Small Sign Supports | 1 | EACH | $150.0000 | $150.00 | $150.0000 | $150.00 | $150.0000 | $150.00 |
| 642.5001 | Field Office Type B | 1 | EACH | $8,275.0000 | $8,275.00 | $5,400.0000 | $5,400.00 | $7,500.0000 | $7,500.00 |
| 643.0300 | Traffic Control Drums | 2,208 | DAY | $0.2500 | $552.00 | $0.2500 | $552.00 | $0.2000 | $441.60 |
| 643.0420 | Traffic Control Barricades Type III | 2,934 | DAY | $1.0000 | $2,934.00 | $1.0000 | $2,934.00 | $0.6000 | $1,760.40 |
| 643.0705 | Traffic Control Warning Lights Type A | 5,844 | DAY | $0.1100 | $642.84 | $0.1100 | $642.84 | $0.1000 | $584.40 |
| 643.0900 | Traffic Control Signs | 20,258 | DAY | $0.5000 | $10,129.00 | $0.5000 | $10,129.00 | $0.4000 | $8,103.20 |
| 643.0910 | Traffic Control Covering Signs Type I | 4 | EACH | $200.0000 | $800.00 | $200.0000 | $800.00 | $200.0000 | $800.00 |
| 643.0920 | Traffic Control Covering Signs Type II | 9 | EACH | $40.0000 | $360.00 | $40.0000 | $360.00 | $40.0000 | $360.00 |
| 643.1050 | Traffic Control Signs PCMS | 14 | DAY | $60.0000 | $840.00 | $60.0000 | $840.00 | $75.0000 | $1,050.00 |
| 643.3165 | Temporary Marking Line Paint 6-Inch | 78,900 | LF | $0.4900 | $38,661.00 | $0.4500 | $35,505.00 | $0.5000 | $39,450.00 |
| 643.3305 | Temporary Marking Crosswalk Paint 6-inch | 200 | LF | $10.0000 | $2,000.00 | $8.0000 | $1,600.00 | $10.0000 | $2,000.00 |
| 643.5000 | Traffic Control | 1 | EACH | $29,000.0000 | $29,000.00 | $29,000.0000 | $29,000.00 | $27,250.0000 | $27,250.00 |
| 644.1601 | Temporary Pedestrian Curb Ramp | 38 | DAY | $15.0000 | $570.00 | $15.0000 | $570.00 | $20.0000 | $760.00 |
| 644.1605 | Temporary Pedestrian Detectable Warning Field | 40 | SF | $18.0000 | $720.00 | $18.0000 | $720.00 | $20.0000 | $800.00 |
| 644.1810 | Temporary Pedestrian Barricade | 246 | LF | $6.0000 | $1,476.00 | $6.0000 | $1,476.00 | $5.0000 | $1,230.00 |
| 645.0220 | Geogrid Type SR | 786 | SY | $12.0000 | $9,432.00 | $1.7500 | $1,375.50 | $1.8000 | $1,414.80 |
| 646.1020 | Marking Line Epoxy 4-Inch | 337 | LF | $0.5000 | $168.50 | $0.5000 | $168.50 | $0.5000 | $168.50 |
| 646.2040 | Marking Line Grooved Wet Ref Epoxy 6-Inch | 74,290 | LF | $1.0500 | $78,004.50 | $1.0500 | $78,004.50 | $1.0500 | $78,004.50 |
| 646.4040 | Marking Line Grooved Wet Ref Epoxy 10-Inch | 1,410 | LF | $2.0000 | $2,820.00 | $2.0000 | $2,820.00 | $2.0000 | $2,820.00 |
| 646.5320 | Marking Railroad Crossing Epoxy | 2 | EACH | $1,600.0000 | $3,200.00 | $1,600.0000 | $3,200.00 | $1,600.0000 | $3,200.00 |
| 646.6120 | Marking Stop Line Epoxy 18-Inch | 37 | LF | $27.0000 | $999.00 | $27.0000 | $999.00 | $27.0000 | $999.00 |
| 646.7420 | Marking Crosswalk Epoxy Transverse Line 6-Inch | 344 | LF | $11.0000 | $3,784.00 | $11.0000 | $3,784.00 | $11.0000 | $3,784.00 |
| 650.5500 | Construction Staking Curb Gutter and Curb & Gutter | 176 | LF | $2.5000 | $440.00 | $0.0100 | $1.76 | $2.5000 | $440.00 |
| 650.6000 | Construction Staking Pipe Culverts | 3 | EACH | $300.0000 | $900.00 | $15.0000 | $45.00 | $300.0000 | $900.00 |
| 650.8000 | Construction Staking Resurfacing Reference | 27,033 | LF | $0.1900 | $5,136.27 | $0.0500 | $1,351.65 | $0.2000 | $5,406.60 |
| 650.9000 | Construction Staking Curb Ramps | 6 | EACH | $300.0000 | $1,800.00 | $100.0000 | $600.00 | $300.0000 | $1,800.00 |
| 650.9500 | Construction Staking Sidewalk (project) 01. 3030-05-74 | 1 | EACH | $400.0000 | $400.00 | $4,000.0000 | $4,000.00 | $400.0000 | $400.00 |
| 650.9911 | Construction Staking Supplemental Control (project) 01. 3030-05-74 | 1 | EACH | $600.0000 | $600.00 | $4,000.0000 | $4,000.00 | $600.0000 | $600.00 |
| 690.0150 | Sawing Asphalt | 434 | LF | $1.2000 | $520.80 | $1.6900 | $733.46 | $1.2000 | $520.80 |
| 690.0250 | Sawing Concrete | 240 | LF | $2.2000 | $528.00 | $2.2500 | $540.00 | $2.2000 | $528.00 |
| 740.0440 | Incentive IRI Ride | 20,480 | DOL | $1.0000 | $20,480.00 | $1.0000 | $20,480.00 | $1.0000 | $20,480.00 |
| SPV.0035 | Special 01. Foundation Backfill | 538 | CY | $54.2600 | $29,191.88 | $26.5200 | $14,267.76 | $28.0000 | $15,064.00 |
| SPV.0060 | Special 03. Adjusting Sanitary Manhole Covers | 12 | EACH | $1,293.3333 | $14,590.00 | $819.5333 | $9,600.80 | $1,416.6667 | $16,400.00 |
| SPV.0180 | Special 01. Removing Distressed Pavement Milling | 4,710 | SY | $5.7500 | $27,082.50 | $6.1000 | $28,731.00 | $7.5500 | $35,560.50 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.