WI Wisconsin DOT · Bid Tabulation

Contract 20260414002

Oconomowoc - Mayville; Waukesha Co Line To Cth Mm

County
Dodge
Letting
April 14, 2026
Bidders
3
Apparent low bid PAYNE AND DOLAN, INC $2,548,394.00
Other bidders ROCK ROAD COMPANIES, INC. $2,747,786.74 STARK PAVEMENT CORPORATION $2,831,881.70

Bid Items - unit price and extension by bidder

Item Description Qty UOM PAYNE AND DOLAN, INC $2,548,394.00 ROCK ROAD COMPANIES, INC. $2,747,786.74 STARK PAVEMENT CORPORATION $2,831,881.70
Unit Price Extension Unit Price Extension Unit Price Extension
203.0100 Removing Small Pipe Culverts 3 EACH $310.0000 $930.00 $746.7600 $2,240.28 $750.0000 $2,250.00
204.0100 Removing Concrete Pavement 393 SY $10.3500 $4,067.55 $9.3900 $3,690.27 $10.7500 $4,224.75
204.0110 Removing Asphaltic Surface 55 SY $12.0000 $660.00 $12.0000 $660.00 $18.2500 $1,003.75
204.0115 Removing Asphaltic Surface Butt Joints 583 SY $5.4500 $3,177.35 $4.8900 $2,850.87 $8.7000 $5,072.10
204.0120 Removing Asphaltic Surface Milling 101,300 SY $2.3500 $238,055.00 $1.0000 $101,300.00 $3.0000 $303,900.00
204.0150 Removing Curb & Gutter 174 LF $8.0000 $1,392.00 $8.0000 $1,392.00 $9.0000 $1,566.00
204.0155 Removing Concrete Sidewalk 142 SY $24.0000 $3,408.00 $24.0000 $3,408.00 $14.0000 $1,988.00
204.0165 Removing Guardrail 320 LF $5.0000 $1,600.00 $5.0000 $1,600.00 $5.0000 $1,600.00
204.0180 Removing Delineators and Markers 6 EACH $25.0000 $150.00 $25.0000 $150.00 $25.0000 $150.00
205.0100 Excavation Common 1,116 CY $21.4000 $23,882.40 $16.6800 $18,614.88 $35.0000 $39,060.00
211.0101 Prepare Foundation for Asphaltic Paving (project) 01. 3030-05-74 1 EACH $5,165.0000 $5,165.00 $0.0100 $0.01 $3,300.0000 $3,300.00
211.0400 Prepare Foundation for Asphaltic Shoulders 8 STA $155.0000 $1,240.00 $360.5800 $2,884.64 $340.0000 $2,720.00
213.0100 Finishing Roadway (project) 01. 3030-05-74 1 EACH $2,600.0000 $2,600.00 $4,634.5800 $4,634.58 $1,750.0000 $1,750.00
305.0110 Base Aggregate Dense 3/4-Inch 2,760 TON $24.0000 $66,240.00 $30.0600 $82,965.60 $27.0000 $74,520.00
305.0120 Base Aggregate Dense 1 1/4-Inch 550 TON $31.4000 $17,270.00 $22.8400 $12,562.00 $22.0000 $12,100.00
305.0130 Base Aggregate Dense 3-Inch 680 TON $31.1500 $21,182.00 $27.9700 $19,019.60 $26.0000 $17,680.00
416.0610 Drilled Tie Bars 60 EACH $10.0000 $600.00 $10.0000 $600.00 $10.0000 $600.00
455.0605 Tack Coat 12,970 GAL $2.3000 $29,831.00 $3.5000 $45,395.00 $3.0000 $38,910.00
460.0105.S HMA Percent Within Limits (PWL) Test Strip Volumetrics 1 EACH $1,300.0000 $1,300.00 $3,500.0000 $3,500.00 $3,500.0000 $3,500.00
460.0110.S HMA Percent Within Limits (PWL) Test Strip Density 2 EACH $8,000.0000 $16,000.00 $3,500.0000 $7,000.00 $3,500.0000 $7,000.00
460.2005 Incentive Density PWL HMA Pavement 14,130 DOL $1.0000 $14,130.00 $1.0000 $14,130.00 $1.0000 $14,130.00
460.2007 Incentive Density HMA Pavement Longitudinal Joints 5,410 DOL $1.0000 $5,410.00 $1.0000 $5,410.00 $1.0000 $5,410.00
460.2010 Incentive Air Voids HMA Pavement 21,220 DOL $1.0000 $21,220.00 $1.0000 $21,220.00 $1.0000 $21,220.00
460.6224 HMA Pavement 4 MT 58-28 S 10,670 TON $66.3500 $707,954.50 $83.0100 $885,716.70 $76.0000 $810,920.00
460.6424 HMA Pavement 4 MT 58-28 H 10,540 TON $71.3000 $751,502.00 $87.6800 $924,147.20 $78.3000 $825,282.00
465.0105 Asphaltic Surface 800 TON $111.7500 $89,400.00 $91.0000 $72,800.00 $95.5000 $76,400.00
465.0120 Asphaltic Surface Driveways and Field Entrances 77 TON $77.0000 $5,929.00 $198.2000 $15,261.40 $132.0000 $10,164.00
522.0424 Culvert Pipe Reinforced Concrete Class IV 24-Inch 104 LF $127.8500 $13,296.40 $227.5900 $23,669.36 $275.0000 $28,600.00
522.1024 Apron Endwalls for Culvert Pipe Reinforced Concrete 24-Inch 4 EACH $1,300.0000 $5,200.00 $1,430.0600 $5,720.24 $1,850.0000 $7,400.00
522.2429 Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 29x45-Inch 86 LF $309.6000 $26,625.60 $306.6300 $26,370.18 $325.0000 $27,950.00
522.2629 Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptical 29x45-Inch 2 EACH $2,440.0000 $4,880.00 $2,484.0000 $4,968.00 $3,000.0000 $6,000.00
601.0411 Concrete Curb & Gutter 30-Inch Type D 176 LF $51.5000 $9,064.00 $51.5000 $9,064.00 $51.5000 $9,064.00
601.0600 Concrete Curb Pedestrian 22 LF $40.0000 $880.00 $40.0000 $880.00 $40.0000 $880.00
602.0410 Concrete Sidewalk 5-Inch 1,410 SF $10.5000 $14,805.00 $10.5000 $14,805.00 $10.5000 $14,805.00
602.0515 Curb Ramp Detectable Warning Field Natural Patina 60 SF $40.0000 $2,400.00 $40.0000 $2,400.00 $40.0000 $2,400.00
611.8115 Adjusting Inlet Covers 2 EACH $600.0000 $1,200.00 $640.3400 $1,280.68 $1,350.0000 $2,700.00
614.0010 Barrier System Grading Shaping Finishing 2 EACH $4,180.0000 $8,360.00 $3,292.9200 $6,585.84 $14,200.0000 $28,400.00
614.0305 Steel Plate Beam Guard Class A 350 LF $31.0000 $10,850.00 $31.0000 $10,850.00 $31.0000 $10,850.00
614.0370 Steel Plate Beam Guard Energy Absorbing Terminal 4 EACH $4,000.0000 $16,000.00 $4,000.0000 $16,000.00 $4,000.0000 $16,000.00
618.0100 Maintenance and Repair of Haul Roads (project) 01. 3030-05-74 1 EACH $350.0000 $350.00 $0.0100 $0.01 $960.0000 $960.00
619.1000 Mobilization 1 EACH $85,664.1100 $85,664.11 $92,939.3700 $92,939.37 $86,000.0000 $86,000.00
624.0100 Water 56 MGAL $45.0000 $2,520.00 $0.0100 $0.56 $50.0000 $2,800.00
625.0500 Salvaged Topsoil 690 SY $1.6000 $1,104.00 $0.0100 $6.90 $9.0000 $6,210.00
628.1504 Silt Fence 1,130 LF $2.5000 $2,825.00 $2.5000 $2,825.00 $2.5000 $2,825.00
628.1520 Silt Fence Maintenance 1,130 LF $0.0100 $11.30 $0.0100 $11.30 $0.0100 $11.30
628.1905 Mobilizations Erosion Control 3 EACH $100.0000 $300.00 $100.0000 $300.00 $100.0000 $300.00
628.1910 Mobilizations Emergency Erosion Control 2 EACH $100.0000 $200.00 $100.0000 $200.00 $100.0000 $200.00
628.2008 Erosion Mat Urban Class I Type B 690 SY $2.2500 $1,552.50 $2.2500 $1,552.50 $2.2500 $1,552.50
628.7015 Inlet Protection Type C 33 EACH $65.0000 $2,145.00 $65.0000 $2,145.00 $65.0000 $2,145.00
628.7504 Temporary Ditch Checks 45 LF $12.0000 $540.00 $12.0000 $540.00 $12.0000 $540.00
628.7555 Culvert Pipe Checks 16 EACH $20.0000 $320.00 $20.0000 $320.00 $20.0000 $320.00
628.7570 Rock Bags 150 EACH $20.0000 $3,000.00 $20.0000 $3,000.00 $20.0000 $3,000.00
629.0210 Fertilizer Type B 0.3 CWT $150.0000 $45.00 $150.0000 $45.00 $150.0000 $45.00
630.0130 Seeding Mixture No. 30 31 LB $15.0000 $465.00 $15.0000 $465.00 $15.0000 $465.00
630.0500 Seed Water 15 MGAL $20.0000 $300.00 $20.0000 $300.00 $20.0000 $300.00
633.5200 Markers Culvert End 6 EACH $75.0000 $450.00 $75.0000 $450.00 $75.0000 $450.00
634.0614 Posts Wood 4x6-Inch X 14-FT 4 EACH $90.0000 $360.00 $90.0000 $360.00 $90.0000 $360.00
634.0616 Posts Wood 4x6-Inch X 16-FT 1 EACH $98.0000 $98.00 $98.0000 $98.00 $98.0000 $98.00
638.2102 Moving Signs Type II 6 EACH $150.0000 $900.00 $150.0000 $900.00 $150.0000 $900.00
638.3000 Removing Small Sign Supports 5 EACH $40.0000 $200.00 $40.0000 $200.00 $40.0000 $200.00
638.4000 Moving Small Sign Supports 1 EACH $150.0000 $150.00 $150.0000 $150.00 $150.0000 $150.00
642.5001 Field Office Type B 1 EACH $8,275.0000 $8,275.00 $5,400.0000 $5,400.00 $7,500.0000 $7,500.00
643.0300 Traffic Control Drums 2,208 DAY $0.2500 $552.00 $0.2500 $552.00 $0.2000 $441.60
643.0420 Traffic Control Barricades Type III 2,934 DAY $1.0000 $2,934.00 $1.0000 $2,934.00 $0.6000 $1,760.40
643.0705 Traffic Control Warning Lights Type A 5,844 DAY $0.1100 $642.84 $0.1100 $642.84 $0.1000 $584.40
643.0900 Traffic Control Signs 20,258 DAY $0.5000 $10,129.00 $0.5000 $10,129.00 $0.4000 $8,103.20
643.0910 Traffic Control Covering Signs Type I 4 EACH $200.0000 $800.00 $200.0000 $800.00 $200.0000 $800.00
643.0920 Traffic Control Covering Signs Type II 9 EACH $40.0000 $360.00 $40.0000 $360.00 $40.0000 $360.00
643.1050 Traffic Control Signs PCMS 14 DAY $60.0000 $840.00 $60.0000 $840.00 $75.0000 $1,050.00
643.3165 Temporary Marking Line Paint 6-Inch 78,900 LF $0.4900 $38,661.00 $0.4500 $35,505.00 $0.5000 $39,450.00
643.3305 Temporary Marking Crosswalk Paint 6-inch 200 LF $10.0000 $2,000.00 $8.0000 $1,600.00 $10.0000 $2,000.00
643.5000 Traffic Control 1 EACH $29,000.0000 $29,000.00 $29,000.0000 $29,000.00 $27,250.0000 $27,250.00
644.1601 Temporary Pedestrian Curb Ramp 38 DAY $15.0000 $570.00 $15.0000 $570.00 $20.0000 $760.00
644.1605 Temporary Pedestrian Detectable Warning Field 40 SF $18.0000 $720.00 $18.0000 $720.00 $20.0000 $800.00
644.1810 Temporary Pedestrian Barricade 246 LF $6.0000 $1,476.00 $6.0000 $1,476.00 $5.0000 $1,230.00
645.0220 Geogrid Type SR 786 SY $12.0000 $9,432.00 $1.7500 $1,375.50 $1.8000 $1,414.80
646.1020 Marking Line Epoxy 4-Inch 337 LF $0.5000 $168.50 $0.5000 $168.50 $0.5000 $168.50
646.2040 Marking Line Grooved Wet Ref Epoxy 6-Inch 74,290 LF $1.0500 $78,004.50 $1.0500 $78,004.50 $1.0500 $78,004.50
646.4040 Marking Line Grooved Wet Ref Epoxy 10-Inch 1,410 LF $2.0000 $2,820.00 $2.0000 $2,820.00 $2.0000 $2,820.00
646.5320 Marking Railroad Crossing Epoxy 2 EACH $1,600.0000 $3,200.00 $1,600.0000 $3,200.00 $1,600.0000 $3,200.00
646.6120 Marking Stop Line Epoxy 18-Inch 37 LF $27.0000 $999.00 $27.0000 $999.00 $27.0000 $999.00
646.7420 Marking Crosswalk Epoxy Transverse Line 6-Inch 344 LF $11.0000 $3,784.00 $11.0000 $3,784.00 $11.0000 $3,784.00
650.5500 Construction Staking Curb Gutter and Curb & Gutter 176 LF $2.5000 $440.00 $0.0100 $1.76 $2.5000 $440.00
650.6000 Construction Staking Pipe Culverts 3 EACH $300.0000 $900.00 $15.0000 $45.00 $300.0000 $900.00
650.8000 Construction Staking Resurfacing Reference 27,033 LF $0.1900 $5,136.27 $0.0500 $1,351.65 $0.2000 $5,406.60
650.9000 Construction Staking Curb Ramps 6 EACH $300.0000 $1,800.00 $100.0000 $600.00 $300.0000 $1,800.00
650.9500 Construction Staking Sidewalk (project) 01. 3030-05-74 1 EACH $400.0000 $400.00 $4,000.0000 $4,000.00 $400.0000 $400.00
650.9911 Construction Staking Supplemental Control (project) 01. 3030-05-74 1 EACH $600.0000 $600.00 $4,000.0000 $4,000.00 $600.0000 $600.00
690.0150 Sawing Asphalt 434 LF $1.2000 $520.80 $1.6900 $733.46 $1.2000 $520.80
690.0250 Sawing Concrete 240 LF $2.2000 $528.00 $2.2500 $540.00 $2.2000 $528.00
740.0440 Incentive IRI Ride 20,480 DOL $1.0000 $20,480.00 $1.0000 $20,480.00 $1.0000 $20,480.00
SPV.0035 Special 01. Foundation Backfill 538 CY $54.2600 $29,191.88 $26.5200 $14,267.76 $28.0000 $15,064.00
SPV.0060 Special 03. Adjusting Sanitary Manhole Covers 12 EACH $1,293.3333 $14,590.00 $819.5333 $9,600.80 $1,416.6667 $16,400.00
SPV.0180 Special 01. Removing Distressed Pavement Milling 4,710 SY $5.7500 $27,082.50 $6.1000 $28,731.00 $7.5500 $35,560.50

Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.

Want the analysis, not just the numbers? DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel. Explore DOTestimate →