WI
Wisconsin DOT · Bid Tabulation
Contract 20260414016
V Germantown-Fond Du Lac Avenue; Intersection With Cth G
- County
- Washington
- Letting
- April 14, 2026
- Bidders
- 6
Apparent low bid
MUSSON BROS., INC.
$1,785,040.68
Other bidders
SUPER WESTERN, INC.
$1,787,199.69
MASHUDA CONTRACTORS, INC.
$1,792,029.00
JAMES PETERSON SONS, INC.
$1,899,893.34
VINTON CONSTRUCTION COMPANY
$1,919,191.19
ZIGNEGO COMPANY, INC.
$1,953,134.12
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | MUSSON BROS., INC. $1,785,040.68 | SUPER WESTERN, INC. $1,787,199.69 | MASHUDA CONTRACTORS, INC. $1,792,029.00 | JAMES PETERSON SONS, INC. $1,899,893.34 | VINTON CONSTRUCTION COMPANY $1,919,191.19 | ZIGNEGO COMPANY, INC. $1,953,134.12 | ||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201.0205 | Grubbing | 5 | STA | $707.0000 | $3,535.00 | $718.8500 | $3,594.25 | $675.0000 | $3,375.00 | $675.0000 | $3,375.00 | $300.0000 | $1,500.00 | $300.0000 | $1,500.00 |
| 203.0100 | Removing Small Pipe Culverts | 7 | EACH | $447.2800 | $3,130.96 | $500.0000 | $3,500.00 | $435.0000 | $3,045.00 | $675.0000 | $4,725.00 | $660.0000 | $4,620.00 | $435.0000 | $3,045.00 |
| 204.0100 | Removing Concrete Pavement | 3,660 | SY | $0.0100 | $36.60 | $1.1200 | $4,099.20 | $1.0000 | $3,660.00 | $1.0000 | $3,660.00 | $2.0000 | $7,320.00 | $1.0000 | $3,660.00 |
| 204.0150 | Removing Curb & Gutter | 70 | LF | $5.2700 | $368.90 | $6.6900 | $468.30 | $4.0000 | $280.00 | $10.0000 | $700.00 | $10.0000 | $700.00 | $4.0000 | $280.00 |
| 204.0210 | Removing Manholes | 1 | EACH | $554.4500 | $554.45 | $600.0000 | $600.00 | $500.0000 | $500.00 | $500.0000 | $500.00 | $715.0000 | $715.00 | $500.0000 | $500.00 |
| 204.0245 | Removing Storm Sewer (size) 02. 24-Inch By 24-Inch | 80 | LF | $16.4750 | $1,344.10 | $35.0000 | $3,200.00 | $30.0000 | $2,500.00 | $25.0000 | $2,000.00 | $18.0700 | $1,404.20 | $30.0000 | $2,500.00 |
| 205.0100 | Excavation Common | 12,800 | CY | $10.3100 | $131,968.00 | $12.3600 | $158,208.00 | $9.0000 | $115,200.00 | $16.6700 | $213,376.00 | $15.4000 | $197,120.00 | $9.0000 | $115,200.00 |
| 205.0200 | Excavation Rock | 200 | CY | $0.0100 | $2.00 | $10.0000 | $2,000.00 | $65.0000 | $13,000.00 | $10.0000 | $2,000.00 | $0.0100 | $2.00 | $65.0000 | $13,000.00 |
| 213.0100 | Finishing Roadway (project) 01. 2475-04-71 | 1 | EACH | $750.0000 | $750.00 | $1,500.0000 | $1,500.00 | $125.0000 | $125.00 | $2,000.0000 | $2,000.00 | $4,000.0000 | $4,000.00 | $1,000.0000 | $1,000.00 |
| 305.0110 | Base Aggregate Dense 3/4-Inch | 310 | TON | $25.0100 | $7,753.10 | $22.5100 | $6,978.10 | $33.7600 | $10,465.60 | $34.6500 | $10,741.50 | $44.6000 | $13,826.00 | $33.7600 | $10,465.60 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 11,530 | TON | $17.1200 | $197,393.60 | $15.8400 | $182,635.20 | $17.6400 | $203,389.20 | $18.6500 | $215,034.50 | $14.9600 | $172,488.80 | $17.6400 | $203,389.20 |
| 310.0110 | Base Aggregate Open-Graded | 102 | TON | $30.2500 | $3,085.50 | $30.7800 | $3,139.56 | $37.5000 | $3,825.00 | $28.1200 | $2,868.24 | $52.0000 | $5,304.00 | $37.5000 | $3,825.00 |
| 313.0110 | Pit Run | 11,300 | TON | $15.9900 | $180,687.00 | $14.1000 | $159,330.00 | $17.5700 | $198,541.00 | $17.2900 | $195,377.00 | $15.1000 | $170,630.00 | $17.5700 | $198,541.00 |
| 405.0100 | Coloring Concrete WisDOT Red | 160 | CY | $116.7500 | $18,680.00 | $116.7500 | $18,680.00 | $116.7500 | $18,680.00 | $116.7500 | $18,680.00 | $116.7500 | $18,680.00 | $100.0000 | $16,000.00 |
| 415.2010 | Concrete Truck Apron 12-Inch | 460 | SY | $108.0000 | $49,680.00 | $108.0000 | $49,680.00 | $108.0000 | $49,680.00 | $108.0000 | $49,680.00 | $108.0000 | $49,680.00 | $120.0000 | $55,200.00 |
| 455.0605 | Tack Coat | 1,460 | GAL | $3.0000 | $4,380.00 | $3.0000 | $4,380.00 | $3.0000 | $4,380.00 | $3.0000 | $4,380.00 | $3.0000 | $4,380.00 | $3.0000 | $4,380.00 |
| 460.2000 | Incentive Density HMA Pavement | 2,130 | DOL | $1.0000 | $2,130.00 | $1.0000 | $2,130.00 | $1.0000 | $2,130.00 | $1.0000 | $2,130.00 | $1.0000 | $2,130.00 | $1.0000 | $2,130.00 |
| 460.6223 | HMA Pavement 3 MT 58-28 S | 2,910 | TON | $70.3500 | $204,718.50 | $70.3500 | $204,718.50 | $70.3500 | $204,718.50 | $70.3500 | $204,718.50 | $70.3500 | $204,718.50 | $70.3500 | $204,718.50 |
| 460.6424 | HMA Pavement 4 MT 58-28 H | 1,020 | TON | $74.6500 | $76,143.00 | $74.6500 | $76,143.00 | $74.6500 | $76,143.00 | $74.6500 | $76,143.00 | $74.6500 | $76,143.00 | $74.6500 | $76,143.00 |
| 465.0120 | Asphaltic Surface Driveways and Field Entrances | 90 | TON | $142.4500 | $12,820.50 | $142.4500 | $12,820.50 | $142.4500 | $12,820.50 | $142.4500 | $12,820.50 | $142.4500 | $12,820.50 | $142.4500 | $12,820.50 |
| 465.0315 | Asphaltic Flumes | 70 | SY | $52.1000 | $3,647.00 | $52.1000 | $3,647.00 | $52.1000 | $3,647.00 | $52.1000 | $3,647.00 | $52.1000 | $3,647.00 | $52.1000 | $3,647.00 |
| 520.1015 | Apron Endwalls for Culvert Pipe 15-Inch | 2 | EACH | $420.1200 | $840.24 | $639.0000 | $1,278.00 | $427.0000 | $854.00 | $385.0000 | $770.00 | $340.0000 | $680.00 | $427.0000 | $854.00 |
| 520.1018 | Apron Endwalls for Culvert Pipe 18-Inch | 10 | EACH | $473.8500 | $4,738.50 | $737.0000 | $7,370.00 | $470.0000 | $4,700.00 | $480.0000 | $4,800.00 | $482.0000 | $4,820.00 | $470.0000 | $4,700.00 |
| 520.3315 | Culvert Pipe Class III-A 15-Inch | 36 | LF | $62.0400 | $2,233.44 | $79.0000 | $2,844.00 | $50.5000 | $1,818.00 | $62.0000 | $2,232.00 | $65.9500 | $2,374.20 | $50.5000 | $1,818.00 |
| 520.3318 | Culvert Pipe Class III-A 18-Inch | 134 | LF | $68.0500 | $9,118.70 | $87.0000 | $11,658.00 | $57.0000 | $7,638.00 | $74.0000 | $9,916.00 | $72.3500 | $9,694.90 | $57.0000 | $7,638.00 |
| 522.1018 | Apron Endwalls for Culvert Pipe Reinforced Concrete 18-Inch | 3 | EACH | $1,554.8100 | $4,664.43 | $1,922.0000 | $5,766.00 | $1,055.0000 | $3,165.00 | $1,500.0000 | $4,500.00 | $1,329.0000 | $3,987.00 | $1,055.0000 | $3,165.00 |
| 522.1024 | Apron Endwalls for Culvert Pipe Reinforced Concrete 24-Inch | 2 | EACH | $1,814.4300 | $3,628.86 | $2,597.0000 | $5,194.00 | $1,227.0000 | $2,454.00 | $1,750.0000 | $3,500.00 | $1,574.0000 | $3,148.00 | $1,227.0000 | $2,454.00 |
| 522.2624 | Apron Endwalls for Culvert Pipe Reinforced Concrete Horizontal Elliptical 24x38-Inch | 2 | EACH | $2,477.6200 | $4,955.24 | $3,466.0000 | $6,932.00 | $1,708.0000 | $3,416.00 | $2,350.0000 | $4,700.00 | $2,160.0000 | $4,320.00 | $1,708.0000 | $3,416.00 |
| 601.0405 | Concrete Curb & Gutter 18-Inch Type A | 240 | LF | $26.1500 | $6,276.00 | $26.1500 | $6,276.00 | $26.1500 | $6,276.00 | $26.1500 | $6,276.00 | $26.1500 | $6,276.00 | $34.1800 | $8,203.20 |
| 601.0411 | Concrete Curb & Gutter 30-Inch Type D | 1,310 | LF | $25.0000 | $32,750.00 | $25.0000 | $32,750.00 | $25.0000 | $32,750.00 | $25.0000 | $32,750.00 | $25.0000 | $32,750.00 | $39.0000 | $51,090.00 |
| 601.0551 | Concrete Curb & Gutter 4-Inch Sloped 36-Inch Type A | 110 | LF | $24.1500 | $2,656.50 | $24.1500 | $2,656.50 | $24.1500 | $2,656.50 | $24.1500 | $2,656.50 | $24.1500 | $2,656.50 | $47.1800 | $5,189.80 |
| 601.0553 | Concrete Curb & Gutter 4-Inch Sloped 36-Inch Type D | 2,880 | LF | $22.3500 | $64,368.00 | $22.3500 | $64,368.00 | $22.3500 | $64,368.00 | $22.3500 | $64,368.00 | $22.3500 | $64,368.00 | $42.1800 | $121,478.40 |
| 601.0581 | Concrete Curb & Gutter 4-Inch Sloped 30-Inch Type R | 340 | LF | $31.0000 | $10,540.00 | $31.0000 | $10,540.00 | $31.0000 | $10,540.00 | $31.0000 | $10,540.00 | $31.0000 | $10,540.00 | $39.0000 | $13,260.00 |
| 602.0405 | Concrete Sidewalk 4-Inch | 5,540 | SF | $5.0000 | $27,700.00 | $5.0000 | $27,700.00 | $5.0000 | $27,700.00 | $5.0000 | $27,700.00 | $5.3500 | $29,639.00 | $7.7000 | $42,658.00 |
| 606.0100 | Riprap Light | 22 | CY | $151.1100 | $3,324.42 | $125.0000 | $2,750.00 | $140.0000 | $3,080.00 | $140.0000 | $3,080.00 | $150.0000 | $3,300.00 | $140.0000 | $3,080.00 |
| 606.0200 | Riprap Medium | 16 | CY | $163.3600 | $2,613.76 | $125.0000 | $2,000.00 | $140.0000 | $2,240.00 | $160.0000 | $2,560.00 | $150.0000 | $2,400.00 | $140.0000 | $2,240.00 |
| 608.0005 | Storm Sewer Rock Excavation | 70 | CY | $61.5100 | $4,305.70 | $20.0000 | $1,400.00 | $80.0000 | $5,600.00 | $10.0000 | $700.00 | $117.0000 | $8,190.00 | $80.0000 | $5,600.00 |
| 608.0412 | Storm Sewer Pipe Reinforced Concrete Class IV 12-Inch | 190 | LF | $95.9400 | $18,228.60 | $86.0000 | $16,340.00 | $74.0000 | $14,060.00 | $85.0000 | $16,150.00 | $70.8500 | $13,461.50 | $74.0000 | $14,060.00 |
| 608.0418 | Storm Sewer Pipe Reinforced Concrete Class IV 18-Inch | 441 | LF | $91.9800 | $40,563.18 | $91.0000 | $40,131.00 | $83.0000 | $36,603.00 | $83.0000 | $36,603.00 | $75.7000 | $33,383.70 | $83.0000 | $36,603.00 |
| 608.0424 | Storm Sewer Pipe Reinforced Concrete Class IV 24-Inch | 415 | LF | $116.0300 | $48,152.45 | $126.0000 | $52,290.00 | $109.2500 | $45,338.75 | $120.0000 | $49,800.00 | $108.4000 | $44,986.00 | $109.2500 | $45,338.75 |
| 608.2424 | Storm Sewer Pipe Reinforced Concrete Horizontal Elliptical Class HE-IV 24x38-Inch | 98 | LF | $243.1500 | $23,828.70 | $226.0000 | $22,148.00 | $209.0000 | $20,482.00 | $216.0000 | $21,168.00 | $202.2000 | $19,815.60 | $209.0000 | $20,482.00 |
| 611.0530 | Manhole Covers Type J | 2 | EACH | $1,058.1300 | $2,116.26 | $794.0000 | $1,588.00 | $755.0000 | $1,510.00 | $525.0000 | $1,050.00 | $541.0000 | $1,082.00 | $755.0000 | $1,510.00 |
| 611.0624 | Inlet Covers Type H | 7 | EACH | $1,629.8400 | $11,408.88 | $1,030.0000 | $7,210.00 | $1,005.0000 | $7,035.00 | $770.0000 | $5,390.00 | $776.0000 | $5,432.00 | $1,005.0000 | $7,035.00 |
| 611.0627 | Inlet Covers Type HM | 5 | EACH | $1,629.8400 | $8,149.20 | $1,030.0000 | $5,150.00 | $1,005.0000 | $5,025.00 | $770.0000 | $3,850.00 | $776.0000 | $3,880.00 | $1,005.0000 | $5,025.00 |
| 611.0636 | Inlet Covers Type HM-S | 1 | EACH | $1,629.8400 | $1,629.84 | $1,030.0000 | $1,030.00 | $1,005.0000 | $1,005.00 | $770.0000 | $770.00 | $776.0000 | $776.00 | $1,005.0000 | $1,005.00 |
| 611.0639 | Inlet Covers Type H-S | 3 | EACH | $1,629.8400 | $4,889.52 | $1,030.0000 | $3,090.00 | $1,005.0000 | $3,015.00 | $770.0000 | $2,310.00 | $776.0000 | $2,328.00 | $1,005.0000 | $3,015.00 |
| 611.0642 | Inlet Covers Type MS | 1 | EACH | $760.5600 | $760.56 | $803.0000 | $803.00 | $675.0000 | $675.00 | $525.0000 | $525.00 | $550.0000 | $550.00 | $675.0000 | $675.00 |
| 611.0652 | Inlet Covers Type T | 3 | EACH | $1,943.2900 | $5,829.87 | $1,397.0000 | $4,191.00 | $1,280.0000 | $3,840.00 | $1,000.0000 | $3,000.00 | $1,043.0000 | $3,129.00 | $1,280.0000 | $3,840.00 |
| 611.1004 | Catch Basins 4-FT Diameter | 1 | EACH | $2,621.6100 | $2,621.61 | $2,656.0000 | $2,656.00 | $3,356.0000 | $3,356.00 | $3,425.0000 | $3,425.00 | $3,972.0000 | $3,972.00 | $3,356.0000 | $3,356.00 |
| 611.2005 | Manholes 5-FT Diameter | 5 | EACH | $3,838.2700 | $19,191.35 | $4,681.0000 | $23,405.00 | $4,154.0000 | $20,770.00 | $4,750.0000 | $23,750.00 | $5,512.0000 | $27,560.00 | $4,154.0000 | $20,770.00 |
| 611.2006 | Manholes 6-FT Diameter | 2 | EACH | $5,333.8300 | $10,667.66 | $5,806.0000 | $11,612.00 | $5,267.0000 | $10,534.00 | $6,300.0000 | $12,600.00 | $6,602.0000 | $13,204.00 | $5,267.0000 | $10,534.00 |
| 611.3004 | Inlets 4-FT Diameter | 4 | EACH | $2,415.4300 | $9,661.72 | $2,583.0000 | $10,332.00 | $2,572.0000 | $10,288.00 | $3,100.0000 | $12,400.00 | $3,977.0000 | $15,908.00 | $2,572.0000 | $10,288.00 |
| 611.3225 | Inlets 2x2.5-FT | 2 | EACH | $1,423.2500 | $2,846.50 | $2,126.0000 | $4,252.00 | $1,761.0000 | $3,522.00 | $2,350.0000 | $4,700.00 | $2,469.0000 | $4,938.00 | $1,761.0000 | $3,522.00 |
| 611.3230 | Inlets 2x3-FT | 7 | EACH | $1,647.3700 | $11,531.59 | $2,177.0000 | $15,239.00 | $1,969.0000 | $13,783.00 | $2,250.0000 | $15,750.00 | $2,648.0000 | $18,536.00 | $1,969.0000 | $13,783.00 |
| 611.3901 | Inlets Median 1 Grate | 1 | EACH | $2,712.7800 | $2,712.78 | $2,337.0000 | $2,337.00 | $2,790.0000 | $2,790.00 | $2,800.0000 | $2,800.00 | $3,188.0000 | $3,188.00 | $2,790.0000 | $2,790.00 |
| 612.0106 | Pipe Underdrain 6-Inch | 3,030 | LF | $5.0000 | $15,150.00 | $10.7400 | $32,542.20 | $12.5000 | $37,875.00 | $10.0000 | $30,300.00 | $16.3000 | $49,389.00 | $12.5000 | $37,875.00 |
| 612.0206 | Pipe Underdrain Unperforated 6-Inch | 120 | LF | $19.3900 | $2,326.80 | $22.2100 | $2,665.20 | $24.5000 | $2,940.00 | $25.0000 | $3,000.00 | $34.0000 | $4,080.00 | $24.5000 | $2,940.00 |
| 612.0806 | Apron Endwalls for Underdrain Reinforced Concrete 6-Inch | 3 | EACH | $268.0900 | $804.27 | $588.1200 | $1,764.36 | $350.0000 | $1,050.00 | $350.0000 | $1,050.00 | $285.0000 | $855.00 | $350.0000 | $1,050.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 01. 2475-04-71 | 1 | EACH | $1.0000 | $1.00 | $1.0000 | $1.00 | $100.0000 | $100.00 | $100.0000 | $100.00 | $0.0100 | $0.01 | $1.0000 | $1.00 |
| 619.1000 | Mobilization | 1 | EACH | $123,798.2600 | $123,798.26 | $66,889.3400 | $66,889.34 | $107,000.0000 | $107,000.00 | $58,650.0000 | $58,650.00 | $128,696.9600 | $128,696.96 | $151,000.0000 | $151,000.00 |
| 620.0300 | Concrete Median Sloped Nose | 680 | SF | $18.5000 | $12,580.00 | $18.5000 | $12,580.00 | $18.5000 | $12,580.00 | $18.5000 | $12,580.00 | $18.5000 | $12,580.00 | $40.0000 | $27,200.00 |
| 624.0100 | Water | 180 | MGAL | $0.0100 | $1.80 | $19.4800 | $3,506.40 | $40.0000 | $7,200.00 | $10.0000 | $1,800.00 | $0.0100 | $1.80 | $40.0000 | $7,200.00 |
| 625.0100 | Topsoil | 11,530 | SY | $0.6700 | $7,725.10 | $3.2100 | $37,011.30 | $0.0100 | $115.30 | $4.2500 | $49,002.50 | $4.5000 | $51,885.00 | $0.3100 | $3,574.30 |
| 628.1504 | Silt Fence | 2,190 | LF | $1.7100 | $3,744.90 | $1.7100 | $3,744.90 | $1.7100 | $3,744.90 | $1.7100 | $3,744.90 | $1.9000 | $4,161.00 | $1.9000 | $4,161.00 |
| 628.1520 | Silt Fence Maintenance | 2,190 | LF | $0.0500 | $109.50 | $0.0500 | $109.50 | $0.0500 | $109.50 | $0.0500 | $109.50 | $0.0100 | $21.90 | $0.0100 | $21.90 |
| 628.1905 | Mobilizations Erosion Control | 9 | EACH | $175.0000 | $1,575.00 | $175.0000 | $1,575.00 | $175.0000 | $1,575.00 | $175.0000 | $1,575.00 | $50.0000 | $450.00 | $50.0000 | $450.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 4 | EACH | $75.0000 | $300.00 | $75.0000 | $300.00 | $75.0000 | $300.00 | $75.0000 | $300.00 | $50.0000 | $200.00 | $50.0000 | $200.00 |
| 628.2002 | Erosion Mat Class I Type A | 550 | SY | $1.4000 | $770.00 | $1.4000 | $770.00 | $1.4000 | $770.00 | $1.4000 | $770.00 | $1.0000 | $550.00 | $1.0000 | $550.00 |
| 628.2004 | Erosion Mat Class I Type B | 5,260 | SY | $1.1000 | $5,786.00 | $1.1000 | $5,786.00 | $1.1000 | $5,786.00 | $1.1000 | $5,786.00 | $0.9000 | $4,734.00 | $0.9000 | $4,734.00 |
| 628.2008 | Erosion Mat Urban Class I Type B | 5,710 | SY | $1.7500 | $9,992.50 | $1.7500 | $9,992.50 | $1.7500 | $9,992.50 | $1.7500 | $9,992.50 | $1.8900 | $10,791.90 | $1.8900 | $10,791.90 |
| 628.7005 | Inlet Protection Type A | 1 | EACH | $100.0000 | $100.00 | $100.0000 | $100.00 | $100.0000 | $100.00 | $100.0000 | $100.00 | $50.0000 | $50.00 | $50.0000 | $50.00 |
| 628.7010 | Inlet Protection Type B | 1 | EACH | $40.0000 | $40.00 | $40.0000 | $40.00 | $40.0000 | $40.00 | $40.0000 | $40.00 | $50.0000 | $50.00 | $50.0000 | $50.00 |
| 628.7015 | Inlet Protection Type C | 13 | EACH | $38.1000 | $495.30 | $38.1000 | $495.30 | $38.1000 | $495.30 | $38.1000 | $495.30 | $70.0000 | $910.00 | $70.0000 | $910.00 |
| 628.7020 | Inlet Protection Type D | 12 | EACH | $67.9000 | $814.80 | $67.9000 | $814.80 | $67.9000 | $814.80 | $67.9000 | $814.80 | $100.0000 | $1,200.00 | $100.0000 | $1,200.00 |
| 628.7504 | Temporary Ditch Checks | 280 | LF | $8.0000 | $2,240.00 | $8.0000 | $2,240.00 | $8.0000 | $2,240.00 | $8.0000 | $2,240.00 | $7.0000 | $1,960.00 | $7.0000 | $1,960.00 |
| 628.7555 | Culvert Pipe Checks | 26 | EACH | $28.1000 | $730.60 | $28.1000 | $730.60 | $28.1000 | $730.60 | $28.1000 | $730.60 | $20.0000 | $520.00 | $20.0000 | $520.00 |
| 628.7570 | Rock Bags | 40 | EACH | $8.9000 | $356.00 | $8.9000 | $356.00 | $8.9000 | $356.00 | $8.9000 | $356.00 | $10.0000 | $400.00 | $10.0000 | $400.00 |
| 629.0210 | Fertilizer Type B | 7 | CWT | $74.5000 | $521.50 | $74.5000 | $521.50 | $74.5000 | $521.50 | $74.5000 | $521.50 | $80.0000 | $560.00 | $80.0000 | $560.00 |
| 630.0140 | Seeding Mixture No. 40 | 490 | LB | $8.9900 | $4,405.10 | $8.9900 | $4,405.10 | $8.9900 | $4,405.10 | $8.9900 | $4,405.10 | $7.5000 | $3,675.00 | $7.5000 | $3,675.00 |
| 630.0500 | Seed Water | 263 | MGAL | $12.5000 | $3,287.50 | $12.5000 | $3,287.50 | $12.5000 | $3,287.50 | $12.5000 | $3,287.50 | $5.0000 | $1,315.00 | $5.0000 | $1,315.00 |
| 634.0612 | Posts Wood 4x6-Inch X 12-FT | 7 | EACH | $69.7500 | $488.25 | $69.7500 | $488.25 | $69.7500 | $488.25 | $69.7500 | $488.25 | $100.0000 | $700.00 | $100.0000 | $700.00 |
| 634.0614 | Posts Wood 4x6-Inch X 14-FT | 23 | EACH | $72.1000 | $1,658.30 | $72.1000 | $1,658.30 | $72.1000 | $1,658.30 | $72.1000 | $1,658.30 | $100.0000 | $2,300.00 | $100.0000 | $2,300.00 |
| 634.0616 | Posts Wood 4x6-Inch X 16-FT | 17 | EACH | $74.5000 | $1,266.50 | $74.5000 | $1,266.50 | $74.5000 | $1,266.50 | $74.5000 | $1,266.50 | $100.0000 | $1,700.00 | $100.0000 | $1,700.00 |
| 634.0620 | Posts Wood 4x6-Inch X 20-FT | 9 | EACH | $86.1000 | $774.90 | $86.1000 | $774.90 | $86.1000 | $774.90 | $86.1000 | $774.90 | $150.0000 | $1,350.00 | $150.0000 | $1,350.00 |
| 634.0622 | Posts Wood 4x6-Inch X 22-FT | 3 | EACH | $86.0000 | $258.00 | $86.0000 | $258.00 | $86.0000 | $258.00 | $86.0000 | $258.00 | $150.0000 | $450.00 | $150.0000 | $450.00 |
| 634.0812 | Posts Tubular Steel 2x2-Inch X 12-FT | 4 | EACH | $140.0000 | $560.00 | $140.0000 | $560.00 | $140.0000 | $560.00 | $140.0000 | $560.00 | $200.0000 | $800.00 | $200.0000 | $800.00 |
| 634.0814 | Posts Tubular Steel 2x2-Inch X 14-FT | 6 | EACH | $195.0000 | $1,170.00 | $195.0000 | $1,170.00 | $195.0000 | $1,170.00 | $195.0000 | $1,170.00 | $200.0000 | $1,200.00 | $200.0000 | $1,200.00 |
| 637.2210 | Signs Type II Reflective H | 523.42 | SF | $20.1000 | $10,520.74 | $20.1000 | $10,520.74 | $20.1000 | $10,520.74 | $20.1000 | $10,520.74 | $20.5000 | $10,730.11 | $20.5000 | $10,730.11 |
| 637.2230 | Signs Type II Reflective F | 97.75 | SF | $26.9000 | $2,629.48 | $26.9000 | $2,629.48 | $26.9000 | $2,629.48 | $26.9000 | $2,629.48 | $22.5000 | $2,199.38 | $22.5000 | $2,199.38 |
| 638.2602 | Removing Signs Type II | 30 | EACH | $18.7500 | $562.50 | $18.7500 | $562.50 | $18.7500 | $562.50 | $18.7500 | $562.50 | $20.0000 | $600.00 | $20.0000 | $600.00 |
| 638.3000 | Removing Small Sign Supports | 26 | EACH | $18.7500 | $487.50 | $18.7500 | $487.50 | $18.7500 | $487.50 | $18.7500 | $487.50 | $15.0000 | $390.00 | $15.0000 | $390.00 |
| 642.5001 | Field Office Type B | 1 | EACH | $9,500.0000 | $9,500.00 | $14,100.8800 | $14,100.88 | $18,000.0000 | $18,000.00 | $18,000.0000 | $18,000.00 | $12,500.0000 | $12,500.00 | $20,000.0000 | $20,000.00 |
| 643.0300 | Traffic Control Drums | 1,600 | DAY | $0.5100 | $816.00 | $0.5000 | $800.00 | $0.2500 | $400.00 | $0.5000 | $800.00 | $0.5000 | $800.00 | $0.2500 | $400.00 |
| 643.0420 | Traffic Control Barricades Type III | 3,360 | DAY | $0.7600 | $2,553.60 | $0.7500 | $2,520.00 | $1.0000 | $3,360.00 | $0.7500 | $2,520.00 | $0.7500 | $2,520.00 | $1.0000 | $3,360.00 |
| 643.0705 | Traffic Control Warning Lights Type A | 4,160 | DAY | $0.2500 | $1,040.00 | $0.2500 | $1,040.00 | $0.0700 | $291.20 | $0.2500 | $1,040.00 | $0.2500 | $1,040.00 | $0.0700 | $291.20 |
| 643.0715 | Traffic Control Warning Lights Type C | 1,600 | DAY | $0.2500 | $400.00 | $0.2500 | $400.00 | $0.1000 | $160.00 | $0.2500 | $400.00 | $0.2500 | $400.00 | $0.1000 | $160.00 |
| 643.0900 | Traffic Control Signs | 22,640 | DAY | $0.2000 | $4,528.00 | $0.2000 | $4,528.00 | $0.3000 | $6,792.00 | $0.2000 | $4,528.00 | $0.2000 | $4,528.00 | $0.3000 | $6,792.00 |
| 643.0920 | Traffic Control Covering Signs Type II | 25 | EACH | $50.5000 | $1,262.50 | $50.0000 | $1,250.00 | $35.0000 | $875.00 | $50.0000 | $1,250.00 | $50.0000 | $1,250.00 | $35.0000 | $875.00 |
| 643.1050 | Traffic Control Signs PCMS | 28 | DAY | $50.5000 | $1,414.00 | $50.0000 | $1,400.00 | $39.0000 | $1,092.00 | $50.0000 | $1,400.00 | $50.0000 | $1,400.00 | $39.0000 | $1,092.00 |
| 643.5000 | Traffic Control | 1 | EACH | $21,134.2500 | $21,134.25 | $20,925.0000 | $20,925.00 | $6,750.0000 | $6,750.00 | $20,925.0000 | $20,925.00 | $20,925.0000 | $20,925.00 | $6,750.0000 | $6,750.00 |
| 645.0111 | Geotextile Type DF Schedule A | 1,300 | SY | $2.4000 | $3,120.00 | $3.6200 | $4,706.00 | $3.2500 | $4,225.00 | $3.5000 | $4,550.00 | $4.6000 | $5,980.00 | $3.2500 | $4,225.00 |
| 645.0120 | Geotextile Type HR | 72 | SY | $5.5300 | $398.16 | $6.0000 | $432.00 | $17.5000 | $1,260.00 | $10.0000 | $720.00 | $5.0000 | $360.00 | $17.5000 | $1,260.00 |
| 645.0130 | Geotextile Type R | 90 | SY | $5.9500 | $535.50 | $6.0000 | $540.00 | $11.5000 | $1,035.00 | $8.0000 | $720.00 | $5.0000 | $450.00 | $11.5000 | $1,035.00 |
| 645.0220 | Geogrid Type SR | 15,000 | SY | $1.7000 | $25,500.00 | $1.5300 | $22,950.00 | $1.3500 | $20,250.00 | $1.5000 | $22,500.00 | $1.7000 | $25,500.00 | $1.3500 | $20,250.00 |
| 646.1020 | Marking Line Epoxy 4-Inch | 3,680 | LF | $0.5100 | $1,876.80 | $0.5000 | $1,840.00 | $0.9000 | $3,312.00 | $0.5000 | $1,840.00 | $0.5000 | $1,840.00 | $0.9000 | $3,312.00 |
| 646.2040 | Marking Line Grooved Wet Ref Epoxy 6-Inch | 7,440 | LF | $1.4800 | $11,011.20 | $1.4700 | $10,936.80 | $2.2500 | $16,740.00 | $1.4700 | $10,936.80 | $1.4700 | $10,936.80 | $2.2500 | $16,740.00 |
| 646.4040 | Marking Line Grooved Wet Ref Epoxy 10-Inch | 260 | LF | $2.9600 | $769.60 | $2.9300 | $761.80 | $3.8500 | $1,001.00 | $2.9300 | $761.80 | $2.9300 | $761.80 | $3.8500 | $1,001.00 |
| 646.5520 | Marking Outfall Epoxy | 3 | EACH | $51.8600 | $155.58 | $51.3500 | $154.05 | $250.0000 | $750.00 | $51.3500 | $154.05 | $51.3500 | $154.05 | $250.0000 | $750.00 |
| 646.6320 | Marking Dotted Extension Epoxy 18-Inch | 80 | LF | $16.7400 | $1,339.20 | $16.5700 | $1,325.60 | $15.0000 | $1,200.00 | $16.5700 | $1,325.60 | $16.5700 | $1,325.60 | $15.0000 | $1,200.00 |
| 646.7120 | Marking Diagonal Epoxy 12-Inch | 220 | LF | $16.3000 | $3,586.00 | $16.1400 | $3,550.80 | $11.0000 | $2,420.00 | $16.1400 | $3,550.80 | $16.1400 | $3,550.80 | $11.0000 | $2,420.00 |
| 646.8120 | Marking Curb Epoxy | 80 | LF | $8.0100 | $640.80 | $7.9300 | $634.40 | $8.0000 | $640.00 | $7.9300 | $634.40 | $7.9300 | $634.40 | $8.0000 | $640.00 |
| 646.8220 | Marking Island Nose Epoxy | 8 | EACH | $301.1300 | $2,409.04 | $298.1500 | $2,385.20 | $350.0000 | $2,800.00 | $298.1500 | $2,385.20 | $298.1500 | $2,385.20 | $350.0000 | $2,800.00 |
| 650.4000 | Construction Staking Storm Sewer | 29 | EACH | $130.0000 | $3,770.00 | $130.0000 | $3,770.00 | $130.0000 | $3,770.00 | $130.0000 | $3,770.00 | $130.0000 | $3,770.00 | $130.0000 | $3,770.00 |
| 650.4500 | Construction Staking Subgrade | 2,450 | LF | $0.0100 | $24.50 | $0.0100 | $24.50 | $0.0100 | $24.50 | $0.0100 | $24.50 | $0.0100 | $24.50 | $0.0100 | $24.50 |
| 650.5000 | Construction Staking Base | 2,450 | LF | $1.0000 | $2,450.00 | $1.0000 | $2,450.00 | $1.0000 | $2,450.00 | $1.0000 | $2,450.00 | $1.0000 | $2,450.00 | $1.0000 | $2,450.00 |
| 650.5500 | Construction Staking Curb Gutter and Curb & Gutter | 4,880 | LF | $1.1000 | $5,368.00 | $1.1000 | $5,368.00 | $1.1000 | $5,368.00 | $1.1000 | $5,368.00 | $1.1000 | $5,368.00 | $1.1000 | $5,368.00 |
| 650.8501 | Construction Staking Electrical Installations (project) 01. 2475-04-71 | 1 | EACH | $700.0000 | $700.00 | $700.0000 | $700.00 | $700.0000 | $700.00 | $700.0000 | $700.00 | $700.0000 | $700.00 | $700.0000 | $700.00 |
| 650.9911 | Construction Staking Supplemental Control (project) 01. 2475-04-71 | 1 | EACH | $600.0000 | $600.00 | $600.0000 | $600.00 | $600.0000 | $600.00 | $600.0000 | $600.00 | $600.0000 | $600.00 | $600.0000 | $600.00 |
| 650.9920 | Construction Staking Slope Stakes | 2,450 | LF | $0.9000 | $2,205.00 | $0.9000 | $2,205.00 | $0.9000 | $2,205.00 | $0.9000 | $2,205.00 | $0.9000 | $2,205.00 | $0.9000 | $2,205.00 |
| 652.0225 | Conduit Rigid Nonmetallic Schedule 40 2-Inch | 1,455 | LF | $6.5800 | $9,573.90 | $6.5800 | $9,573.90 | $6.5800 | $9,573.90 | $6.5800 | $9,573.90 | $6.5800 | $9,573.90 | $6.5800 | $9,573.90 |
| 652.0235 | Conduit Rigid Nonmetallic Schedule 40 3-Inch | 250 | LF | $8.5400 | $2,135.00 | $8.5400 | $2,135.00 | $8.5400 | $2,135.00 | $8.5400 | $2,135.00 | $8.5400 | $2,135.00 | $8.5400 | $2,135.00 |
| 653.0140 | Pull Boxes Steel 24x42-Inch | 9 | EACH | $1,461.2800 | $13,151.52 | $1,461.2800 | $13,151.52 | $1,461.2800 | $13,151.52 | $1,461.2800 | $13,151.52 | $1,461.2800 | $13,151.52 | $1,461.2800 | $13,151.52 |
| 654.0105 | Concrete Bases Type 5 | 13 | EACH | $1,199.3500 | $15,591.55 | $1,199.3500 | $15,591.55 | $1,199.3500 | $15,591.55 | $1,199.3500 | $15,591.55 | $1,199.3500 | $15,591.55 | $1,199.3500 | $15,591.55 |
| 654.0230 | Concrete Control Cabinet Bases Type L30 | 1 | EACH | $775.3000 | $775.30 | $775.3000 | $775.30 | $775.3000 | $775.30 | $775.3000 | $775.30 | $775.3000 | $775.30 | $775.3000 | $775.30 |
| 655.0610 | Electrical Wire Lighting 12 AWG | 1,908 | LF | $0.9500 | $1,812.60 | $0.9500 | $1,812.60 | $0.9500 | $1,812.60 | $0.9500 | $1,812.60 | $0.9500 | $1,812.60 | $0.9500 | $1,812.60 |
| 655.0620 | Electrical Wire Lighting 8 AWG | 9,905 | LF | $1.6400 | $16,244.20 | $1.6400 | $16,244.20 | $1.6400 | $16,244.20 | $1.6400 | $16,244.20 | $1.6400 | $16,244.20 | $1.6400 | $16,244.20 |
| 655.0640 | Electrical Wire Lighting 1 AWG | 18 | LF | $4.8400 | $87.12 | $4.8400 | $87.12 | $4.8400 | $87.12 | $4.8400 | $87.12 | $4.8400 | $87.12 | $4.8400 | $87.12 |
| 656.0201 | Electrical Service Meter Breaker Pedestal (location) 01. HL-66-DG | 1 | EACH | $1,753.9500 | $1,753.95 | $1,753.9500 | $1,753.95 | $1,753.9500 | $1,753.95 | $1,753.9500 | $1,753.95 | $1,753.9500 | $1,753.95 | $1,753.9500 | $1,753.95 |
| 657.0255 | Transformer Bases Breakaway 11 1/2-Inch Bolt Circle | 14 | EACH | $782.6000 | $10,956.40 | $782.6000 | $10,956.40 | $782.6000 | $10,956.40 | $782.6000 | $10,956.40 | $782.6000 | $10,956.40 | $782.6000 | $10,956.40 |
| 657.0322 | Poles Type 5-Aluminum | 14 | EACH | $2,437.7800 | $34,128.92 | $2,437.7800 | $34,128.92 | $2,437.7800 | $34,128.92 | $2,437.7800 | $34,128.92 | $2,437.7800 | $34,128.92 | $2,437.7800 | $34,128.92 |
| 657.0610 | Luminaire Arms Single Member 4 1/2-Inch Clamp 6-FT | 4 | EACH | $415.7600 | $1,663.04 | $415.7600 | $1,663.04 | $415.7600 | $1,663.04 | $415.7600 | $1,663.04 | $415.7600 | $1,663.04 | $415.7600 | $1,663.04 |
| 657.0715 | Luminaire Arms Truss Type 4 1/2-Inch Clamp 15-FT | 10 | EACH | $973.6500 | $9,736.50 | $973.6500 | $9,736.50 | $973.6500 | $9,736.50 | $973.6500 | $9,736.50 | $973.6500 | $9,736.50 | $973.6500 | $9,736.50 |
| 659.1115 | Luminaires Utility LED A | 14 | EACH | $320.0900 | $4,481.26 | $320.0900 | $4,481.26 | $320.0900 | $4,481.26 | $320.0900 | $4,481.26 | $320.0900 | $4,481.26 | $320.0900 | $4,481.26 |
| 659.2130 | Lighting Control Cabinets 120/240 30-Inch | 1 | EACH | $9,458.2100 | $9,458.21 | $9,458.2100 | $9,458.21 | $9,458.2100 | $9,458.21 | $9,458.2100 | $9,458.21 | $9,458.2100 | $9,458.21 | $9,458.2100 | $9,458.21 |
| 690.0150 | Sawing Asphalt | 270 | LF | $2.0000 | $540.00 | $1.8900 | $510.30 | $3.7500 | $1,012.50 | $3.7500 | $1,012.50 | $5.0000 | $1,350.00 | $1.8900 | $510.30 |
| 715.0720 | Incentive Compressive Strength Concrete Pavement | 138 | DOL | $1.0000 | $138.00 | $1.0000 | $138.00 | $1.0000 | $138.00 | $1.0000 | $138.00 | $1.0000 | $138.00 | $1.0000 | $138.00 |
| ASP.1T0A | On-the-Job Training Apprentice at $5.00/HR | 250 | HRS | $5.0000 | $1,250.00 | $5.0000 | $1,250.00 | $5.0000 | $1,250.00 | $5.0000 | $1,250.00 | $5.0000 | $1,250.00 | $5.0000 | $1,250.00 |
| ASP.1T0G | On-the-Job Training Graduate at $5.00/HR | 900 | HRS | $5.0000 | $4,500.00 | $5.0000 | $4,500.00 | $5.0000 | $4,500.00 | $5.0000 | $4,500.00 | $5.0000 | $4,500.00 | $5.0000 | $4,500.00 |
| SPV.0060 | Special 20. Lighting System Survey (2475-04-71) | 4 | EACH | $1,809.0275 | $7,236.11 | $1,809.0275 | $7,236.11 | $1,809.0275 | $7,236.11 | $1,809.0275 | $7,236.11 | $1,809.0275 | $7,236.11 | $1,809.0275 | $7,236.11 |
| SPV.0085 | Special 01. Seeding No Mow Fescue | 25 | LB | $15.0000 | $375.00 | $15.0000 | $375.00 | $15.0000 | $375.00 | $15.0000 | $375.00 | $10.0000 | $250.00 | $10.0000 | $250.00 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →