Contract 20260414017
West Bend - Port Washington; Milwaukee River To Jackson Road
- County
- Ozaukee
- Letting
- April 14, 2026
- Bidders
- 4
Apparent low bid
STARK PAVEMENT CORPORATION
$3,939,352.07
Other bidders
LALONDE CONTRACTORS INCORPORATED
$4,150,196.17
ZIGNEGO COMPANY, INC.
$4,150,574.42
PAYNE AND DOLAN, INC
$4,283,709.36
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | STARK PAVEMENT CORPORATION $3,939,352.07 | LALONDE CONTRACTORS INCORPORATED $4,150,196.17 | ZIGNEGO COMPANY, INC. $4,150,574.42 | PAYNE AND DOLAN, INC $4,283,709.36 | ||||
|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 201.0220 | Grubbing | 54 | ID | $45.0000 | $2,430.00 | $40.0000 | $2,160.00 | $40.0000 | $2,160.00 | $40.0000 | $2,160.00 |
| 204.0100 | Removing Concrete Pavement | 45 | SY | $50.0000 | $2,250.00 | $16.0000 | $720.00 | $70.0000 | $3,150.00 | $20.0000 | $900.00 |
| 204.0110 | Removing Asphaltic Surface | 4,221 | SY | $5.0000 | $21,105.00 | $13.3300 | $56,265.93 | $11.0000 | $46,431.00 | $9.0000 | $37,989.00 |
| 204.0115 | Removing Asphaltic Surface Butt Joints | 217 | SY | $6.8000 | $1,475.60 | $33.5000 | $7,269.50 | $33.5000 | $7,269.50 | $8.0000 | $1,736.00 |
| 204.0120 | Removing Asphaltic Surface Milling | 88,000 | SY | $4.9000 | $431,200.00 | $3.1500 | $277,200.00 | $3.1500 | $277,200.00 | $3.9000 | $343,200.00 |
| 204.0150 | Removing Curb & Gutter | 5,045 | LF | $9.5000 | $47,927.50 | $9.1000 | $45,909.50 | $9.5000 | $47,927.50 | $9.0000 | $45,405.00 |
| 204.0155 | Removing Concrete Sidewalk | 2,340 | SY | $8.0000 | $18,720.00 | $11.1400 | $26,067.60 | $13.0000 | $30,420.00 | $6.5000 | $15,210.00 |
| 204.0220 | Removing Inlets | 1 | EACH | $550.0000 | $550.00 | $550.0000 | $550.00 | $850.0000 | $850.00 | $550.0000 | $550.00 |
| 204.0245 | Removing Storm Sewer (size) 02. 36-Inch | 73 | LF | $21.0000 | $1,506.00 | $21.0000 | $1,506.00 | $50.0000 | $3,650.00 | $21.0000 | $1,506.00 |
| 204.9060.S | Removing (item description) 01. Traffic Signals (STH 33 & Foster Drive) | 1 | EACH | $3,227.0000 | $3,227.00 | $3,227.0000 | $3,227.00 | $3,227.0000 | $3,227.00 | $3,227.0000 | $3,227.00 |
| 205.0100 | Excavation Common | 731 | CY | $29.9000 | $21,856.90 | $42.1400 | $30,804.34 | $60.0000 | $43,860.00 | $34.6000 | $25,292.60 |
| 213.0100 | Finishing Roadway (project) 02. 4030-03-71 | 2 | EACH | $5,500.0000 | $11,000.00 | $2,910.0000 | $5,820.00 | $1,000.0000 | $2,000.00 | $2,400.0000 | $4,800.00 |
| 305.0115 | Base Aggregate Dense 3/4-Inch | 61 | CY | $114.2000 | $6,966.20 | $61.8200 | $3,771.02 | $100.0000 | $6,100.00 | $220.0000 | $13,420.00 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 35 | TON | $55.8500 | $1,954.75 | $34.6000 | $1,211.00 | $50.0000 | $1,750.00 | $110.0000 | $3,850.00 |
| 305.0125 | Base Aggregate Dense 1 1/4-Inch | 98 | CY | $94.5000 | $9,261.00 | $61.8100 | $6,057.38 | $100.0000 | $9,800.00 | $74.0000 | $7,252.00 |
| 416.0610 | Drilled Tie Bars | 540 | EACH | $18.0000 | $9,720.00 | $20.3700 | $10,999.80 | $20.0000 | $10,800.00 | $10.0000 | $5,400.00 |
| 455.0605 | Tack Coat | 6,229 | GAL | $3.0000 | $18,687.00 | $2.3000 | $14,326.70 | $2.3000 | $14,326.70 | $2.3000 | $14,326.70 |
| 460.0105.S | HMA Percent Within Limits (PWL) Test Strip Volumetrics | 1 | EACH | $8,000.0000 | $8,000.00 | $1,225.0000 | $1,225.00 | $1,225.0000 | $1,225.00 | $1,450.0000 | $1,450.00 |
| 460.0110.S | HMA Percent Within Limits (PWL) Test Strip Density | 1 | EACH | $4,000.0000 | $4,000.00 | $7,975.0000 | $7,975.00 | $7,975.0000 | $7,975.00 | $8,800.0000 | $8,800.00 |
| 460.2005 | Incentive Density PWL HMA Pavement | 9,515 | DOL | $1.0000 | $9,515.00 | $1.0000 | $9,515.00 | $1.0000 | $9,515.00 | $1.0000 | $9,515.00 |
| 460.2007 | Incentive Density HMA Pavement Longitudinal Joints | 4,920 | DOL | $1.0000 | $4,920.00 | $1.0000 | $4,920.00 | $1.0000 | $4,920.00 | $1.0000 | $4,920.00 |
| 460.2010 | Incentive Air Voids HMA Pavement | 11,615 | DOL | $1.0000 | $11,615.00 | $1.0000 | $11,615.00 | $1.0000 | $11,615.00 | $1.0000 | $11,615.00 |
| 460.6223 | HMA Pavement 3 MT 58-28 S | 270 | TON | $180.1000 | $48,627.00 | $159.5000 | $43,065.00 | $159.5000 | $43,065.00 | $176.7500 | $47,722.50 |
| 460.6424 | HMA Pavement 4 MT 58-28 H | 11,720 | TON | $99.8500 | $1,170,242.00 | $91.1000 | $1,067,692.00 | $91.1000 | $1,067,692.00 | $97.2500 | $1,139,770.00 |
| 465.0105 | Asphaltic Surface | 453 | TON | $187.1000 | $84,756.30 | $285.0000 | $129,105.00 | $285.0000 | $129,105.00 | $365.0000 | $165,345.00 |
| 465.0125 | Asphaltic Surface Temporary | 16 | TON | $265.0000 | $4,240.00 | $225.0000 | $3,600.00 | $225.0000 | $3,600.00 | $225.0000 | $3,600.00 |
| 495.1000.S | Cold Patch | 100 | TON | $265.0000 | $26,500.00 | $225.0000 | $22,500.00 | $1.0000 | $100.00 | $225.0000 | $22,500.00 |
| 520.8000 | Concrete Collars for Pipe | 3 | EACH | $550.0000 | $1,650.00 | $550.0000 | $1,650.00 | $1,500.0000 | $4,500.00 | $550.0000 | $1,650.00 |
| 601.0411 | Concrete Curb & Gutter 30-Inch Type D | 4,969 | LF | $26.0000 | $129,194.00 | $52.8100 | $262,412.89 | $50.0000 | $248,450.00 | $54.9500 | $273,046.55 |
| 601.0600 | Concrete Curb Pedestrian | 1,292 | LF | $55.0000 | $71,060.00 | $54.5900 | $70,530.28 | $60.0000 | $77,520.00 | $26.2000 | $33,850.40 |
| 602.0410 | Concrete Sidewalk 5-Inch | 24,082 | SF | $9.2000 | $221,554.40 | $10.4500 | $251,656.90 | $13.5000 | $325,107.00 | $10.3000 | $248,044.60 |
| 602.0505 | Curb Ramp Detectable Warning Field Yellow | 1,853 | SF | $52.0000 | $96,356.00 | $45.9800 | $85,200.94 | $60.0000 | $111,180.00 | $45.0000 | $83,385.00 |
| 602.0605 | Curb Ramp Detectable Warning Field Radial Yellow | 358 | SF | $65.0000 | $23,270.00 | $66.4100 | $23,774.78 | $100.0000 | $35,800.00 | $58.0000 | $20,764.00 |
| 602.0810 | Concrete Driveway 6-Inch | 29 | SY | $85.0000 | $2,465.00 | $87.9900 | $2,551.71 | $100.0000 | $2,900.00 | $100.0000 | $2,900.00 |
| 602.0820 | Concrete Driveway 8-Inch | 45 | SY | $95.0000 | $4,275.00 | $102.8500 | $4,628.25 | $100.0000 | $4,500.00 | $115.0000 | $5,175.00 |
| 608.0312 | Storm Sewer Pipe Reinforced Concrete Class III 12-Inch | 43 | LF | $88.0000 | $3,784.00 | $88.0000 | $3,784.00 | $200.0000 | $8,600.00 | $88.0000 | $3,784.00 |
| 608.0336 | Storm Sewer Pipe Reinforced Concrete Class III 36-Inch | 44 | LF | $196.0000 | $8,624.00 | $196.0000 | $8,624.00 | $300.0000 | $13,200.00 | $196.0000 | $8,624.00 |
| 608.3012 | Storm Sewer Pipe Class III-A 12-Inch | 65 | LF | $88.0000 | $5,720.00 | $88.0000 | $5,720.00 | $150.0000 | $9,750.00 | $88.0000 | $5,720.00 |
| 611.0420 | Reconstructing Manholes | 3 | EACH | $1,443.0000 | $4,329.00 | $1,443.0000 | $4,329.00 | $1,850.0000 | $5,550.00 | $1,443.0000 | $4,329.00 |
| 611.0430 | Reconstructing Inlets | 7 | EACH | $1,443.0000 | $10,101.00 | $1,443.0000 | $10,101.00 | $1,650.0000 | $11,550.00 | $1,443.0000 | $10,101.00 |
| 611.0535 | Manhole Covers Type J-Special | 1 | EACH | $810.0000 | $810.00 | $810.0000 | $810.00 | $1,250.0000 | $1,250.00 | $810.0000 | $810.00 |
| 611.0540 | Manhole Covers Type K | 1 | EACH | $1,764.0000 | $1,764.00 | $1,764.0000 | $1,764.00 | $1,350.0000 | $1,350.00 | $1,764.0000 | $1,764.00 |
| 611.0600 | Inlet Covers Type A | 4 | EACH | $1,012.0000 | $4,048.00 | $1,012.0000 | $4,048.00 | $1,350.0000 | $5,400.00 | $1,012.0000 | $4,048.00 |
| 611.1006 | Catch Basins 6-FT Diameter | 2 | EACH | $5,428.0000 | $10,856.00 | $5,428.0000 | $10,856.00 | $8,000.0000 | $16,000.00 | $5,428.0000 | $10,856.00 |
| 611.2006 | Manholes 6-FT Diameter | 1 | EACH | $5,873.0000 | $5,873.00 | $5,873.0000 | $5,873.00 | $9,000.0000 | $9,000.00 | $5,873.0000 | $5,873.00 |
| 611.3003 | Inlets 3-FT Diameter | 2 | EACH | $2,108.0000 | $4,216.00 | $2,108.0000 | $4,216.00 | $3,000.0000 | $6,000.00 | $2,108.0000 | $4,216.00 |
| 611.8110 | Adjusting Manhole Covers | 1 | EACH | $1,050.0000 | $1,050.00 | $1,050.0000 | $1,050.00 | $950.0000 | $950.00 | $1,050.0000 | $1,050.00 |
| 611.8115 | Adjusting Inlet Covers | 36 | EACH | $1,050.0000 | $37,800.00 | $1,050.0000 | $37,800.00 | $1,000.0000 | $36,000.00 | $1,050.0000 | $37,800.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 02. 4030-03-71 | 2 | EACH | $5,000.0000 | $10,000.00 | $1.0000 | $2.00 | $1.0000 | $2.00 | $1.0000 | $2.00 |
| 619.1000 | Mobilization | 1 | EACH | $210,500.0000 | $210,500.00 | $530,397.2200 | $530,397.22 | $365,000.0000 | $365,000.00 | $430,000.0000 | $430,000.00 |
| 624.0100 | Water | 27 | MGAL | $50.0000 | $1,350.00 | $56.2000 | $1,517.40 | $1.0000 | $27.00 | $50.0000 | $1,350.00 |
| 627.0200 | Mulching | 2,000 | SY | $0.3300 | $660.00 | $0.3300 | $660.00 | $0.3300 | $660.00 | $0.3300 | $660.00 |
| 628.1905 | Mobilizations Erosion Control | 4 | EACH | $85.0000 | $340.00 | $85.0000 | $340.00 | $85.0000 | $340.00 | $85.0000 | $340.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 4 | EACH | $50.0000 | $200.00 | $50.0000 | $200.00 | $50.0000 | $200.00 | $50.0000 | $200.00 |
| 628.7010 | Inlet Protection Type B | 2 | EACH | $45.0000 | $90.00 | $45.0000 | $90.00 | $45.0000 | $90.00 | $45.0000 | $90.00 |
| 628.7015 | Inlet Protection Type C | 66 | EACH | $33.0000 | $2,178.00 | $33.0000 | $2,178.00 | $33.0000 | $2,178.00 | $33.0000 | $2,178.00 |
| 628.7020 | Inlet Protection Type D | 174 | EACH | $62.5000 | $10,875.00 | $62.5000 | $10,875.00 | $62.5000 | $10,875.00 | $62.5000 | $10,875.00 |
| 630.0200 | Seeding Temporary | 6 | LB | $12.0000 | $72.00 | $12.0000 | $72.00 | $12.0000 | $72.00 | $12.0000 | $72.00 |
| 634.0618 | Posts Wood 4x6-Inch X 18-FT | 316 | EACH | $76.5000 | $24,174.00 | $76.5000 | $24,174.00 | $76.5000 | $24,174.00 | $76.5000 | $24,174.00 |
| 637.1220 | Signs Type I Reflective SH | 28 | SF | $43.0000 | $1,204.00 | $43.0000 | $1,204.00 | $43.0000 | $1,204.00 | $43.0000 | $1,204.00 |
| 637.2210 | Signs Type II Reflective H | 2,357 | SF | $19.9900 | $47,116.43 | $19.9900 | $47,116.43 | $19.9900 | $47,116.43 | $19.9900 | $47,116.43 |
| 637.2215 | Signs Type II Reflective H Folding | 153 | SF | $27.9000 | $4,268.70 | $27.9000 | $4,268.70 | $27.9000 | $4,268.70 | $27.9000 | $4,268.70 |
| 637.2220 | Signs Type II Reflective SH | 7 | SF | $28.0000 | $196.00 | $28.0000 | $196.00 | $28.0000 | $196.00 | $28.0000 | $196.00 |
| 637.2230 | Signs Type II Reflective F | 881 | SF | $19.2500 | $16,959.25 | $19.2500 | $16,959.25 | $19.2500 | $16,959.25 | $19.2500 | $16,959.25 |
| 638.2102 | Moving Signs Type II | 11 | EACH | $85.0000 | $935.00 | $85.0000 | $935.00 | $85.0000 | $935.00 | $85.0000 | $935.00 |
| 638.2602 | Removing Signs Type II | 510 | EACH | $12.0000 | $6,120.00 | $12.0000 | $6,120.00 | $12.0000 | $6,120.00 | $12.0000 | $6,120.00 |
| 638.3000 | Removing Small Sign Supports | 295 | EACH | $12.5000 | $3,687.50 | $12.5000 | $3,687.50 | $12.5000 | $3,687.50 | $12.5000 | $3,687.50 |
| 642.5201 | Field Office Type C | 1 | EACH | $10,150.0000 | $10,150.00 | $13,664.0000 | $13,664.00 | $20,000.0000 | $20,000.00 | $17,000.0000 | $17,000.00 |
| 643.0300 | Traffic Control Drums | 9,044 | DAY | $0.2500 | $2,261.00 | $0.5000 | $4,522.00 | $0.5000 | $4,522.00 | $0.1500 | $1,356.60 |
| 643.0420 | Traffic Control Barricades Type III | 3,072 | DAY | $0.6000 | $1,843.20 | $1.0000 | $3,072.00 | $1.0000 | $3,072.00 | $0.4500 | $1,382.40 |
| 643.0705 | Traffic Control Warning Lights Type A | 6,144 | DAY | $0.1000 | $614.40 | $0.2000 | $1,228.80 | $0.2000 | $1,228.80 | $0.1200 | $737.28 |
| 643.0715 | Traffic Control Warning Lights Type C | 648 | DAY | $0.1000 | $64.80 | $0.2000 | $129.60 | $0.2000 | $129.60 | $0.1200 | $77.76 |
| 643.0810 | Traffic Control Connected Arrow Boards | 108 | DAY | $18.0000 | $1,944.00 | $40.0000 | $4,320.00 | $40.0000 | $4,320.00 | $12.0000 | $1,296.00 |
| 643.0900 | Traffic Control Signs | 22,700 | DAY | $0.3500 | $7,945.00 | $0.4500 | $10,215.00 | $0.4500 | $10,215.00 | $0.2000 | $4,540.00 |
| 643.0920 | Traffic Control Covering Signs Type II | 100 | EACH | $35.0000 | $3,500.00 | $50.0000 | $5,000.00 | $50.0000 | $5,000.00 | $48.5000 | $4,850.00 |
| 643.1000 | Traffic Control Signs Fixed Message | 300 | SF | $18.0000 | $5,400.00 | $24.0000 | $7,200.00 | $24.0000 | $7,200.00 | $19.0000 | $5,700.00 |
| 643.1050 | Traffic Control Signs PCMS | 86 | DAY | $35.0000 | $3,010.00 | $75.0000 | $6,450.00 | $75.0000 | $6,450.00 | $12.5000 | $1,075.00 |
| 643.1070 | Traffic Control Cones 42-Inch | 113,184 | DAY | $0.2000 | $22,636.80 | $0.5000 | $56,592.00 | $0.5000 | $56,592.00 | $0.1300 | $14,713.92 |
| 643.1220 | Traffic Control Connected Work Zone Start and End Location Markers | 432 | DAY | $10.0000 | $4,320.00 | $5.0000 | $2,160.00 | $5.0000 | $2,160.00 | $3.6000 | $1,555.20 |
| 643.3105 | Temporary Marking Line Paint 4-Inch | 62,632 | LF | $0.3500 | $21,921.20 | $0.4500 | $28,184.40 | $0.4500 | $28,184.40 | $0.1800 | $11,273.76 |
| 643.3170 | Temporary Marking Line Epoxy 6-Inch | 3,952 | LF | $2.0500 | $8,101.60 | $4.0000 | $15,808.00 | $4.0000 | $15,808.00 | $0.4400 | $1,738.88 |
| 643.3205 | Temporary Marking Line Paint 8-Inch | 13,004 | LF | $0.6000 | $7,802.40 | $0.8500 | $11,053.40 | $0.8500 | $11,053.40 | $0.4000 | $5,201.60 |
| 643.3270 | Temporary Marking Line Epoxy 10-Inch | 1,177 | LF | $3.4000 | $4,001.80 | $6.7500 | $7,944.75 | $6.7500 | $7,944.75 | $1.4900 | $1,753.73 |
| 643.3505 | Temporary Marking Arrow Paint | 94 | EACH | $115.0000 | $10,810.00 | $75.0000 | $7,050.00 | $75.0000 | $7,050.00 | $183.0000 | $17,202.00 |
| 643.3605 | Temporary Marking Word Paint | 37 | EACH | $130.0000 | $4,810.00 | $75.0000 | $2,775.00 | $75.0000 | $2,775.00 | $283.0000 | $10,471.00 |
| 643.3805 | Temporary Marking Stop Line Paint 18-Inch | 1,139 | LF | $4.0000 | $4,556.00 | $1.9100 | $2,175.49 | $1.9100 | $2,175.49 | $12.2500 | $13,952.75 |
| 643.5000 | Traffic Control | 1 | EACH | $161,000.0000 | $161,000.00 | $30,000.0000 | $30,000.00 | $30,000.0000 | $30,000.00 | $152,000.0000 | $152,000.00 |
| 644.1810 | Temporary Pedestrian Barricade | 6,750 | LF | $4.5000 | $30,375.00 | $5.0000 | $33,750.00 | $5.0000 | $33,750.00 | $4.3000 | $29,025.00 |
| 644.1900.S | Temporary Audible Message Devices | 4,368 | DAY | $5.0000 | $21,840.00 | $5.0000 | $21,840.00 | $5.0000 | $21,840.00 | $3.5000 | $15,288.00 |
| 646.2025 | Marking Line Grooved Black Epoxy 6-Inch | 14,864 | LF | $1.1000 | $16,350.40 | $1.1000 | $16,350.40 | $1.1000 | $16,350.40 | $0.8700 | $12,931.68 |
| 646.2040 | Marking Line Grooved Wet Ref Epoxy 6-Inch | 59,993 | LF | $1.4500 | $86,989.85 | $1.4500 | $86,989.85 | $1.4500 | $86,989.85 | $1.4200 | $85,190.06 |
| 646.4025 | Marking Line Grooved Black Epoxy 10-Inch | 4,267 | LF | $2.2500 | $9,600.75 | $2.2500 | $9,600.75 | $2.2500 | $9,600.75 | $1.9300 | $8,235.31 |
| 646.4040 | Marking Line Grooved Wet Ref Epoxy 10-Inch | 13,004 | LF | $3.1000 | $40,312.40 | $3.1000 | $40,312.40 | $3.1000 | $40,312.40 | $2.8500 | $37,061.40 |
| 646.5020 | Marking Arrow Epoxy | 94 | EACH | $225.0000 | $21,150.00 | $225.0000 | $21,150.00 | $225.0000 | $21,150.00 | $383.4200 | $36,041.48 |
| 646.5120 | Marking Word Epoxy | 37 | EACH | $245.0000 | $9,065.00 | $245.0000 | $9,065.00 | $245.0000 | $9,065.00 | $388.1200 | $14,360.44 |
| 646.6120 | Marking Stop Line Epoxy 18-Inch | 1,139 | LF | $13.0000 | $14,807.00 | $13.0000 | $14,807.00 | $13.0000 | $14,807.00 | $16.0900 | $18,326.51 |
| 646.7120 | Marking Diagonal Epoxy 12-Inch | 76 | LF | $9.7500 | $741.00 | $9.7500 | $741.00 | $9.7500 | $741.00 | $15.6700 | $1,190.92 |
| 646.7220 | Marking Chevron Epoxy 24-Inch | 131 | LF | $13.7500 | $1,801.25 | $13.7500 | $1,801.25 | $13.7500 | $1,801.25 | $26.3900 | $3,457.09 |
| 646.7420 | Marking Crosswalk Epoxy Transverse Line 6-Inch | 2,639 | LF | $10.5000 | $27,709.50 | $10.5000 | $27,709.50 | $10.5000 | $27,709.50 | $15.2500 | $40,244.75 |
| 646.7520 | Marking Crosswalk Epoxy Block Style 24-Inch | 1,042 | LF | $17.5000 | $18,235.00 | $17.5000 | $18,235.00 | $17.5000 | $18,235.00 | $26.3900 | $27,498.38 |
| 646.8120 | Marking Curb Epoxy | 1,033 | LF | $8.0000 | $8,264.00 | $8.0000 | $8,264.00 | $8.0000 | $8,264.00 | $7.6900 | $7,943.77 |
| 646.8220 | Marking Island Nose Epoxy | 32 | EACH | $275.0000 | $8,800.00 | $275.0000 | $8,800.00 | $275.0000 | $8,800.00 | $289.4100 | $9,261.12 |
| 650.4000 | Construction Staking Storm Sewer | 6 | EACH | $180.0000 | $1,080.00 | $180.0000 | $1,080.00 | $180.0000 | $1,080.00 | $180.0000 | $1,080.00 |
| 650.4500 | Construction Staking Subgrade | 761 | LF | $0.0100 | $7.61 | $0.0100 | $7.61 | $0.0100 | $7.61 | $0.0100 | $7.61 |
| 650.5500 | Construction Staking Curb Gutter and Curb & Gutter | 4,969 | LF | $1.5000 | $7,453.50 | $1.5000 | $7,453.50 | $1.5000 | $7,453.50 | $1.5000 | $7,453.50 |
| 650.8000 | Construction Staking Resurfacing Reference | 11,181 | LF | $0.2500 | $2,795.25 | $0.2500 | $2,795.25 | $0.2500 | $2,795.25 | $0.2500 | $2,795.25 |
| 650.8501 | Construction Staking Electrical Installations (project) 01. 4030-03-70 | 1 | EACH | $800.0000 | $800.00 | $800.0000 | $800.00 | $800.0000 | $800.00 | $800.0000 | $800.00 |
| 650.9000 | Construction Staking Curb Ramps | 144 | EACH | $200.0000 | $28,800.00 | $200.0000 | $28,800.00 | $200.0000 | $28,800.00 | $200.0000 | $28,800.00 |
| 650.9500 | Construction Staking Sidewalk (project) 02. 4030-03-71 | 2 | EACH | $1,000.0000 | $2,000.00 | $1,000.0000 | $2,000.00 | $1,000.0000 | $2,000.00 | $1,000.0000 | $2,000.00 |
| 650.9911 | Construction Staking Supplemental Control (project) 02. 4030-03-71 | 2 | EACH | $1,000.0000 | $2,000.00 | $1,000.0000 | $2,000.00 | $1,000.0000 | $2,000.00 | $1,000.0000 | $2,000.00 |
| 652.0225 | Conduit Rigid Nonmetallic Schedule 40 2-Inch | 42 | LF | $41.7100 | $1,751.82 | $41.7100 | $1,751.82 | $41.7100 | $1,751.82 | $41.7100 | $1,751.82 |
| 652.0800 | Conduit Loop Detector | 736 | LF | $8.6700 | $6,381.12 | $8.6700 | $6,381.12 | $8.6700 | $6,381.12 | $8.6700 | $6,381.12 |
| 653.0135 | Pull Boxes Steel 24x36-Inch | 1 | EACH | $1,490.0000 | $1,490.00 | $1,483.0000 | $1,483.00 | $1,483.0000 | $1,483.00 | $1,483.0000 | $1,483.00 |
| 655.0700 | Loop Detector Lead In Cable | 1,944 | LF | $2.1700 | $4,218.48 | $2.1700 | $4,218.48 | $2.1700 | $4,218.48 | $2.1700 | $4,218.48 |
| 655.0800 | Loop Detector Wire | 2,208 | LF | $1.4700 | $3,245.76 | $1.4700 | $3,245.76 | $1.4700 | $3,245.76 | $1.4700 | $3,245.76 |
| 690.0150 | Sawing Asphalt | 6,189 | LF | $1.2500 | $7,736.25 | $1.2000 | $7,426.80 | $1.3900 | $8,602.71 | $1.2000 | $7,426.80 |
| 690.0250 | Sawing Concrete | 1,110 | LF | $2.3000 | $2,553.00 | $2.2500 | $2,497.50 | $1.9500 | $2,164.50 | $2.1000 | $2,331.00 |
| 740.0440 | Incentive IRI Ride | 4,250 | DOL | $1.0000 | $4,250.00 | $1.0000 | $4,250.00 | $1.0000 | $4,250.00 | $1.0000 | $4,250.00 |
| ASP.1T0A | On-the-Job Training Apprentice at $5.00/HR | 1,100 | HRS | $5.0000 | $5,500.00 | $5.0000 | $5,500.00 | $5.0000 | $5,500.00 | $5.0000 | $5,500.00 |
| ASP.1T0G | On-the-Job Training Graduate at $5.00/HR | 2,400 | HRS | $5.0000 | $12,000.00 | $5.0000 | $12,000.00 | $5.0000 | $12,000.00 | $5.0000 | $12,000.00 |
| SPV.0060 | Special 04. Curb Ramp Grading, Shaping, and Finishing | 107 | EACH | $6,427.5000 | $47,340.00 | $4,721.1450 | $60,968.32 | $4,921.5000 | $144,316.00 | $4,784.0000 | $87,116.00 |
| SPV.0090 | Special 02. Marking Line Grooved Wet Ref Epoxy 18-Inch | 4,275 | LF | $24.2500 | $139,950.00 | $19.2500 | $101,700.00 | $13.0000 | $53,887.50 | $24.1000 | $106,065.00 |
| SPV.0165 | Special 01. Exposed Aggregate Concrete Sidewalk 5-Inch | 695 | SF | $18.0000 | $12,510.00 | $19.7200 | $13,705.40 | $15.0000 | $10,425.00 | $18.0000 | $12,510.00 |
| SPV.0195 | Special 01. Asphaltic Repair | 264 | TON | $268.1000 | $70,778.40 | $355.0000 | $93,720.00 | $355.0000 | $93,720.00 | $420.0000 | $110,880.00 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →