WI
Wisconsin DOT · Bid Tabulation
Contract 20260414008
Lafarge - Hillsboro; Kickapoo River to STH 33
- County
- Vernon
- Letting
- April 14, 2026
- Bidders
- 1
Apparent low bid
MATHY CONSTRUCTION COMPANY
$7,846,576.66
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | MATHY CONSTRUCTION COMPANY $7,846,576.66 | |
|---|---|---|---|---|---|
| Unit Price | Extension | ||||
| 201.0205 | Grubbing | 3 | STA | $3,000.0000 | $9,000.00 |
| 203.0100 | Removing Small Pipe Culverts | 8 | EACH | $400.0000 | $3,200.00 |
| 203.0220 | Removing Structure (structure) 02. Pedestrian Bridge | 2 | EACH | $6,250.0000 | $12,500.00 |
| 203.0260 | Removing Structure Over Waterway Minimal Debris (structure) B-62-238 | 1 | EACH | $9,000.0000 | $9,000.00 |
| 203.0330 | Debris Containment (structure) 01. B-62-51 | 1 | EACH | $500.0000 | $500.00 |
| 204.0100 | Removing Concrete Pavement | 3 | SY | $140.0000 | $420.00 |
| 204.0115 | Removing Asphaltic Surface Butt Joints | 3,452 | SY | $5.6000 | $19,331.20 |
| 204.0120 | Removing Asphaltic Surface Milling | 240,450 | SY | $2.2400 | $538,608.00 |
| 204.0150 | Removing Curb & Gutter | 104 | LF | $10.0000 | $1,040.00 |
| 204.0155 | Removing Concrete Sidewalk | 64 | SY | $30.0000 | $1,920.00 |
| 204.0165 | Removing Guardrail | 1,665 | LF | $3.5000 | $5,827.50 |
| 204.0220 | Removing Inlets | 1 | EACH | $1,000.0000 | $1,000.00 |
| 204.0245 | Removing Storm Sewer (size) 01. 18-Inch | 98 | LF | $16.0000 | $1,568.00 |
| 204.0260 | Abandoning Inlets | 1 | EACH | $500.0000 | $500.00 |
| 205.0100 | Excavation Common | 882 | CY | $22.0000 | $19,404.00 |
| 206.2001 | Excavation for Structures Culverts (structure) B-62-238 | 1 | EACH | $7,000.0000 | $7,000.00 |
| 206.5001 | Cofferdams (structure) 01. B-62-238 | 1 | EACH | $3,500.0000 | $3,500.00 |
| 210.2500 | Backfill Structure Type B | 13 | TON | $104.0000 | $1,352.00 |
| 211.0101 | Prepare Foundation for Asphaltic Paving (project) 01. 5710-00-73 | 2 | EACH | $7,500.0000 | $15,000.00 |
| 213.0100 | Finishing Roadway (project) 01. 5710-00-73 | 2 | EACH | $5,000.0000 | $10,000.00 |
| 305.0110 | Base Aggregate Dense 3/4-Inch | 13,295 | TON | $22.6700 | $301,397.65 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 950 | TON | $26.2500 | $24,937.50 |
| 311.0110 | Breaker Run | 4 | TON | $112.2500 | $449.00 |
| 325.0100 | Pulverize and Relay | 223,560 | SY | $1.4100 | $315,219.60 |
| 374.1020.S | QMP Pulverize and Relay Compaction | 223,560 | SY | $0.1000 | $22,356.00 |
| 455.0605 | Tack Coat | 16,897 | GAL | $2.9400 | $49,677.18 |
| 460.0105.S | HMA Percent Within Limits (PWL) Test Strip Volumetrics | 1 | EACH | $10,000.0000 | $10,000.00 |
| 460.0110.S | HMA Percent Within Limits (PWL) Test Strip Density | 2 | EACH | $10,000.0000 | $20,000.00 |
| 460.2000 | Incentive Density HMA Pavement | 1,960 | DOL | $1.0000 | $1,960.00 |
| 460.2005 | Incentive Density PWL HMA Pavement | 42,660 | DOL | $1.0000 | $42,660.00 |
| 460.2007 | Incentive Density HMA Pavement Longitudinal Joints | 16,500 | DOL | $1.0000 | $16,500.00 |
| 460.2010 | Incentive Air Voids HMA Pavement | 45,310 | DOL | $1.0000 | $45,310.00 |
| 460.5224 | HMA Pavement 4 LT 58-28 S | 47,830 | TON | $85.9300 | $4,110,031.90 |
| 465.0105 | Asphaltic Surface | 17 | TON | $215.6800 | $3,666.56 |
| 465.0110 | Asphaltic Surface Patching | 38 | TON | $215.6800 | $8,195.84 |
| 465.0120 | Asphaltic Surface Driveways and Field Entrances | 480 | TON | $149.4200 | $71,721.60 |
| 465.0125 | Asphaltic Surface Temporary | 75 | TON | $190.0800 | $14,256.00 |
| 465.0560 | Asphaltic Rumble Strips, Centerline | 81,352 | LF | $0.1600 | $13,016.32 |
| 502.3200 | Protective Surface Treatment | 903 | SY | $5.0000 | $4,515.00 |
| 502.3210 | Pigmented Surface Sealer | 209 | SY | $10.0000 | $2,090.00 |
| 504.0100 | Concrete Masonry Culverts | 4 | CY | $3,330.0000 | $13,320.00 |
| 504.0900 | Concrete Masonry Endwalls | 10 | CY | $1,970.0000 | $19,700.00 |
| 505.0600 | Bar Steel Reinforcement HS Coated Structures | 440 | LB | $2.0000 | $880.00 |
| 509.0301 | Preparation Decks Type 1 | 64 | SY | $200.0000 | $12,800.00 |
| 509.0302 | Preparation Decks Type 2 | 28 | SY | $200.0000 | $5,600.00 |
| 509.0500 | Cleaning Decks | 903 | SY | $35.0000 | $31,605.00 |
| 509.1500 | Concrete Surface Repair | 102 | SF | $144.0000 | $14,688.00 |
| 509.2000 | Full-Depth Deck Repair | 5 | SY | $300.0000 | $1,500.00 |
| 509.2500 | Concrete Masonry Overlay Decks | 71 | CY | $1,500.0000 | $106,500.00 |
| 509.9025.S | Epoxy Injection Crack Repair | 12 | LF | $140.0000 | $1,680.00 |
| 509.9026.S | Cored Holes 2-Inch Diameter | 2 | EACH | $250.0000 | $500.00 |
| 511.1200 | Temporary Shoring (structure) 01. B-62-238 | 65 | SF | $90.0000 | $5,850.00 |
| 516.0500 | Rubberized Membrane Waterproofing | 3 | SY | $150.0000 | $450.00 |
| 520.8700 | Cleaning Culvert Pipes | 4 | EACH | $550.0000 | $2,200.00 |
| 520.9700.S | Culvert Pipe Liners (size) 01. 24-Inch | 64 | LF | $319.0000 | $20,416.00 |
| 520.9750.S | Cleaning Culvert Pipes for Liner Verification | 1 | EACH | $550.0000 | $550.00 |
| 521.1018 | Apron Endwalls for Culvert Pipe Steel 18-Inch | 4 | EACH | $465.0000 | $1,860.00 |
| 521.1024 | Apron Endwalls for Culvert Pipe Steel 24-Inch | 2 | EACH | $555.0000 | $1,110.00 |
| 521.1030 | Apron Endwalls for Culvert Pipe Steel 30-Inch | 6 | EACH | $785.0000 | $4,710.00 |
| 521.3118 | Culvert Pipe Corrugated Steel 18-Inch | 66 | LF | $96.0000 | $6,336.00 |
| 521.3130 | Culvert Pipe Corrugated Steel 30-Inch | 182 | LF | $126.0000 | $22,932.00 |
| 522.1018 | Apron Endwalls for Culvert Pipe Reinforced Concrete 18-Inch | 1 | EACH | $1,525.0000 | $1,525.00 |
| 522.1024 | Apron Endwalls for Culvert Pipe Reinforced Concrete 24-Inch | 1 | EACH | $1,685.0000 | $1,685.00 |
| 522.2619 | Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptical 19x30-Inch | 1 | EACH | $1,875.0000 | $1,875.00 |
| 601.0411 | Concrete Curb & Gutter 30-Inch Type D | 737 | LF | $35.0000 | $25,795.00 |
| 601.0557 | Concrete Curb & Gutter 6-Inch Sloped 36-Inch Type D | 16 | LF | $45.0000 | $720.00 |
| 601.0584 | Concrete Curb & Gutter 4-Inch Sloped 30-Inch Type TBT | 92 | LF | $45.0000 | $4,140.00 |
| 601.0600 | Concrete Curb Pedestrian | 16 | LF | $80.0000 | $1,280.00 |
| 602.0405 | Concrete Sidewalk 4-Inch | 829 | SF | $11.0000 | $9,119.00 |
| 602.0415 | Concrete Sidewalk 6-Inch | 81 | SF | $10.0000 | $810.00 |
| 602.0505 | Curb Ramp Detectable Warning Field Yellow | 60 | SF | $50.0000 | $3,000.00 |
| 602.0605 | Curb Ramp Detectable Warning Field Radial Yellow | 11 | SF | $55.0000 | $605.00 |
| 602.1500 | Concrete Steps | 60 | SF | $80.0000 | $4,800.00 |
| 602.3010 | Concrete Surface Drains | 2 | CY | $3,500.0000 | $7,000.00 |
| 603.8000 | Concrete Barrier Temporary Precast Delivered | 532 | LF | $20.0000 | $10,640.00 |
| 603.8125 | Concrete Barrier Temporary Precast Installed | 1,032 | LF | $5.0000 | $5,160.00 |
| 606.0200 | Riprap Medium | 90 | CY | $119.0000 | $10,710.00 |
| 606.0300 | Riprap Heavy | 224 | CY | $120.0000 | $26,880.00 |
| 608.0418 | Storm Sewer Pipe Reinforced Concrete Class IV 18-Inch | 61 | LF | $99.0000 | $6,039.00 |
| 608.0424 | Storm Sewer Pipe Reinforced Concrete Class IV 24-Inch | 54 | LF | $129.0000 | $6,966.00 |
| 608.2414 | Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 14x23-Inch | 41 | LF | $155.0000 | $6,355.00 |
| 608.2419 | Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 19x30-Inch | 41 | LF | $175.0000 | $7,175.00 |
| 611.0545 | Manhole Covers Type L | 1 | EACH | $950.0000 | $950.00 |
| 611.0624 | Inlet Covers Type H | 3 | EACH | $1,180.0000 | $3,540.00 |
| 611.0642 | Inlet Covers Type MS | 3 | EACH | $700.0000 | $2,100.00 |
| 611.2004 | Manholes 4-FT Diameter | 1 | EACH | $3,300.0000 | $3,300.00 |
| 611.3004 | Inlets 4-FT Diameter | 3 | EACH | $3,300.0000 | $9,900.00 |
| 611.3901 | Inlets Median 1 Grate | 1 | EACH | $2,550.0000 | $2,550.00 |
| 611.3902 | Inlets Median 2 Grate | 1 | EACH | $2,800.0000 | $2,800.00 |
| 612.0902.S | Insulation Board Polystyrene (inch) 01. 2-Inch | 194 | SY | $36.0000 | $6,984.00 |
| 614.0010 | Barrier System Grading Shaping Finishing | 9 | EACH | $2,298.0000 | $20,682.00 |
| 614.0200 | Steel Thrie Beam Structure Approach | 21 | LF | $94.0000 | $1,974.00 |
| 614.0345 | Steel Plate Beam Guard Short Radius | 25 | LF | $38.0000 | $950.00 |
| 614.0390 | Steel Plate Beam Guard Short Radius Terminal | 1 | EACH | $2,190.0000 | $2,190.00 |
| 614.0400 | Adjusting Steel Plate Beam Guard | 607 | LF | $10.6000 | $6,434.20 |
| 614.0905 | Crash Cushions Temporary | 4 | EACH | $3,320.0000 | $13,280.00 |
| 614.0950 | Replacing Guardrail Posts and Blocks | 10 | EACH | $100.0000 | $1,000.00 |
| 614.0951 | Replacing Guardrail Rail and Hardware | 100 | LF | $17.0000 | $1,700.00 |
| 614.0952 | Replacing Guardrail Reflectors | 6 | EACH | $12.0000 | $72.00 |
| 614.2300 | MGS Guardrail 3 | 875 | LF | $28.6000 | $25,025.00 |
| 614.2330 | MGS Guardrail 3 K | 488 | LF | $44.0000 | $21,472.00 |
| 614.2340 | MGS Guardrail 3 L | 339 | LF | $33.0000 | $11,187.00 |
| 614.2350 | MGS Guardrail Short Radius | 34 | LF | $37.9000 | $1,288.60 |
| 614.2500 | MGS Thrie Beam Transition | 118 | LF | $94.0000 | $11,092.00 |
| 614.2610 | MGS Guardrail Terminal EAT | 12 | EACH | $3,920.0000 | $47,040.00 |
| 614.2630 | MGS Guardrail Short Radius Terminal | 1 | EACH | $2,200.0000 | $2,200.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 01. 5710-00-72 | 1 | EACH | $7,500.0000 | $7,500.00 |
| 619.1000 | Mobilization | 1 | EACH | $680,182.5800 | $680,182.58 |
| 624.0100 | Water | 639 | MGAL | $14.2200 | $9,086.58 |
| 625.0500 | Salvaged Topsoil | 769 | SY | $4.0000 | $3,076.00 |
| 628.1504 | Silt Fence | 1,794 | LF | $2.2000 | $3,946.80 |
| 628.1520 | Silt Fence Maintenance | 1,794 | LF | $0.0100 | $17.94 |
| 628.1905 | Mobilizations Erosion Control | 4 | EACH | $500.0000 | $2,000.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 2 | EACH | $200.0000 | $400.00 |
| 628.2008 | Erosion Mat Urban Class I Type B | 769 | SY | $2.2900 | $1,761.01 |
| 628.7005 | Inlet Protection Type A | 7 | EACH | $106.0000 | $742.00 |
| 628.7010 | Inlet Protection Type B | 5 | EACH | $72.0000 | $360.00 |
| 628.7015 | Inlet Protection Type C | 19 | EACH | $72.0000 | $1,368.00 |
| 628.7504 | Temporary Ditch Checks | 38 | LF | $8.9500 | $340.10 |
| 628.7555 | Culvert Pipe Checks | 81 | EACH | $15.0000 | $1,215.00 |
| 629.0210 | Fertilizer Type B | 0.6 | CWT | $110.0000 | $66.00 |
| 630.0120 | Seeding Mixture No. 20 | 21 | LB | $8.7500 | $183.75 |
| 630.0200 | Seeding Temporary | 22 | LB | $3.5500 | $78.10 |
| 630.0500 | Seed Water | 17 | MGAL | $25.0000 | $425.00 |
| 633.5200 | Markers Culvert End | 12 | EACH | $71.0000 | $852.00 |
| 634.0616 | Posts Wood 4x6-Inch X 16-FT | 14 | EACH | $85.0000 | $1,190.00 |
| 634.0808 | Posts Tubular Steel 2x2-Inch X 8-FT | 2 | EACH | $208.0000 | $416.00 |
| 637.2210 | Signs Type II Reflective H | 11 | SF | $23.0000 | $253.00 |
| 638.2102 | Moving Signs Type II | 15 | EACH | $119.0000 | $1,785.00 |
| 638.2602 | Removing Signs Type II | 4 | EACH | $25.0000 | $100.00 |
| 638.3000 | Removing Small Sign Supports | 18 | EACH | $25.0000 | $450.00 |
| 642.5001 | Field Office Type B | 1 | EACH | $15,000.0000 | $15,000.00 |
| 643.0300 | Traffic Control Drums | 2,260 | DAY | $0.2000 | $452.00 |
| 643.0420 | Traffic Control Barricades Type III | 21,997 | DAY | $0.4500 | $9,898.65 |
| 643.0705 | Traffic Control Warning Lights Type A | 43,994 | DAY | $0.1000 | $4,399.40 |
| 643.0715 | Traffic Control Warning Lights Type C | 750 | DAY | $0.1500 | $112.50 |
| 643.0900 | Traffic Control Signs | 43,106 | DAY | $0.1800 | $7,759.08 |
| 643.0920 | Traffic Control Covering Signs Type II | 34 | EACH | $70.0000 | $2,380.00 |
| 643.1050 | Traffic Control Signs PCMS | 14 | DAY | $25.0000 | $350.00 |
| 643.1070 | Traffic Control Cones 42-Inch | 360 | DAY | $0.2000 | $72.00 |
| 643.3165 | Temporary Marking Line Paint 6-Inch | 209,746 | LF | $0.2800 | $58,728.88 |
| 643.3180 | Temporary Marking Line Removable Tape 6-Inch | 1,323 | LF | $2.1500 | $2,844.45 |
| 643.3805 | Temporary Marking Stop Line Paint 18-Inch | 66 | LF | $10.7000 | $706.20 |
| 643.5000 | Traffic Control | 1 | EACH | $86,400.0000 | $86,400.00 |
| 644.1430 | Temporary Pedestrian Surface Plate | 525 | SF | $10.2500 | $5,381.25 |
| 644.1605 | Temporary Pedestrian Detectable Warning Field | 50 | SF | $3.2500 | $162.50 |
| 644.1810 | Temporary Pedestrian Barricade | 802 | LF | $7.1000 | $5,694.20 |
| 645.0120 | Geotextile Type HR | 404 | SY | $5.0000 | $2,020.00 |
| 646.2040 | Marking Line Grooved Wet Ref Epoxy 6-Inch | 275,130 | LF | $1.1500 | $316,399.50 |
| 646.6120 | Marking Stop Line Epoxy 18-Inch | 118 | LF | $15.3900 | $1,816.02 |
| 646.7420 | Marking Crosswalk Epoxy Transverse Line 6-Inch | 2,120 | LF | $10.5400 | $22,344.80 |
| 646.9000 | Marking Removal Line 4-Inch | 2,624 | LF | $1.4000 | $3,673.60 |
| 648.0100 | Locating No-Passing Zones | 15.62 | MI | $482.8300 | $7,541.80 |
| 650.4000 | Construction Staking Storm Sewer | 9 | EACH | $200.0000 | $1,800.00 |
| 650.5000 | Construction Staking Base | 84,471 | LF | $0.0100 | $844.71 |
| 650.5500 | Construction Staking Curb Gutter and Curb & Gutter | 845 | LF | $2.7700 | $2,340.65 |
| 650.6000 | Construction Staking Pipe Culverts | 5 | EACH | $300.0000 | $1,500.00 |
| 650.6501 | Construction Staking Structure Layout (structure) 01. B-62-51 | 1 | EACH | $1,000.0000 | $1,000.00 |
| 650.8000 | Construction Staking Resurfacing Reference | 84,471 | LF | $0.4500 | $38,011.95 |
| 650.9000 | Construction Staking Curb Ramps | 7 | EACH | $300.0000 | $2,100.00 |
| 650.9500 | Construction Staking Sidewalk (project) 01. 5710-00-72 | 1 | EACH | $5,000.0000 | $5,000.00 |
| 650.9911 | Construction Staking Supplemental Control (project) 01. 5710-00-72 | 1 | EACH | $10,000.0000 | $10,000.00 |
| 661.0101 | Temporary Traffic Signals for Bridges (structure) 01. B-62-51 | 1 | EACH | $3,250.0000 | $3,250.00 |
| 680.0100 | Public Land Reference Monument Verify and Reset | 4 | EACH | $600.0000 | $2,400.00 |
| 690.0150 | Sawing Asphalt | 766 | LF | $1.7400 | $1,332.84 |
| 690.0250 | Sawing Concrete | 53 | LF | $3.5000 | $185.50 |
| 740.0440 | Incentive IRI Ride | 31,866.67 | DOL | $1.0000 | $31,866.67 |
| 999.2005.S | Maintaining Bird Deterrent System (station) 02. 107+65 Left | 2 | EACH | $500.5000 | $1,001.00 |
| SPV.0060 | Special 04. Foam Void Filling | 42 | EACH | $1,550.0000 | $17,900.00 |
| SPV.0090 | Special 02.Culvert Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 43x68-Inch | 208 | LF | $414.0000 | $98,304.00 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →