WI
Wisconsin DOT · Bid Tabulation
Contract 20260414020
Stevens Point - Waupaca; Portage Co Line To Anderson Road
- County
- Waupaca
- Letting
- April 14, 2026
- Bidders
- 5
Apparent low bid
SOMMERS CONSTRUCTION CO., INC.
$2,426,243.71
Other bidders
CHIPPEWA CONCRETE SERVICES, INC.
$2,495,479.00
VINTON CONSTRUCTION COMPANY
$2,627,797.42
ZIGNEGO COMPANY, INC.
$2,644,360.30
MICHELS ROAD & STONE, INC.
$2,791,648.23
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | SOMMERS CONSTRUCTION CO., INC. $2,426,243.71 | CHIPPEWA CONCRETE SERVICES, INC. $2,495,479.00 | VINTON CONSTRUCTION COMPANY $2,627,797.42 | ZIGNEGO COMPANY, INC. $2,644,360.30 | MICHELS ROAD & STONE, INC. $2,791,648.23 | |||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | Unit Price | Extension | ||||
| 204.0100 | Removing Concrete Pavement | 12 | SY | $35.0000 | $420.00 | $50.5500 | $606.60 | $20.0000 | $240.00 | $100.0000 | $1,200.00 | $137.7400 | $1,652.88 |
| 204.0110 | Removing Asphaltic Surface | 310 | SY | $4.0000 | $1,240.00 | $6.9500 | $2,154.50 | $10.0000 | $3,100.00 | $50.0000 | $15,500.00 | $43.6300 | $13,525.30 |
| 204.0115 | Removing Asphaltic Surface Butt Joints | 78 | SY | $19.5000 | $1,521.00 | $19.7100 | $1,537.38 | $19.5000 | $1,521.00 | $19.5000 | $1,521.00 | $19.5000 | $1,521.00 |
| 204.0120 | Removing Asphaltic Surface Milling | 69,690 | SY | $0.8600 | $59,933.40 | $0.8700 | $60,630.30 | $0.8600 | $59,933.40 | $0.8600 | $59,933.40 | $0.8600 | $59,933.40 |
| 204.0165 | Removing Guardrail | 1,111 | LF | $3.0000 | $3,333.00 | $2.8100 | $3,121.91 | $3.0000 | $3,333.00 | $2.0000 | $2,222.00 | $3.0000 | $3,333.00 |
| 204.0180 | Removing Delineators and Markers | 35 | EACH | $25.0000 | $875.00 | $20.2200 | $707.70 | $25.0000 | $875.00 | $20.0000 | $700.00 | $25.0000 | $875.00 |
| 211.0101 | Prepare Foundation for Asphaltic Paving (project) 01. 6290-05-61 | 1 | EACH | $1,975.0000 | $1,975.00 | $1,996.7300 | $1,996.73 | $1,975.0000 | $1,975.00 | $1,975.0000 | $1,975.00 | $1,975.0000 | $1,975.00 |
| 213.0100 | Finishing Roadway (project) 01. 6290-05-61 | 1 | EACH | $2,500.0000 | $2,500.00 | $3,538.5000 | $3,538.50 | $4,000.0000 | $4,000.00 | $1,000.0000 | $1,000.00 | $5,000.0000 | $5,000.00 |
| 305.0110 | Base Aggregate Dense 3/4-Inch | 1,706 | TON | $29.6500 | $50,582.90 | $25.0700 | $42,769.42 | $40.0000 | $68,240.00 | $34.0000 | $58,004.00 | $39.1000 | $66,704.60 |
| 415.0060 | Concrete Pavement 6-Inch | 12 | SY | $85.0000 | $1,020.00 | $101.1000 | $1,213.20 | $105.0000 | $1,260.00 | $200.0000 | $2,400.00 | $208.3800 | $2,500.56 |
| 415.6000.S | Rout and Seal | 101,210 | LF | $0.7300 | $73,883.30 | $0.7400 | $74,895.40 | $1.2500 | $126,512.50 | $0.7300 | $73,883.30 | $0.6500 | $65,786.50 |
| 416.0610 | Drilled Tie Bars | 1,500 | EACH | $8.0000 | $12,000.00 | $8.0900 | $12,135.00 | $10.0000 | $15,000.00 | $12.0000 | $18,000.00 | $17.8800 | $26,820.00 |
| 416.0620 | Drilled Dowel Bars | 3,900 | EACH | $14.7000 | $57,330.00 | $15.1700 | $59,163.00 | $16.5500 | $64,545.00 | $17.0000 | $66,300.00 | $23.9300 | $93,327.00 |
| 416.1710 | Concrete Pavement Repair | 1,700 | SY | $85.5700 | $145,469.00 | $96.0500 | $163,285.00 | $104.3500 | $177,395.00 | $117.0000 | $198,900.00 | $89.9700 | $152,949.00 |
| 416.1720 | Concrete Pavement Replacement | 5,700 | SY | $85.5700 | $487,749.00 | $96.0500 | $547,485.00 | $108.3500 | $617,595.00 | $106.0000 | $604,200.00 | $95.5300 | $544,521.00 |
| 420.1000 | Continuous Diamond Grinding Concrete Pavement | 11,300 | SY | $7.5000 | $84,750.00 | $6.6700 | $75,371.00 | $6.6700 | $75,371.00 | $7.6000 | $85,880.00 | $6.6000 | $74,580.00 |
| 455.0605 | Tack Coat | 4,877 | GAL | $3.9400 | $19,215.38 | $3.9800 | $19,410.46 | $3.9400 | $19,215.38 | $3.9400 | $19,215.38 | $3.9400 | $19,215.38 |
| 460.2000 | Incentive Density HMA Pavement | 4,380 | DOL | $1.0000 | $4,380.00 | $1.0000 | $4,380.00 | $1.0000 | $4,380.00 | $1.0000 | $4,380.00 | $1.0000 | $4,380.00 |
| 460.5224 | HMA Pavement 4 LT 58-28 S | 6,831 | TON | $77.1800 | $527,216.58 | $78.0300 | $533,022.93 | $77.1800 | $527,216.58 | $77.1800 | $527,216.58 | $77.1800 | $527,216.58 |
| 465.0510 | Asphaltic Rumble Strips, Shoulder Divided Roadway | 50,525 | LF | $0.1400 | $7,073.50 | $0.1400 | $7,073.50 | $0.1400 | $7,073.50 | $0.1400 | $7,073.50 | $0.1800 | $9,094.50 |
| 602.3210 | Concrete Rumble Strips, Shoulder Divided Roadway | 48,625 | LF | $0.8800 | $42,790.00 | $0.8900 | $43,276.25 | $0.8800 | $42,790.00 | $0.8800 | $42,790.00 | $0.6700 | $32,578.75 |
| 614.0010 | Barrier System Grading Shaping Finishing | 4 | EACH | $3,850.0000 | $15,400.00 | $2,267.1700 | $9,068.68 | $3,450.0000 | $13,800.00 | $4,133.0000 | $16,532.00 | $3,774.8400 | $15,099.36 |
| 614.2300 | MGS Guardrail 3 | 750 | LF | $30.0000 | $22,500.00 | $29.8200 | $22,365.00 | $30.0000 | $22,500.00 | $26.0000 | $19,500.00 | $30.0000 | $22,500.00 |
| 614.2500 | MGS Thrie Beam Transition | 157.6 | LF | $90.0000 | $14,184.00 | $94.5300 | $14,897.93 | $90.0000 | $14,184.00 | $90.0000 | $14,184.00 | $90.0000 | $14,184.00 |
| 614.2610 | MGS Guardrail Terminal EAT | 4 | EACH | $4,000.0000 | $16,000.00 | $3,841.8000 | $15,367.20 | $4,000.0000 | $16,000.00 | $3,433.0000 | $13,732.00 | $4,000.0000 | $16,000.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 01. 6290-05-61 | 1 | EACH | $0.0100 | $0.01 | $1,011.0000 | $1,011.00 | $0.0100 | $0.01 | $1.0000 | $1.00 | $0.0100 | $0.01 |
| 619.1000 | Mobilization | 1 | EACH | $124,700.0000 | $124,700.00 | $119,247.4500 | $119,247.45 | $96,000.0000 | $96,000.00 | $135,000.0000 | $135,000.00 | $344,409.8800 | $344,409.88 |
| 624.0100 | Water | 33 | MGAL | $55.0000 | $1,815.00 | $25.2800 | $834.24 | $30.0000 | $990.00 | $1.0000 | $33.00 | $75.0000 | $2,475.00 |
| 628.1504 | Silt Fence | 1,000 | LF | $2.5000 | $2,500.00 | $2.8800 | $2,880.00 | $2.5000 | $2,500.00 | $2.5000 | $2,500.00 | $2.5000 | $2,500.00 |
| 628.1520 | Silt Fence Maintenance | 2,000 | LF | $0.0100 | $20.00 | $0.1000 | $200.00 | $0.0100 | $20.00 | $0.0300 | $60.00 | $0.0100 | $20.00 |
| 628.1905 | Mobilizations Erosion Control | 2 | EACH | $100.0000 | $200.00 | $252.7500 | $505.50 | $100.0000 | $200.00 | $203.0000 | $406.00 | $100.0000 | $200.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 1 | EACH | $100.0000 | $100.00 | $505.5000 | $505.50 | $100.0000 | $100.00 | $213.0000 | $213.00 | $100.0000 | $100.00 |
| 628.7570 | Rock Bags | 50 | EACH | $22.0000 | $1,100.00 | $8.5900 | $429.50 | $22.0000 | $1,100.00 | $12.0000 | $600.00 | $22.0000 | $1,100.00 |
| 633.0100 | Delineator Posts Steel | 70 | EACH | $40.0000 | $2,800.00 | $75.9300 | $5,315.10 | $40.0000 | $2,800.00 | $38.0000 | $2,660.00 | $40.0000 | $2,800.00 |
| 633.0500 | Delineator Reflectors | 70 | EACH | $10.0000 | $700.00 | $7.5800 | $530.60 | $10.0000 | $700.00 | $20.0000 | $1,400.00 | $10.0000 | $700.00 |
| 642.5201 | Field Office Type C | 1 | EACH | $8,500.0000 | $8,500.00 | $10,110.0000 | $10,110.00 | $12,000.0000 | $12,000.00 | $15,000.0000 | $15,000.00 | $11,000.0000 | $11,000.00 |
| 643.0300 | Traffic Control Drums | 90,000 | DAY | $0.1800 | $16,200.00 | $0.2500 | $22,500.00 | $0.1800 | $16,200.00 | $0.1800 | $16,200.00 | $0.2500 | $22,500.00 |
| 643.0370.S | Digital Speed Reduction System (DSRS) | 170 | DAY | $105.0000 | $17,850.00 | $53.8800 | $9,159.60 | $105.0000 | $17,850.00 | $105.0000 | $17,850.00 | $53.2900 | $9,059.30 |
| 643.0420 | Traffic Control Barricades Type III | 1,500 | DAY | $1.0000 | $1,500.00 | $1.0100 | $1,515.00 | $1.0000 | $1,500.00 | $1.0000 | $1,500.00 | $1.0000 | $1,500.00 |
| 643.0705 | Traffic Control Warning Lights Type A | 3,000 | DAY | $0.1500 | $450.00 | $0.1100 | $330.00 | $0.1500 | $450.00 | $0.1500 | $450.00 | $0.1100 | $330.00 |
| 643.0715 | Traffic Control Warning Lights Type C | 5,500 | DAY | $0.1500 | $825.00 | $0.1300 | $715.00 | $0.1500 | $825.00 | $0.1500 | $825.00 | $0.1300 | $715.00 |
| 643.0810 | Traffic Control Connected Arrow Boards | 170 | DAY | $13.5000 | $2,295.00 | $20.2200 | $3,437.40 | $13.5000 | $2,295.00 | $13.5000 | $2,295.00 | $20.0000 | $3,400.00 |
| 643.0900 | Traffic Control Signs | 8,000 | DAY | $0.2200 | $1,760.00 | $0.5100 | $4,080.00 | $0.2200 | $1,760.00 | $0.2200 | $1,760.00 | $0.5000 | $4,000.00 |
| 643.0920 | Traffic Control Covering Signs Type II | 4 | EACH | $125.0000 | $500.00 | $60.6600 | $242.64 | $125.0000 | $500.00 | $125.0000 | $500.00 | $60.0000 | $240.00 |
| 643.1000 | Traffic Control Signs Fixed Message | 97.25 | SF | $20.0000 | $1,945.00 | $20.2200 | $1,966.40 | $20.0000 | $1,945.00 | $20.0000 | $1,945.00 | $20.0000 | $1,945.00 |
| 643.1070 | Traffic Control Cones 42-Inch | 50,500 | DAY | $0.1800 | $9,090.00 | $0.2500 | $12,625.00 | $0.1800 | $9,090.00 | $0.1800 | $9,090.00 | $0.2500 | $12,625.00 |
| 643.1205.S | Basic Traffic Queue Warning System | 170 | DAY | $80.0000 | $13,600.00 | $81.6700 | $13,883.90 | $80.0000 | $13,600.00 | $80.0000 | $13,600.00 | $80.7800 | $13,732.60 |
| 643.1220 | Traffic Control Connected Work Zone Start and End Location Markers | 170 | DAY | $11.0000 | $1,870.00 | $20.2200 | $3,437.40 | $11.0000 | $1,870.00 | $11.0000 | $1,870.00 | $20.0000 | $3,400.00 |
| 643.3180 | Temporary Marking Line Removable Tape 6-Inch | 7,380 | LF | $1.7500 | $12,915.00 | $2.5300 | $18,671.40 | $1.7500 | $12,915.00 | $1.7500 | $12,915.00 | $2.5000 | $18,450.00 |
| 643.3280 | Temporary Marking Line Removable Tape 10-Inch | 1,200 | LF | $3.5000 | $4,200.00 | $4.5500 | $5,460.00 | $3.5000 | $4,200.00 | $3.5000 | $4,200.00 | $4.5000 | $5,400.00 |
| 643.3960 | Temporary Marking Removable Mask Out Tape 6-Inch | 586 | LF | $2.7500 | $1,611.50 | $3.1400 | $1,840.04 | $2.7500 | $1,611.50 | $2.7500 | $1,611.50 | $3.1100 | $1,822.46 |
| 643.5000 | Traffic Control | 1 | EACH | $77,250.0000 | $77,250.00 | $50,778.1600 | $50,778.16 | $77,250.0000 | $77,250.00 | $77,250.0000 | $77,250.00 | $50,225.6800 | $50,225.68 |
| 646.2020 | Marking Line Epoxy 6-Inch | 1,257 | LF | $0.4700 | $590.79 | $0.8100 | $1,018.17 | $0.4700 | $590.79 | $0.4700 | $590.79 | $0.7000 | $879.90 |
| 646.2025 | Marking Line Grooved Black Epoxy 6-Inch | 14,474 | LF | $0.8500 | $12,302.90 | $1.1600 | $16,789.84 | $0.8500 | $12,302.90 | $0.8500 | $12,302.90 | $0.9500 | $13,750.30 |
| 646.2040 | Marking Line Grooved Wet Ref Epoxy 6-Inch | 106,670 | LF | $1.3300 | $141,871.10 | $1.4200 | $151,471.40 | $1.3300 | $141,871.10 | $1.3300 | $141,871.10 | $1.4500 | $154,671.50 |
| 646.2050 | Marking Line Grooved Permanent Tape 6-Inch | 14,410 | LF | $6.9000 | $99,429.00 | $7.3800 | $106,345.80 | $6.9000 | $99,429.00 | $6.9000 | $99,429.00 | $7.2500 | $104,472.50 |
| 646.4050 | Marking Line Grooved Permanent Tape 10-Inch | 7,575 | LF | $12.0500 | $91,278.75 | $14.1500 | $107,186.25 | $12.0500 | $91,278.75 | $12.0500 | $91,278.75 | $12.2500 | $92,793.75 |
| 646.5020 | Marking Arrow Epoxy | 40 | EACH | $376.4300 | $15,057.20 | $298.2500 | $11,930.00 | $376.4300 | $15,057.20 | $376.4300 | $15,057.20 | $300.0000 | $12,000.00 |
| 646.5120 | Marking Word Epoxy | 20 | EACH | $380.9900 | $7,619.80 | $343.7400 | $6,874.80 | $380.9900 | $7,619.80 | $380.9900 | $7,619.80 | $400.0000 | $8,000.00 |
| 646.6120 | Marking Stop Line Epoxy 18-Inch | 190 | LF | $15.7800 | $2,998.20 | $25.2800 | $4,803.20 | $15.7800 | $2,998.20 | $15.7800 | $2,998.20 | $19.0000 | $3,610.00 |
| 646.6466 | Cold Weather Marking Epoxy 6-Inch | 3,250 | LF | $0.0100 | $32.50 | $0.3400 | $1,105.00 | $0.4700 | $1,527.50 | $0.4700 | $1,527.50 | $0.7500 | $2,437.50 |
| 646.6470 | Cold Weather Marking Epoxy 10-Inch | 100 | LF | $0.0100 | $1.00 | $0.8100 | $81.00 | $1.0500 | $105.00 | $1.0500 | $105.00 | $1.2500 | $125.00 |
| 646.9055 | Marking Removal Line Grooved Contrast Permanent Tape 4-Inch | 14,474 | LF | $1.6500 | $23,882.10 | $0.0100 | $144.74 | $1.6500 | $23,882.10 | $1.6500 | $23,882.10 | $1.7000 | $24,605.80 |
| 650.8000 | Construction Staking Resurfacing Reference | 57,880 | LF | $0.1200 | $6,945.60 | $0.0800 | $4,630.40 | $0.1200 | $6,945.60 | $0.1200 | $6,945.60 | $0.1200 | $6,945.60 |
| 650.9911 | Construction Staking Supplemental Control (project) 01. 6290-05-61 | 1 | EACH | $5.0000 | $5.00 | $2,527.5000 | $2,527.50 | $5.0000 | $5.00 | $5.0000 | $5.00 | $5.0000 | $5.00 |
| 690.0150 | Sawing Asphalt | 1,123 | LF | $1.4000 | $1,572.20 | $1.4200 | $1,594.66 | $2.5000 | $2,807.50 | $3.4000 | $3,818.20 | $1.4000 | $1,572.20 |
| 690.0250 | Sawing Concrete | 11,900 | LF | $2.2000 | $26,180.00 | $2.2200 | $26,418.00 | $2.5000 | $29,750.00 | $3.2000 | $38,080.00 | $2.2000 | $26,180.00 |
| 715.0720 | Incentive Compressive Strength Concrete Pavement | 500 | DOL | $1.0000 | $500.00 | $1.0000 | $500.00 | $1.0000 | $500.00 | $1.0000 | $500.00 | $1.0000 | $500.00 |
| 999.2100.S | Installing and Maintaining Climbing Turtle Exclusion Fence | 750 | LF | $5.0000 | $3,750.00 | $5.9100 | $4,432.50 | $5.0000 | $3,750.00 | $4.0300 | $3,022.50 | $5.0000 | $3,750.00 |
| SPV.0060 | Special 02. Digital Speed Limit Trailer Pad | 265 | EACH | $542.5000 | $32,590.00 | $796.1650 | $35,942.32 | $37.5050 | $19,050.11 | $512.5000 | $17,350.00 | $408.0200 | $45,426.44 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.