WI
Wisconsin DOT · Bid Tabulation
Contract 20260414023
Durand - Mondovi; Pepin County Line to CTH A
- County
- Buffalo
- Letting
- April 14, 2026
- Bidders
- 1
Apparent low bid
MONARCH PAVING COMPANY
$3,347,851.25
Bid Items - unit price and extension by bidder
| Item | Description | Qty | UOM | MONARCH PAVING COMPANY $3,347,851.25 | |
|---|---|---|---|---|---|
| Unit Price | Extension | ||||
| 202.0105 | Roadside Clearing | 3 | STA | $125.0000 | $375.00 |
| 204.0115 | Removing Asphaltic Surface Butt Joints | 455 | SY | $13.9200 | $6,333.60 |
| 204.0120 | Removing Asphaltic Surface Milling | 94,200 | SY | $3.7100 | $349,482.00 |
| 204.0165 | Removing Guardrail | 1,715 | LF | $3.9000 | $6,688.50 |
| 208.0100 | Borrow | 10 | CY | $46.5000 | $465.00 |
| 211.0101 | Prepare Foundation for Asphaltic Paving (project) 01. 1530-06-79 | 1 | EACH | $75,967.2000 | $75,967.20 |
| 213.0100 | Finishing Roadway (project) 01. 1530-06-79 | 1 | EACH | $4,956.5400 | $4,956.54 |
| 305.0110 | Base Aggregate Dense 3/4-Inch | 822 | TON | $60.0100 | $49,328.22 |
| 305.0120 | Base Aggregate Dense 1 1/4-Inch | 31 | TON | $46.7000 | $1,447.70 |
| 455.0605 | Tack Coat | 11,470 | GAL | $3.3500 | $38,424.50 |
| 460.0105.S | HMA Percent Within Limits (PWL) Test Strip Volumetrics | 1 | EACH | $12,230.0000 | $12,230.00 |
| 460.0110.S | HMA Percent Within Limits (PWL) Test Strip Density | 3 | EACH | $2,250.0000 | $6,750.00 |
| 460.2005 | Incentive Density PWL HMA Pavement | 10,230 | DOL | $1.0000 | $10,230.00 |
| 460.2007 | Incentive Density HMA Pavement Longitudinal Joints | 13,760 | DOL | $1.0000 | $13,760.00 |
| 460.2010 | Incentive Air Voids HMA Pavement | 17,270 | DOL | $1.0000 | $17,270.00 |
| 460.6225 | HMA Pavement 5 MT 58-28 S | 17,270 | TON | $95.2400 | $1,644,794.80 |
| 460.9000.S | Material Transfer Vehicle | 1 | EACH | $20,200.0000 | $20,200.00 |
| 465.0105 | Asphaltic Surface | 500 | TON | $175.0000 | $87,500.00 |
| 465.0110 | Asphaltic Surface Patching | 300 | TON | $175.0000 | $52,500.00 |
| 465.0560 | Asphaltic Rumble Strips, Centerline | 18,205 | LF | $0.8900 | $16,202.45 |
| 520.8000 | Concrete Collars for Pipe | 3 | EACH | $1,375.0000 | $4,125.00 |
| 520.8700 | Cleaning Culvert Pipes | 14 | EACH | $1,235.0000 | $17,290.00 |
| 522.0124 | Culvert Pipe Reinforced Concrete Class III 24-Inch | 8 | LF | $258.0000 | $2,064.00 |
| 522.0130 | Culvert Pipe Reinforced Concrete Class III 30-Inch | 8 | LF | $310.0000 | $2,480.00 |
| 522.0142 | Culvert Pipe Reinforced Concrete Class III 42-Inch | 8 | LF | $446.0000 | $3,568.00 |
| 522.1042 | Apron Endwalls for Culvert Pipe Reinforced Concrete 42-Inch | 1 | EACH | $4,165.0000 | $4,165.00 |
| 606.0200 | Riprap Medium | 43 | CY | $124.5000 | $5,353.50 |
| 614.0010 | Barrier System Grading Shaping Finishing | 11 | EACH | $4,950.0000 | $54,450.00 |
| 614.2300 | MGS Guardrail 3 | 487.5 | LF | $24.0000 | $11,700.00 |
| 614.2330 | MGS Guardrail 3 K | 262.5 | LF | $37.0000 | $9,712.50 |
| 614.2340 | MGS Guardrail 3 L | 425 | LF | $27.0000 | $11,475.00 |
| 614.2500 | MGS Thrie Beam Transition | 157.6 | LF | $101.0000 | $15,917.60 |
| 614.2610 | MGS Guardrail Terminal EAT | 18 | EACH | $3,600.0000 | $64,800.00 |
| 618.0100 | Maintenance and Repair of Haul Roads (project) 01. 1530-06-79 | 1 | EACH | $0.0100 | $0.01 |
| 619.1000 | Mobilization | 1 | EACH | $331,515.9300 | $331,515.93 |
| 624.0100 | Water | 10.1 | MGAL | $53.3700 | $539.04 |
| 628.1504 | Silt Fence | 6,600 | LF | $1.7500 | $11,550.00 |
| 628.1520 | Silt Fence Maintenance | 6,600 | LF | $0.0100 | $66.00 |
| 628.1905 | Mobilizations Erosion Control | 2 | EACH | $100.0000 | $200.00 |
| 628.1910 | Mobilizations Emergency Erosion Control | 2 | EACH | $50.0000 | $100.00 |
| 628.7570 | Rock Bags | 234 | EACH | $8.6500 | $2,024.10 |
| 642.5001 | Field Office Type B | 1 | EACH | $17,758.4700 | $17,758.47 |
| 643.0300 | Traffic Control Drums | 300 | DAY | $0.7000 | $210.00 |
| 643.0900 | Traffic Control Signs | 1,060 | DAY | $1.0000 | $1,060.00 |
| 643.1000 | Traffic Control Signs Fixed Message | 36 | SF | $21.0000 | $756.00 |
| 643.3165 | Temporary Marking Line Paint 6-Inch | 43,370 | LF | $0.5500 | $23,853.50 |
| 643.3170 | Temporary Marking Line Epoxy 6-Inch | 21,690 | LF | $0.9000 | $19,521.00 |
| 643.5000 | Traffic Control | 1 | EACH | $91,939.7300 | $91,939.73 |
| 645.0120 | Geotextile Type HR | 104 | SY | $4.8500 | $504.40 |
| 646.2040 | Marking Line Grooved Wet Ref Epoxy 6-Inch | 78,802 | LF | $1.2000 | $94,562.40 |
| 646.4720 | Marking Line Same Day Epoxy 6-Inch | 1,200 | LF | $0.9000 | $1,080.00 |
| 648.0100 | Locating No-Passing Zones | 5.22 | MI | $600.0000 | $3,132.00 |
| 650.8000 | Construction Staking Resurfacing Reference | 27,546 | LF | $0.0500 | $1,377.30 |
| 650.9911 | Construction Staking Supplemental Control (project) 01. 1530-06-79 | 1 | EACH | $122.7000 | $122.70 |
| 740.0440 | Incentive IRI Ride | 16,110 | DOL | $1.0000 | $16,110.00 |
| 999.2005.S | Maintaining Bird Deterrent System (station) 06. 308+52 | 6 | EACH | $1,370.0000 | $8,220.00 |
| 999.2105.S | Maintaining Climbing Turtle Exclusion Fence | 2,925 | LF | $1.5000 | $4,387.50 |
| SPV.0060 | Special 02. Cleaning Box Culverts | 30 | EACH | $2,890.0000 | $74,670.00 |
| SPV.0090 | Special 02. Install and Maintain Turtle Fence | 2,226 | LF | $278.8050 | $20,585.06 |
Source: public Wisconsin DOT letting records, republished by BidTabs.us. Figures are reproduced as submitted at letting.
Want the analysis, not just the numbers?
DOTestimate turns these same tabs into price-trend analysis, quick estimates, and contractor intel.
Explore DOTestimate →