WI Wisconsin DOT · Bid Tabulation

Contract 20260414009

Sth 213 To The Rock River; Cth D Intersection

County
Rock
Letting
April 14, 2026
Bidders
2
Apparent low bid PARISI CONSTRUCTION, LLC $660,489.61
Other bidders ROCK ROAD COMPANIES, INC. $661,731.35

Bid Items - unit price and extension by bidder

Item Description Qty UOM PARISI CONSTRUCTION, LLC $660,489.61 ROCK ROAD COMPANIES, INC. $661,731.35
Unit Price Extension Unit Price Extension
204.0110 Removing Asphaltic Surface 605 SY $10.0000 $6,050.00 $7.2900 $4,410.45
204.0150 Removing Curb & Gutter 951 LF $10.0000 $9,510.00 $9.8300 $9,348.33
204.0155 Removing Concrete Sidewalk 1,806 SY $0.0100 $18.06 $0.0100 $18.06
204.0195 Removing Concrete Bases 7 EACH $700.0000 $4,900.00 $330.8400 $2,315.88
204.0220 Removing Inlets 3 EACH $760.0000 $2,280.00 $991.9900 $2,975.97
204.0245 Removing Storm Sewer (size) 01. 12-inch 17 LF $43.7500 $743.75 $43.7600 $743.92
204.0280 Sealing Pipes 1 EACH $320.0000 $320.00 $2,544.7300 $2,544.73
205.0100 Excavation Common 894 CY $24.2500 $21,679.50 $30.3900 $27,168.66
211.0101 Prepare Foundation for Asphaltic Paving (project) 01. 5755-00-73 1 EACH $100.0000 $100.00 $0.0100 $0.01
213.0100 Finishing Roadway (project) 01. 5755-00-73 1 EACH $500.0000 $500.00 $6,853.9300 $6,853.93
305.0120 Base Aggregate Dense 1 1/4-Inch 1,100 TON $23.7500 $26,125.00 $19.3100 $21,241.00
455.0605 Tack Coat 330 GAL $1.0000 $330.00 $4.0900 $1,349.70
460.6223 HMA Pavement 3 MT 58-28 S 240 TON $110.0000 $26,400.00 $104.6100 $25,106.40
460.6224 HMA Pavement 4 MT 58-28 S 190 TON $110.0000 $20,900.00 $111.7700 $21,236.30
520.8000 Concrete Collars for Pipe 1 EACH $1,800.0000 $1,800.00 $954.2500 $954.25
601.0407 Concrete Curb & Gutter 18-Inch Type D 304 LF $55.0000 $16,720.00 $34.6800 $10,542.72
602.0410 Concrete Sidewalk 5-Inch 2,546 SF $7.0000 $17,822.00 $8.5600 $21,793.76
602.2400 Concrete Safety Islands 1,387 SF $26.0000 $36,062.00 $14.1000 $19,556.70
608.0412 Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch 6 LF $320.0000 $1,920.00 $212.3400 $1,274.04
611.0666 Inlet Covers Type Z 1 EACH $1,900.0000 $1,900.00 $1,766.1900 $1,766.19
611.1003 Catch Basins 3-FT Diameter 1 EACH $3,700.0000 $3,700.00 $8,016.8400 $8,016.84
618.0100 Maintenance and Repair of Haul Roads (project) 01. 5755-00-73 1 EACH $100.0000 $100.00 $0.0100 $0.01
619.1000 Mobilization 1 EACH $42,000.0000 $42,000.00 $65,000.0000 $65,000.00
620.0300 Concrete Median Sloped Nose 54 SF $17.5000 $945.00 $12.6100 $680.94
624.0100 Water 20 MGAL $15.0000 $300.00 $0.0100 $0.20
625.0500 Salvaged Topsoil 100 SY $10.0000 $1,000.00 $0.0100 $1.00
628.1504 Silt Fence 40 LF $5.1000 $204.00 $8.0000 $320.00
628.1520 Silt Fence Maintenance 40 LF $0.0100 $0.40 $0.0100 $0.40
628.1905 Mobilizations Erosion Control 3 EACH $260.0000 $780.00 $400.0000 $1,200.00
628.1910 Mobilizations Emergency Erosion Control 2 EACH $260.0000 $520.00 $500.0000 $1,000.00
628.2004 Erosion Mat Class I Type B 100 SY $5.1000 $510.00 $5.0000 $500.00
628.7010 Inlet Protection Type B 1 EACH $77.0000 $77.00 $100.0000 $100.00
628.7015 Inlet Protection Type C 8 EACH $77.0000 $616.00 $100.0000 $800.00
628.7504 Temporary Ditch Checks 37 LF $8.1000 $299.70 $12.0000 $444.00
628.7555 Culvert Pipe Checks 3 EACH $20.5000 $61.50 $20.0000 $60.00
629.0210 Fertilizer Type B 0.06 CWT $150.0000 $9.00 $1,000.0000 $60.00
630.0130 Seeding Mixture No. 30 5 LB $51.0000 $255.00 $40.0000 $200.00
634.0618 Posts Wood 4x6-Inch X 18-FT 8 EACH $150.0000 $1,200.00 $120.0000 $960.00
634.0808 Posts Tubular Steel 2x2-Inch X 8-FT 4 EACH $230.0000 $920.00 $350.0000 $1,400.00
637.2210 Signs Type II Reflective H 138.63 SF $25.5000 $3,535.07 $30.0000 $4,158.90
637.2230 Signs Type II Reflective F 25 SF $25.5000 $637.50 $30.0000 $750.00
638.2602 Removing Signs Type II 25 EACH $30.5000 $762.50 $25.0000 $625.00
638.3000 Removing Small Sign Supports 10 EACH $30.5000 $305.00 $25.0000 $250.00
642.5201 Field Office Type C 1 EACH $5,200.0000 $5,200.00 $5,000.0000 $5,000.00
643.0300 Traffic Control Drums 10,741 DAY $0.5000 $5,370.50 $0.5000 $5,370.50
643.0420 Traffic Control Barricades Type III 614 DAY $2.0000 $1,228.00 $2.0000 $1,228.00
643.0705 Traffic Control Warning Lights Type A 1,128 DAY $0.1000 $112.80 $0.1100 $124.08
643.0715 Traffic Control Warning Lights Type C 1,100 DAY $0.1500 $165.00 $0.1300 $143.00
643.0810 Traffic Control Connected Arrow Boards 55 DAY $20.5000 $1,127.50 $20.0000 $1,100.00
643.0900 Traffic Control Signs 8,867 DAY $0.7500 $6,650.25 $0.7500 $6,650.25
643.0920 Traffic Control Covering Signs Type II 1 EACH $40.7500 $40.75 $40.0000 $40.00
643.1050 Traffic Control Signs PCMS 124 DAY $61.0000 $7,564.00 $60.0000 $7,440.00
643.3180 Temporary Marking Line Removable Tape 6-Inch 725 LF $3.1000 $2,247.50 $3.0000 $2,175.00
643.3960 Temporary Marking Removable Mask Out Tape 6-Inch 625 LF $3.3000 $2,062.50 $3.2500 $2,031.25
643.3990 Temporary Marking Removable Mask Out Tape 12-Inch 100 LF $6.6000 $660.00 $6.5000 $650.00
643.5000 Traffic Control 1 EACH $13,300.0000 $13,300.00 $13,000.0000 $13,000.00
646.2020 Marking Line Epoxy 6-Inch 1,320 LF $2.0000 $2,640.00 $1.5000 $1,980.00
646.4020 Marking Line Epoxy 10-Inch 935 LF $3.7000 $3,459.50 $3.0000 $2,805.00
646.5020 Marking Arrow Epoxy 4 EACH $260.0000 $1,040.00 $230.0000 $920.00
646.5120 Marking Word Epoxy 2 EACH $360.0000 $720.00 $250.0000 $500.00
646.6120 Marking Stop Line Epoxy 18-Inch 226 LF $14.7500 $3,333.50 $13.0000 $2,938.00
646.7320 Marking Chevron Epoxy 12-Inch 82 LF $13.2500 $1,086.50 $9.7500 $799.50
646.8220 Marking Island Nose Epoxy 3 EACH $350.0000 $1,050.00 $300.0000 $900.00
646.9200 Marking Removal Line Wide 79 LF $8.5000 $671.50 $8.3000 $655.70
650.4000 Construction Staking Storm Sewer 1 EACH $500.0000 $500.00 $1.0000 $1.00
650.5000 Construction Staking Base 728 LF $0.0100 $7.28 $0.0100 $7.28
650.5500 Construction Staking Curb Gutter and Curb & Gutter 304 LF $2.0000 $608.00 $1.0000 $304.00
650.8000 Construction Staking Resurfacing Reference 728 LF $0.5000 $364.00 $0.0300 $21.84
650.9500 Construction Staking Sidewalk (project) 01. 5755-00-73 1 EACH $3,000.0000 $3,000.00 $1,000.0000 $1,000.00
650.9911 Construction Staking Supplemental Control (project) 01. 5755-00-73 1 EACH $1,250.0000 $1,250.00 $4,000.0000 $4,000.00
652.0225 Conduit Rigid Nonmetallic Schedule 40 2-Inch 40 LF $6.5000 $260.00 $6.3900 $255.60
652.0235 Conduit Rigid Nonmetallic Schedule 40 3-Inch 115 LF $8.5000 $977.50 $8.3200 $956.80
652.0605 Conduit Special 2-Inch 131 LF $16.7500 $2,194.25 $16.4400 $2,153.64
652.0615 Conduit Special 3-Inch 854 LF $25.0000 $21,350.00 $24.4000 $20,837.60
652.0700.S Install Conduit into Existing Item 4 EACH $250.0000 $1,000.00 $249.7100 $998.84
653.0140 Pull Boxes Steel 24x42-Inch 7 EACH $1,300.0000 $9,100.00 $1,237.2400 $8,660.68
653.0905 Removing Pull Boxes 15 EACH $110.0000 $1,650.00 $112.3500 $1,685.25
654.0101 Concrete Bases Type 1 4 EACH $910.0000 $3,640.00 $895.2900 $3,581.16
654.0120 Concrete Bases Type 10-Special 4 EACH $9,800.0000 $39,200.00 $9,621.4600 $38,485.84
654.0217 Concrete Control Cabinet Bases Type 9 Special 1 EACH $2,800.0000 $2,800.00 $2,793.0700 $2,793.07
655.0230 Cable Traffic Signal 5-14 AWG 744 LF $1.5000 $1,116.00 $1.5100 $1,123.44
655.0260 Cable Traffic Signal 12-14 AWG 1,705 LF $2.9000 $4,944.50 $2.8800 $4,910.40
655.0515 Electrical Wire Traffic Signals 10 AWG 1,436 LF $1.1000 $1,579.60 $1.0900 $1,565.24
655.0900 Traffic Signal EVP Detector Cable 688 LF $1.4000 $963.20 $1.3200 $908.16
656.0201 Electrical Service Meter Breaker Pedestal (location) 01. CTH Q & CTH D 1 EACH $1,800.0000 $1,800.00 $1,717.3200 $1,717.32
657.0100 Pedestal Bases 4 EACH $340.0000 $1,360.00 $331.7200 $1,326.88
657.0347 Poles Type 9-Special 4 EACH $13,300.0000 $53,200.00 $13,055.9300 $52,223.72
657.0420 Traffic Signal Standards Aluminum 13-FT 2 EACH $970.0000 $1,940.00 $950.0900 $1,900.18
657.0425 Traffic Signal Standards Aluminum 15-FT 2 EACH $1,000.0000 $2,000.00 $1,006.2100 $2,012.42
657.0536 Monotube Arms 35-FT-Special 2 EACH $5,800.0000 $11,600.00 $5,707.7100 $11,415.42
657.0541 Monotube Arms 40-FT-Special 1 EACH $6,000.0000 $6,000.00 $5,844.8900 $5,844.89
657.0546 Monotube Arms 45-FT-Special 1 EACH $6,400.0000 $6,400.00 $6,247.9900 $6,247.99
658.0173 Traffic Signal Face 3S 12-Inch 16 EACH $830.0000 $13,280.00 $818.2900 $13,092.64
658.0174 Traffic Signal Face 4S 12-Inch 4 EACH $1,100.0000 $4,400.00 $1,056.8600 $4,227.44
658.5070 Signal Mounting Hardware (location) 01. CTH Q & CTH D 1 EACH $6,600.0000 $6,600.00 $6,468.8000 $6,468.80
659.5000.S Lamp, Ballast, LED, Switch Disposal by Contractor 14 EACH $38.2500 $535.50 $37.4400 $524.16
661.0201 Temporary Traffic Signals for Intersections (location) 01. CTH Q & CTH D 1 EACH $28,700.0000 $28,700.00 $28,164.7200 $28,164.72
680.0100 Public Land Reference Monument Verify and Reset 1 EACH $1,150.0000 $1,150.00 $500.0000 $500.00
690.0150 Sawing Asphalt 1,380 LF $1.4000 $1,932.00 $1.1300 $1,559.40
690.0250 Sawing Concrete 8 LF $10.0000 $80.00 $5.0100 $40.08
ASP.1T0A On-the-Job Training Apprentice at $5.00/HR 1,200 HRS $5.0000 $6,000.00 $5.0000 $6,000.00
ASP.1T0G On-the-Job Training Graduate at $5.00/HR 600 HRS $5.0000 $3,000.00 $5.0000 $3,000.00
SPV.0060 Special 05. Emergency Vehicle Preemption (CTH Q & CTH D) 8 EACH $19,478.0000 $99,460.00 $19,077.3760 $97,036.88

Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.

Want the analysis, not just the numbers? DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel. Explore DOTestimate →