WI
Wisconsin DOT · Bid Tabulation
Contract 20260414009
Sth 213 To The Rock River; Cth D Intersection
- County
- Rock
- Letting
- April 14, 2026
- Bidders
- 2
Apparent low bid
PARISI CONSTRUCTION, LLC
$660,489.61
Other bidders
ROCK ROAD COMPANIES, INC.
$661,731.35
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | PARISI CONSTRUCTION, LLC $660,489.61 | ROCK ROAD COMPANIES, INC. $661,731.35 | ||
|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | ||||
| 204.0110 | Removing Asphaltic Surface | 605 | SY | $10.0000 | $6,050.00 | $7.2900 | $4,410.45 |
| 204.0150 | Removing Curb & Gutter | 951 | LF | $10.0000 | $9,510.00 | $9.8300 | $9,348.33 |
| 204.0155 | Removing Concrete Sidewalk | 1,806 | SY | $0.0100 | $18.06 | $0.0100 | $18.06 |
| 204.0195 | Removing Concrete Bases | 7 | EACH | $700.0000 | $4,900.00 | $330.8400 | $2,315.88 |
| 204.0220 | Removing Inlets | 3 | EACH | $760.0000 | $2,280.00 | $991.9900 | $2,975.97 |
| 204.0245 | Removing Storm Sewer (size) 01. 12-inch | 17 | LF | $43.7500 | $743.75 | $43.7600 | $743.92 |
| 204.0280 | Sealing Pipes | 1 | EACH | $320.0000 | $320.00 | $2,544.7300 | $2,544.73 |
| 205.0100 | Excavation Common | 894 | CY | $24.2500 | $21,679.50 | $30.3900 | $27,168.66 |
| 211.0101 | Prepare Foundation for Asphaltic Paving (project) 01. 5755-00-73 | 1 | EACH | $100.0000 | $100.00 | $0.0100 | $0.01 |
| 213.0100 | Finishing Roadway (project) 01. 5755-00-73 | 1 | EACH | $500.0000 | $500.00 | $6,853.9300 | $6,853.93 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 1,100 | TON | $23.7500 | $26,125.00 | $19.3100 | $21,241.00 |
| 455.0605 | Tack Coat | 330 | GAL | $1.0000 | $330.00 | $4.0900 | $1,349.70 |
| 460.6223 | HMA Pavement 3 MT 58-28 S | 240 | TON | $110.0000 | $26,400.00 | $104.6100 | $25,106.40 |
| 460.6224 | HMA Pavement 4 MT 58-28 S | 190 | TON | $110.0000 | $20,900.00 | $111.7700 | $21,236.30 |
| 520.8000 | Concrete Collars for Pipe | 1 | EACH | $1,800.0000 | $1,800.00 | $954.2500 | $954.25 |
| 601.0407 | Concrete Curb & Gutter 18-Inch Type D | 304 | LF | $55.0000 | $16,720.00 | $34.6800 | $10,542.72 |
| 602.0410 | Concrete Sidewalk 5-Inch | 2,546 | SF | $7.0000 | $17,822.00 | $8.5600 | $21,793.76 |
| 602.2400 | Concrete Safety Islands | 1,387 | SF | $26.0000 | $36,062.00 | $14.1000 | $19,556.70 |
| 608.0412 | Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch | 6 | LF | $320.0000 | $1,920.00 | $212.3400 | $1,274.04 |
| 611.0666 | Inlet Covers Type Z | 1 | EACH | $1,900.0000 | $1,900.00 | $1,766.1900 | $1,766.19 |
| 611.1003 | Catch Basins 3-FT Diameter | 1 | EACH | $3,700.0000 | $3,700.00 | $8,016.8400 | $8,016.84 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 01. 5755-00-73 | 1 | EACH | $100.0000 | $100.00 | $0.0100 | $0.01 |
| 619.1000 | Mobilization | 1 | EACH | $42,000.0000 | $42,000.00 | $65,000.0000 | $65,000.00 |
| 620.0300 | Concrete Median Sloped Nose | 54 | SF | $17.5000 | $945.00 | $12.6100 | $680.94 |
| 624.0100 | Water | 20 | MGAL | $15.0000 | $300.00 | $0.0100 | $0.20 |
| 625.0500 | Salvaged Topsoil | 100 | SY | $10.0000 | $1,000.00 | $0.0100 | $1.00 |
| 628.1504 | Silt Fence | 40 | LF | $5.1000 | $204.00 | $8.0000 | $320.00 |
| 628.1520 | Silt Fence Maintenance | 40 | LF | $0.0100 | $0.40 | $0.0100 | $0.40 |
| 628.1905 | Mobilizations Erosion Control | 3 | EACH | $260.0000 | $780.00 | $400.0000 | $1,200.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 2 | EACH | $260.0000 | $520.00 | $500.0000 | $1,000.00 |
| 628.2004 | Erosion Mat Class I Type B | 100 | SY | $5.1000 | $510.00 | $5.0000 | $500.00 |
| 628.7010 | Inlet Protection Type B | 1 | EACH | $77.0000 | $77.00 | $100.0000 | $100.00 |
| 628.7015 | Inlet Protection Type C | 8 | EACH | $77.0000 | $616.00 | $100.0000 | $800.00 |
| 628.7504 | Temporary Ditch Checks | 37 | LF | $8.1000 | $299.70 | $12.0000 | $444.00 |
| 628.7555 | Culvert Pipe Checks | 3 | EACH | $20.5000 | $61.50 | $20.0000 | $60.00 |
| 629.0210 | Fertilizer Type B | 0.06 | CWT | $150.0000 | $9.00 | $1,000.0000 | $60.00 |
| 630.0130 | Seeding Mixture No. 30 | 5 | LB | $51.0000 | $255.00 | $40.0000 | $200.00 |
| 634.0618 | Posts Wood 4x6-Inch X 18-FT | 8 | EACH | $150.0000 | $1,200.00 | $120.0000 | $960.00 |
| 634.0808 | Posts Tubular Steel 2x2-Inch X 8-FT | 4 | EACH | $230.0000 | $920.00 | $350.0000 | $1,400.00 |
| 637.2210 | Signs Type II Reflective H | 138.63 | SF | $25.5000 | $3,535.07 | $30.0000 | $4,158.90 |
| 637.2230 | Signs Type II Reflective F | 25 | SF | $25.5000 | $637.50 | $30.0000 | $750.00 |
| 638.2602 | Removing Signs Type II | 25 | EACH | $30.5000 | $762.50 | $25.0000 | $625.00 |
| 638.3000 | Removing Small Sign Supports | 10 | EACH | $30.5000 | $305.00 | $25.0000 | $250.00 |
| 642.5201 | Field Office Type C | 1 | EACH | $5,200.0000 | $5,200.00 | $5,000.0000 | $5,000.00 |
| 643.0300 | Traffic Control Drums | 10,741 | DAY | $0.5000 | $5,370.50 | $0.5000 | $5,370.50 |
| 643.0420 | Traffic Control Barricades Type III | 614 | DAY | $2.0000 | $1,228.00 | $2.0000 | $1,228.00 |
| 643.0705 | Traffic Control Warning Lights Type A | 1,128 | DAY | $0.1000 | $112.80 | $0.1100 | $124.08 |
| 643.0715 | Traffic Control Warning Lights Type C | 1,100 | DAY | $0.1500 | $165.00 | $0.1300 | $143.00 |
| 643.0810 | Traffic Control Connected Arrow Boards | 55 | DAY | $20.5000 | $1,127.50 | $20.0000 | $1,100.00 |
| 643.0900 | Traffic Control Signs | 8,867 | DAY | $0.7500 | $6,650.25 | $0.7500 | $6,650.25 |
| 643.0920 | Traffic Control Covering Signs Type II | 1 | EACH | $40.7500 | $40.75 | $40.0000 | $40.00 |
| 643.1050 | Traffic Control Signs PCMS | 124 | DAY | $61.0000 | $7,564.00 | $60.0000 | $7,440.00 |
| 643.3180 | Temporary Marking Line Removable Tape 6-Inch | 725 | LF | $3.1000 | $2,247.50 | $3.0000 | $2,175.00 |
| 643.3960 | Temporary Marking Removable Mask Out Tape 6-Inch | 625 | LF | $3.3000 | $2,062.50 | $3.2500 | $2,031.25 |
| 643.3990 | Temporary Marking Removable Mask Out Tape 12-Inch | 100 | LF | $6.6000 | $660.00 | $6.5000 | $650.00 |
| 643.5000 | Traffic Control | 1 | EACH | $13,300.0000 | $13,300.00 | $13,000.0000 | $13,000.00 |
| 646.2020 | Marking Line Epoxy 6-Inch | 1,320 | LF | $2.0000 | $2,640.00 | $1.5000 | $1,980.00 |
| 646.4020 | Marking Line Epoxy 10-Inch | 935 | LF | $3.7000 | $3,459.50 | $3.0000 | $2,805.00 |
| 646.5020 | Marking Arrow Epoxy | 4 | EACH | $260.0000 | $1,040.00 | $230.0000 | $920.00 |
| 646.5120 | Marking Word Epoxy | 2 | EACH | $360.0000 | $720.00 | $250.0000 | $500.00 |
| 646.6120 | Marking Stop Line Epoxy 18-Inch | 226 | LF | $14.7500 | $3,333.50 | $13.0000 | $2,938.00 |
| 646.7320 | Marking Chevron Epoxy 12-Inch | 82 | LF | $13.2500 | $1,086.50 | $9.7500 | $799.50 |
| 646.8220 | Marking Island Nose Epoxy | 3 | EACH | $350.0000 | $1,050.00 | $300.0000 | $900.00 |
| 646.9200 | Marking Removal Line Wide | 79 | LF | $8.5000 | $671.50 | $8.3000 | $655.70 |
| 650.4000 | Construction Staking Storm Sewer | 1 | EACH | $500.0000 | $500.00 | $1.0000 | $1.00 |
| 650.5000 | Construction Staking Base | 728 | LF | $0.0100 | $7.28 | $0.0100 | $7.28 |
| 650.5500 | Construction Staking Curb Gutter and Curb & Gutter | 304 | LF | $2.0000 | $608.00 | $1.0000 | $304.00 |
| 650.8000 | Construction Staking Resurfacing Reference | 728 | LF | $0.5000 | $364.00 | $0.0300 | $21.84 |
| 650.9500 | Construction Staking Sidewalk (project) 01. 5755-00-73 | 1 | EACH | $3,000.0000 | $3,000.00 | $1,000.0000 | $1,000.00 |
| 650.9911 | Construction Staking Supplemental Control (project) 01. 5755-00-73 | 1 | EACH | $1,250.0000 | $1,250.00 | $4,000.0000 | $4,000.00 |
| 652.0225 | Conduit Rigid Nonmetallic Schedule 40 2-Inch | 40 | LF | $6.5000 | $260.00 | $6.3900 | $255.60 |
| 652.0235 | Conduit Rigid Nonmetallic Schedule 40 3-Inch | 115 | LF | $8.5000 | $977.50 | $8.3200 | $956.80 |
| 652.0605 | Conduit Special 2-Inch | 131 | LF | $16.7500 | $2,194.25 | $16.4400 | $2,153.64 |
| 652.0615 | Conduit Special 3-Inch | 854 | LF | $25.0000 | $21,350.00 | $24.4000 | $20,837.60 |
| 652.0700.S | Install Conduit into Existing Item | 4 | EACH | $250.0000 | $1,000.00 | $249.7100 | $998.84 |
| 653.0140 | Pull Boxes Steel 24x42-Inch | 7 | EACH | $1,300.0000 | $9,100.00 | $1,237.2400 | $8,660.68 |
| 653.0905 | Removing Pull Boxes | 15 | EACH | $110.0000 | $1,650.00 | $112.3500 | $1,685.25 |
| 654.0101 | Concrete Bases Type 1 | 4 | EACH | $910.0000 | $3,640.00 | $895.2900 | $3,581.16 |
| 654.0120 | Concrete Bases Type 10-Special | 4 | EACH | $9,800.0000 | $39,200.00 | $9,621.4600 | $38,485.84 |
| 654.0217 | Concrete Control Cabinet Bases Type 9 Special | 1 | EACH | $2,800.0000 | $2,800.00 | $2,793.0700 | $2,793.07 |
| 655.0230 | Cable Traffic Signal 5-14 AWG | 744 | LF | $1.5000 | $1,116.00 | $1.5100 | $1,123.44 |
| 655.0260 | Cable Traffic Signal 12-14 AWG | 1,705 | LF | $2.9000 | $4,944.50 | $2.8800 | $4,910.40 |
| 655.0515 | Electrical Wire Traffic Signals 10 AWG | 1,436 | LF | $1.1000 | $1,579.60 | $1.0900 | $1,565.24 |
| 655.0900 | Traffic Signal EVP Detector Cable | 688 | LF | $1.4000 | $963.20 | $1.3200 | $908.16 |
| 656.0201 | Electrical Service Meter Breaker Pedestal (location) 01. CTH Q & CTH D | 1 | EACH | $1,800.0000 | $1,800.00 | $1,717.3200 | $1,717.32 |
| 657.0100 | Pedestal Bases | 4 | EACH | $340.0000 | $1,360.00 | $331.7200 | $1,326.88 |
| 657.0347 | Poles Type 9-Special | 4 | EACH | $13,300.0000 | $53,200.00 | $13,055.9300 | $52,223.72 |
| 657.0420 | Traffic Signal Standards Aluminum 13-FT | 2 | EACH | $970.0000 | $1,940.00 | $950.0900 | $1,900.18 |
| 657.0425 | Traffic Signal Standards Aluminum 15-FT | 2 | EACH | $1,000.0000 | $2,000.00 | $1,006.2100 | $2,012.42 |
| 657.0536 | Monotube Arms 35-FT-Special | 2 | EACH | $5,800.0000 | $11,600.00 | $5,707.7100 | $11,415.42 |
| 657.0541 | Monotube Arms 40-FT-Special | 1 | EACH | $6,000.0000 | $6,000.00 | $5,844.8900 | $5,844.89 |
| 657.0546 | Monotube Arms 45-FT-Special | 1 | EACH | $6,400.0000 | $6,400.00 | $6,247.9900 | $6,247.99 |
| 658.0173 | Traffic Signal Face 3S 12-Inch | 16 | EACH | $830.0000 | $13,280.00 | $818.2900 | $13,092.64 |
| 658.0174 | Traffic Signal Face 4S 12-Inch | 4 | EACH | $1,100.0000 | $4,400.00 | $1,056.8600 | $4,227.44 |
| 658.5070 | Signal Mounting Hardware (location) 01. CTH Q & CTH D | 1 | EACH | $6,600.0000 | $6,600.00 | $6,468.8000 | $6,468.80 |
| 659.5000.S | Lamp, Ballast, LED, Switch Disposal by Contractor | 14 | EACH | $38.2500 | $535.50 | $37.4400 | $524.16 |
| 661.0201 | Temporary Traffic Signals for Intersections (location) 01. CTH Q & CTH D | 1 | EACH | $28,700.0000 | $28,700.00 | $28,164.7200 | $28,164.72 |
| 680.0100 | Public Land Reference Monument Verify and Reset | 1 | EACH | $1,150.0000 | $1,150.00 | $500.0000 | $500.00 |
| 690.0150 | Sawing Asphalt | 1,380 | LF | $1.4000 | $1,932.00 | $1.1300 | $1,559.40 |
| 690.0250 | Sawing Concrete | 8 | LF | $10.0000 | $80.00 | $5.0100 | $40.08 |
| ASP.1T0A | On-the-Job Training Apprentice at $5.00/HR | 1,200 | HRS | $5.0000 | $6,000.00 | $5.0000 | $6,000.00 |
| ASP.1T0G | On-the-Job Training Graduate at $5.00/HR | 600 | HRS | $5.0000 | $3,000.00 | $5.0000 | $3,000.00 |
| SPV.0060 | Special 05. Emergency Vehicle Preemption (CTH Q & CTH D) | 8 | EACH | $19,478.0000 | $99,460.00 | $19,077.3760 | $97,036.88 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.