Contract 20260414004
Cth N - Sth 73 (Cth Bb); Koshkonong Creek Bridge B-13-0916
- County
- Dane
- Letting
- April 14, 2026
- Bidders
- 3
Apparent low bid
R.G. HUSTON COMPANY, INC.
$1,635,572.63
Other bidders
SHEET PILING SERVICES LLC
$1,788,255.98
LUNDA CONSTRUCTION COMPANY
$1,816,377.57
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | R.G. HUSTON COMPANY, INC. $1,635,572.63 | SHEET PILING SERVICES LLC $1,788,255.98 | LUNDA CONSTRUCTION COMPANY $1,816,377.57 | |||
|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201.0205 | Grubbing | 2 | STA | $128.0000 | $256.00 | $1,300.0000 | $2,600.00 | $1,300.0000 | $2,600.00 |
| 203.0100 | Removing Small Pipe Culverts | 4 | EACH | $940.0000 | $3,760.00 | $400.0000 | $1,600.00 | $400.0000 | $1,600.00 |
| 203.0250 | Removing Structure Over Waterway Remove Debris (structure) 01. B-13-0081 | 1 | EACH | $73,350.0000 | $73,350.00 | $100,000.0000 | $100,000.00 | $85,000.0000 | $85,000.00 |
| 203.0260 | Removing Structure Over Waterway Minimal Debris (structure) 01. P-13-32 | 1 | EACH | $52,450.0000 | $52,450.00 | $100,000.0000 | $100,000.00 | $85,000.0000 | $85,000.00 |
| 204.0115 | Removing Asphaltic Surface Butt Joints | 20 | SY | $30.3000 | $606.00 | $30.0000 | $600.00 | $30.0000 | $600.00 |
| 204.0120 | Removing Asphaltic Surface Milling | 410 | SY | $12.4700 | $5,112.70 | $12.3500 | $5,063.50 | $12.3500 | $5,063.50 |
| 204.0165 | Removing Guardrail | 566 | LF | $3.0000 | $1,698.00 | $3.2500 | $1,839.50 | $3.2500 | $1,839.50 |
| 205.0100 | Excavation Common | 2,090 | CY | $11.2000 | $23,408.00 | $15.2500 | $31,872.50 | $15.2500 | $31,872.50 |
| 206.1001 | Excavation for Structures Bridges (structure) 02. B-13-0911 | 2 | EACH | $14,700.0000 | $29,400.00 | $50,000.0000 | $100,000.00 | $8,500.0000 | $17,000.00 |
| 210.1500 | Backfill Structure Type A | 1,120 | TON | $26.3500 | $29,512.00 | $30.0000 | $33,600.00 | $21.5000 | $24,080.00 |
| 213.0100 | Finishing Roadway (project) 02. 3679-00-73 | 2 | EACH | $300.0000 | $600.00 | $500.0000 | $1,000.00 | $500.0000 | $1,000.00 |
| 305.0110 | Base Aggregate Dense 3/4-Inch | 480 | TON | $33.2000 | $15,936.00 | $28.0000 | $13,440.00 | $28.0000 | $13,440.00 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 3,747 | TON | $21.1500 | $79,249.05 | $22.5000 | $84,307.50 | $22.5000 | $84,307.50 |
| 415.0080 | Concrete Pavement 8-Inch | 120 | SY | $93.6000 | $11,232.00 | $93.6000 | $11,232.00 | $93.6000 | $11,232.00 |
| 415.0410 | Concrete Pavement Approach Slab | 154 | SY | $250.0000 | $38,500.00 | $250.0000 | $38,500.00 | $250.0000 | $38,500.00 |
| 450.4000 | HMA Cold Weather Paving | 236 | TON | $4.0400 | $953.44 | $4.0000 | $944.00 | $4.0000 | $944.00 |
| 455.0605 | Tack Coat | 260 | GAL | $3.0300 | $787.80 | $3.0000 | $780.00 | $3.0000 | $780.00 |
| 460.2000 | Incentive Density HMA Pavement | 590 | DOL | $1.0000 | $590.00 | $1.0000 | $590.00 | $1.0000 | $590.00 |
| 460.5224 | HMA Pavement 4 LT 58-28 S | 370 | TON | $82.0700 | $30,365.90 | $81.2500 | $30,062.50 | $81.2500 | $30,062.50 |
| 460.6224 | HMA Pavement 4 MT 58-28 S | 540 | TON | $82.3200 | $44,452.80 | $81.5000 | $44,010.00 | $81.5000 | $44,010.00 |
| 502.0100 | Concrete Masonry Bridges | 675 | CY | $925.0000 | $624,375.00 | $860.0000 | $580,500.00 | $950.0000 | $641,250.00 |
| 502.3200 | Protective Surface Treatment | 784 | SY | $7.3000 | $5,723.20 | $5.0000 | $3,920.00 | $5.0000 | $3,920.00 |
| 502.3210 | Pigmented Surface Sealer | 89 | SY | $15.3000 | $1,361.70 | $5.0000 | $445.00 | $7.0000 | $623.00 |
| 505.0400 | Bar Steel Reinforcement HS Structures | 12,230 | LB | $1.3600 | $16,632.80 | $1.3000 | $15,899.00 | $1.2000 | $14,676.00 |
| 505.0600 | Bar Steel Reinforcement HS Coated Structures | 93,800 | LB | $1.3300 | $124,754.00 | $1.3500 | $126,630.00 | $1.3000 | $121,940.00 |
| 505.0800.S | Bar Steel Reinforcement HS Stainless Structures | 425 | LB | $5.1800 | $2,201.50 | $5.0000 | $2,125.00 | $3.8000 | $1,615.00 |
| 513.4061 | Railing Tubular Type M | 94 | LF | $350.0000 | $32,900.00 | $300.0000 | $28,200.00 | $315.0000 | $29,610.00 |
| 516.0500 | Rubberized Membrane Waterproofing | 54 | SY | $34.5000 | $1,863.00 | $35.0000 | $1,890.00 | $40.0000 | $2,160.00 |
| 520.1015 | Apron Endwalls for Culvert Pipe 15-Inch | 6 | EACH | $780.0000 | $4,680.00 | $375.0000 | $2,250.00 | $375.0000 | $2,250.00 |
| 520.1021 | Apron Endwalls for Culvert Pipe 21-Inch | 2 | EACH | $970.0000 | $1,940.00 | $525.0000 | $1,050.00 | $525.0000 | $1,050.00 |
| 520.3315 | Culvert Pipe Class III-A 15-Inch | 58 | LF | $61.0000 | $3,538.00 | $60.0000 | $3,480.00 | $60.0000 | $3,480.00 |
| 520.3321 | Culvert Pipe Class III-A 21-Inch | 57 | LF | $80.0000 | $4,560.00 | $75.0000 | $4,275.00 | $75.0000 | $4,275.00 |
| 520.3515 | Culvert Pipe Class III-B 15-Inch | 121 | LF | $67.5000 | $8,167.50 | $66.0000 | $7,986.00 | $66.0000 | $7,986.00 |
| 550.1100 | Piling Steel HP 10-Inch X 42 Lb | 1,580 | LF | $65.0000 | $102,700.00 | $55.0000 | $86,900.00 | $45.0000 | $71,100.00 |
| 601.0588 | Concrete Curb & Gutter 4-Inch Sloped 36-Inch Type TBT | 40 | LF | $60.0000 | $2,400.00 | $60.0000 | $2,400.00 | $60.0000 | $2,400.00 |
| 601.0590 | Concrete Curb & Gutter 4-Inch Sloped 36-Inch Type TBTT | 30 | LF | $60.0000 | $1,800.00 | $60.0000 | $1,800.00 | $60.0000 | $1,800.00 |
| 602.3010 | Concrete Surface Drains | 3.4 | CY | $750.0000 | $2,550.00 | $750.0000 | $2,550.00 | $750.0000 | $2,550.00 |
| 606.0200 | Riprap Medium | 14 | CY | $163.0000 | $2,282.00 | $75.0000 | $1,050.00 | $75.0000 | $1,050.00 |
| 606.0300 | Riprap Heavy | 560 | CY | $64.5000 | $36,120.00 | $85.0000 | $47,600.00 | $85.0000 | $47,600.00 |
| 612.0406 | Pipe Underdrain Wrapped 6-Inch | 430 | LF | $4.4000 | $1,892.00 | $7.0000 | $3,010.00 | $9.0000 | $3,870.00 |
| 614.0150 | Anchor Assemblies for Steel Plate Beam Guard | 4 | EACH | $340.0000 | $1,360.00 | $500.0000 | $2,000.00 | $300.0000 | $1,200.00 |
| 614.0200 | Steel Thrie Beam Structure Approach | 82.6 | LF | $84.0000 | $6,938.40 | $98.0000 | $8,094.80 | $98.0000 | $8,094.80 |
| 614.0345 | Steel Plate Beam Guard Short Radius | 143.75 | LF | $38.0000 | $5,462.50 | $38.1000 | $5,476.88 | $38.1000 | $5,476.88 |
| 614.0390 | Steel Plate Beam Guard Short Radius Terminal | 4 | EACH | $2,500.0000 | $10,000.00 | $2,250.0000 | $9,000.00 | $2,250.0000 | $9,000.00 |
| 614.2300 | MGS Guardrail 3 | 50 | LF | $30.0000 | $1,500.00 | $33.1000 | $1,655.00 | $33.1000 | $1,655.00 |
| 614.2500 | MGS Thrie Beam Transition | 157.6 | LF | $86.0000 | $13,553.60 | $91.7500 | $14,459.80 | $91.7500 | $14,459.80 |
| 614.2610 | MGS Guardrail Terminal EAT | 4 | EACH | $3,900.0000 | $15,600.00 | $3,900.0000 | $15,600.00 | $3,900.0000 | $15,600.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 02. 3679-00-73 | 2 | EACH | $85.0000 | $170.00 | $0.0100 | $0.02 | $1.0000 | $2.00 |
| 619.1000 | Mobilization | 1 | EACH | $74,115.0000 | $74,115.00 | $105,533.4900 | $105,533.49 | $194,773.4300 | $194,773.43 |
| 624.0100 | Water | 59 | MGAL | $0.0100 | $0.59 | $0.0100 | $0.59 | $0.0100 | $0.59 |
| 625.0100 | Topsoil | 1,900 | SY | $5.6000 | $10,640.00 | $7.5000 | $14,250.00 | $7.5000 | $14,250.00 |
| 628.1504 | Silt Fence | 1,520 | LF | $2.2500 | $3,420.00 | $1.7500 | $2,660.00 | $1.7500 | $2,660.00 |
| 628.1520 | Silt Fence Maintenance | 1,520 | LF | $0.0100 | $15.20 | $0.0500 | $76.00 | $0.0500 | $76.00 |
| 628.1905 | Mobilizations Erosion Control | 12 | EACH | $100.0000 | $1,200.00 | $200.0000 | $2,400.00 | $200.0000 | $2,400.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 8 | EACH | $100.0000 | $800.00 | $95.0000 | $760.00 | $95.0000 | $760.00 |
| 628.2008 | Erosion Mat Urban Class I Type B | 1,900 | SY | $1.9000 | $3,610.00 | $2.0000 | $3,800.00 | $2.0000 | $3,800.00 |
| 628.6005 | Turbidity Barriers | 600 | SY | $0.0100 | $6.00 | $34.5000 | $20,700.00 | $34.5000 | $20,700.00 |
| 628.7555 | Culvert Pipe Checks | 9 | EACH | $25.0000 | $225.00 | $27.2500 | $245.25 | $27.2500 | $245.25 |
| 629.0210 | Fertilizer Type B | 2 | CWT | $150.0000 | $300.00 | $125.0000 | $250.00 | $125.0000 | $250.00 |
| 630.0140 | Seeding Mixture No. 40 | 30 | LB | $15.0000 | $450.00 | $12.5000 | $375.00 | $12.5000 | $375.00 |
| 630.0175 | Seeding Mixture No. 75 | 14 | LB | $100.0000 | $1,400.00 | $52.1000 | $729.40 | $52.1000 | $729.40 |
| 630.0400 | Seeding Nurse Crop | 15 | LB | $5.0000 | $75.00 | $25.0000 | $375.00 | $25.0000 | $375.00 |
| 630.0500 | Seed Water | 15 | MGAL | $20.0000 | $300.00 | $15.0000 | $225.00 | $15.0000 | $225.00 |
| 634.0612 | Posts Wood 4x6-Inch X 12-FT | 12 | EACH | $85.0000 | $1,020.00 | $87.5000 | $1,050.00 | $87.5000 | $1,050.00 |
| 634.0614 | Posts Wood 4x6-Inch X 14-FT | 2 | EACH | $90.0000 | $180.00 | $87.5000 | $175.00 | $87.5000 | $175.00 |
| 637.2230 | Signs Type II Reflective F | 24 | SF | $30.0000 | $720.00 | $22.5000 | $540.00 | $22.5000 | $540.00 |
| 638.2102 | Moving Signs Type II | 5 | EACH | $150.0000 | $750.00 | $95.0000 | $475.00 | $95.0000 | $475.00 |
| 638.2602 | Removing Signs Type II | 8 | EACH | $40.0000 | $320.00 | $25.1000 | $200.80 | $25.1000 | $200.80 |
| 638.3000 | Removing Small Sign Supports | 14 | EACH | $40.0000 | $560.00 | $25.7500 | $360.50 | $25.7500 | $360.50 |
| 642.5001 | Field Office Type B | 1 | EACH | $1,100.0000 | $1,100.00 | $2,500.0000 | $2,500.00 | $6,000.0000 | $6,000.00 |
| 643.0420 | Traffic Control Barricades Type III | 3,850 | DAY | $0.3500 | $1,347.50 | $0.3500 | $1,347.50 | $0.6000 | $2,310.00 |
| 643.0705 | Traffic Control Warning Lights Type A | 7,650 | DAY | $0.1000 | $765.00 | $0.1000 | $765.00 | $0.1000 | $765.00 |
| 643.0900 | Traffic Control Signs | 32,000 | DAY | $0.2000 | $6,400.00 | $0.2000 | $6,400.00 | $0.3500 | $11,200.00 |
| 643.0920 | Traffic Control Covering Signs Type II | 6 | EACH | $25.0000 | $150.00 | $25.0000 | $150.00 | $50.0000 | $300.00 |
| 643.1050 | Traffic Control Signs PCMS | 28 | DAY | $69.0000 | $1,932.00 | $69.0000 | $1,932.00 | $35.0000 | $980.00 |
| 643.5000 | Traffic Control | 1 | EACH | $12,900.0000 | $12,900.00 | $12,900.0000 | $12,900.00 | $15,000.0000 | $15,000.00 |
| 645.0111 | Geotextile Type DF Schedule A | 265 | SY | $1.9500 | $516.75 | $5.0000 | $1,325.00 | $8.0000 | $2,120.00 |
| 645.0120 | Geotextile Type HR | 1,030 | SY | $3.8000 | $3,914.00 | $5.0000 | $5,150.00 | $6.0000 | $6,180.00 |
| 646.1005 | Marking Line Paint 4-Inch | 2,670 | LF | $1.5000 | $4,005.00 | $1.5000 | $4,005.00 | $3.0000 | $8,010.00 |
| 650.4500 | Construction Staking Subgrade | 760 | LF | $0.0100 | $7.60 | $0.0100 | $7.60 | $0.0100 | $7.60 |
| 650.5000 | Construction Staking Base | 760 | LF | $0.0100 | $7.60 | $1.2000 | $912.00 | $1.2000 | $912.00 |
| 650.5500 | Construction Staking Curb Gutter and Curb & Gutter | 40 | LF | $6.0000 | $240.00 | $3.0000 | $120.00 | $3.0000 | $120.00 |
| 650.6000 | Construction Staking Pipe Culverts | 4 | EACH | $200.0000 | $800.00 | $300.0000 | $1,200.00 | $300.0000 | $1,200.00 |
| 650.6501 | Construction Staking Structure Layout (structure) 02. B-13-0911 | 2 | EACH | $2,000.0000 | $4,000.00 | $2,300.0000 | $4,600.00 | $2,300.0000 | $4,600.00 |
| 650.7000 | Construction Staking Concrete Pavement | 60 | LF | $10.0000 | $600.00 | $10.0000 | $600.00 | $10.0000 | $600.00 |
| 650.9911 | Construction Staking Supplemental Control (project) 02. 3679-00-73 | 2 | EACH | $750.0000 | $1,500.00 | $500.0000 | $1,000.00 | $500.0000 | $1,000.00 |
| 650.9920 | Construction Staking Slope Stakes | 760 | LF | $2.0000 | $1,520.00 | $1.2000 | $912.00 | $1.2000 | $912.00 |
| 690.0150 | Sawing Asphalt | 130 | LF | $2.3500 | $305.50 | $7.0000 | $910.00 | $7.0000 | $910.00 |
| 715.0502 | Incentive Strength Concrete Structures | 4,050 | DOL | $1.0000 | $4,050.00 | $1.0000 | $4,050.00 | $1.0000 | $4,050.00 |
| 999.2005.S | Maintaining Bird Deterrent System (station) 02. 12+82 | 2 | EACH | $100.0000 | $200.00 | $0.0100 | $0.02 | $0.0100 | $0.02 |
| SPV.0090 | Special 01. Flashing Stainless Steel | 83 | LF | $120.0000 | $9,960.00 | $0.0100 | $0.83 | $55.0000 | $4,565.00 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →